Chapter - I

PARTICULARS OF ORGANISATION, FUNCTIONS AND DUTIES

a) Date of incorporation 7 November, 1975
b) Mode of incorporation Incorporated under Companies Act 1956 as a Private Limited Company under the name National Thermal Power Corporation Private Ltd. However, the word "Private" was deleted on 30 Sept., 1976 consequent upon notification issued by GoI exempting Government Companies from the use of word "Private". The Company was converted to Public Ltd. Company on 30 Sept., 1985. Name of the Company was changed to NTPC Limited on 28 Oct., 2005.
c) Administrative Ministry Ministry of Power, Government of India
d) Details of Disinvestments The Govt. of India was holding the entire paid- up capital of the Company till October 2004. After divestment of 5.25% of its holding by GOI and fresh issue of 5.25% by the Company to the public through Initial Public Offering in October 2004, the holding of GOI reduced to 89.5%.

In February 2010, the GOI divested 5% stake in NTPC through FPO (Alternate Book Building Method) and the holding of GOI reduced to 84.5%.

In February 2013, the GOI divested its 9.5% stake in NTPC through (Offer For Sale) OFS (Stock Exchange Mechanism) and reduced the holding of GOI in NTPC to 6,18,40,98,300 shares i.e. 75% out of total 8,24,54,64,400 shares. 
 
In May 2014, GOI issued 34,83,320 shares being 0.04% of paid-up capital which were allotted to eligible employees of NTPC. This offer for sale to NTPC employees was in terms of approval of Cabinet Committee on Economic Affairs which approved disinvestment of 9.5% through OFS through stock exchange mechanism. As a result of this issue, GoI shareholding came down from 618,40,98,300 (being 75% of paid up equity capital) to 618,06,14,980 (being 74.96% of paid up equity capital).

In June 2016, the GOI further divested its approximately, 0.22% stake through Employee OFS. After Employee OFS stake of GOI in NTPC is reduced to 69.74%.

The balance is held by public, FIIs, Mutual Funds and Banks.
e) Present status A Government Company within the meaning of Section 2 (45) of the Companies Act, 2013.
f) Share Capital  
 
  • Authorised
  • Subscribed, issued &
    paid-up
Rs. 10,000.00 crore 
Rs. 8,245.46 crore
g) Present Shareholding Click Here
h) Listing with Stock
Exchanges
The equity shares of the Company are presently listed with the following stock exchanges
  • BSE Limited
  • National Stock Exchange of India Limited
i) Address of 
Registered Office
NTPC Bhawan
SCOPE Complex 
7, Institutional Area 
Lodi Road
New Delhi – 110 003 
Phone N0. (011) 24360100 
Fax No. (011) 24361018 
Email: ntpccc@ntpc.co.in  
Website: www.ntpc.co.in. 
Corporate Identity Number: L40101DL1975GOI007966
j) Address of Company’s 
Registrar & Transfer Agent
1.1.    For Shares:
Karvy Computershare Private Ltd.
Karvy Selenium Tower B,
Plot No. 31 & 32,
Gachibowli Financial District,
Nanakramguda, Serillingampally,
Hyderabad – 500 081.
Phone No. – +91-(040) – 67161518,
Email : einwards.ris@karvy.com 
Website: www.karvycomputershare.com
  1. For bonds: Click Here
(a) Registrar and Transfer Agent for Equity Shares, Tax Free Bonds (Series 50 – 1A, 2A, 3A, 1B, 2B, 3B) and Bonus Debentures (Series 54) and Tax Free Bonds 2015 (Series 56).

Karvy Computer Share Pvt. Ltd.
Karvy Selenium Tower B, Plot No. 31 & 32,
Gachibowli Financial District,
Nanakramguda, Serilingampally,
Hyderabad-500008
Phone No: 040-67161518
Email: einward.ris@karvy.com

(
b) Registrar and Transfer Agent for Bonds (Series 19 to 26)

MAS Services Ltd.
T-34, 2nd Floor, Okhla Industrial Area, Phase-II
New Delhi-110020.
Phone No: 011-26387281 / 82 / 83.
Fax: 011-26387384
Email: sm@masserv.com

(c) Registrar and Transfer Agent for Bonds (Series 13A, 13B, 16, 17, 27 to 49 and 51 to 53, 55 and 57 to 59)

Beetal Financial & Computer Services Pvt. Ltd.
99, Madangir, Near Dada Harsukh Das Mandir
New Delhi-110062.
Phone No: 011-29961281, 29961282
Fax: 011-29961284
Email: beetalrta@gmail.com
 

Company’s Vision, Mission and Core Values

VISION

"To Be World’s Leading Power Company, Energizing India’s Growth."

MISSION

“Provide Reliable Power And Related Solutions In An Economic Efficient And Environment Friendly Manner, Driven By Innovation And Agility”.

CORE VALUES
(ICOMIT)

I Integrity
C Customer Focus
O Organisational Pride
M Mutual Respect & Trust
I Innovation & Learning
T Total Quality & Safety

NTPC has been established to carry out the objectives specified in the Memorandum & Articles of Association of the Company as amended from time to time. The main activities of NTPC are setting up of power plants and power generation through its coal-based and gas-based power plants. The Company has also diversified into construction of hydro power plants and generation of hydro power besides power trading and distribution of electricity. The Company has entered into area of coal mining & coal washery and oil exploration as well. The company has also ventured into Nuclear Power and Renewable Energy.

The business portfolio of the company is as under:

  1. Power Project Construction. 
  2. Renovation & Modernization of Power Stations
  3. Generation of Electric Power. 
  4. Coal Mining and Coal Washery. 
  5. Oil/ Gas Exploration. 
  6. Distribution and Trading of Electricity through its wholly-owned subsidiary companies.

The company is also participating, in to following businesses through its Joint Venture Companies:

  • Power equipment manufacturing
  • Power related services
  • Energy efficiency services
  • Renewable Energy
  • Nuclear Power
  • Urea
CORPORATE OFFICE:
NTPC BHAWAN
CORE-7, SCOPE COMPLEX,
7, INSTITUTIONAL AREA, 
LODHI ROAD,
NEW DELHI-110003
REGIONAL HEADQUARTERS: EASTERN REGION - I
2nd FLOOR, LOKNAYAK JAIPRAKASH BHAWAN,
DAK BUNGALOW CHOWK PATNA 
BIHAR– 800001
EASTERN REGION -II 
OLIC BUILDING, PLOT NO. N17/2,
NAYAPALLI, BHUBANESWAR, 
ORISSA- 751012
OTHER OFFICES:
ENGINEERING OFFICE COMPLEX 
SECTOR - 24, NOIDA
DISTT. GAUTAM BUDH NAGAR
UTTAR PRADESH- 201301

 

NTPC ENERGY TECHNOLOGY RESEARCH ALLIANCE (NETRA),
E3, ECHOTECH II, UDYOG VIHAR GREATER NOIDA
DISTT. GAUTAM BUDH NAGAR
UTTAR PRADESH-201306

POWER MANAGEMENT INSTITUTE 
PLOT NO.5-14, SECTOR-16A, 
NOIDA,
DISTT. GAUTAM BUDH NAGAR
UTTAR PRADESH-201301

 

NATIONAL CAPITAL REGION
EOC ANNEXE, NTPC LTD.,
PLOT NO. A - 8A,
SECTOR – 24, NOIDA 
DISTT. GAUTAM BUDH NAGAR 
UTTAR PRADESH- 201301
NORTHERN REGION 
TC-33V-1,VIBHUTI KHAND, 
GOMTI NAGAR LUCKNOW 
UTTAR PRADESH- 226010
SOUTHERN REGION
2nd & 5th FLOOR, MCH COMPLEX,
R.P. ROAD, SECUNDERABAD,
ANDHRA PRADESH- 500003 
WESTERN REGION -I
SAMRUDDHI VENTURE PARK 
2nd FLOOR,MIDC, MAROL 
ANDHERI (EAST) MUMBAI 
MAHARASHTRA- 400093 
WESTERN REGION –II
MAGNETO-CONCLAVE-OFFIZO, 3rd & 4th FLOOR, LABHANDI, GE ROAD, RAIPUR 
CHHATTISGARH-492001 
HYDRO REGION HEAD QUARTERS
O.I.B.D. BHAWAN, 7th FLOOR, PLOT NO.-2, SECTOR-73, NOIDA 
DISTT. GAUTAM BUDH NAGAR 
UTTAR PRADESH- 201301

 

 

PROJECTS:

 

ANTA GAS POWER PROJECT
P.O. ANTA, DISTT. BARAN
RAJASTHAN– 325209
AURAIYA GAS POWER PROJECT
P.O. DIBIYAPUR, 
DISTT. AURAIYA 
UTTAR PRADESH– 206244
BARH SUPER THERMAL POWER PROJECT
P.O. BARH, DISTT. PATNA 
BIHAR–803215
BADARPUR THERMAL POWER STATION
BADARPUR 
NEW DELHI–110044
FARAKKA SUPER THERMAL POWER STATION
P.O. NABARUN, 
DISTT. MURSHIDABAD
WEST BENGAL–742336
FARIDABAD GAS POWER PROJECT
RASHMIPURAM VILLAGE MUJEDI, 
DISTT. FARIDABAD 
HARYANA-121004
FEROZ GANDHI UNCHAHAR THERMAL POWER PROJECT 
P.O. UNCHAHAR, DISTT. RAI BAREILLY 
UTTAR PRADESH-229406
JHANOR-GANDHAR GAS POWER PROJECT 
P.O. URJA NAGAR, JHANOR 
DISTT. BHARUCH, 
GUJARAT– 392215 
KORBA SUPER THERMAL POWER STATION 
P.O. VIKASH BHAWAN, JAMANIPALI 
DISTT. KORBA, 
CHATTISGARH– 495450
KAHALGAON SUPER THERMAL POWER PROJECT 
P.O. KAHALGAON, 
DISTT. BHAGALPUR 
BIHAR– 813214 
KAWAS GAS POWER PROJECT 
P.O. ADITYANAGAR, SURAT
GUJARAT– 394516

 

RAJEEV GANDHI COMBINED CYCLE POWER PROJECT
P.O. CHOOLATHERUVU, 
DISTT. ALAPPUZHA
KERALA– 690506
KOLDAM HYDRO POWER PROJECT 
P.O. BARMANA, DISTT. BILASPUR  
HIMACHAL PRADESH– 174013
NATIONAL CAPITAL POWER STATION 
VIDYUT NAGAR, 
DISTT. GAUTAM BUDH NAGAR 
UTTAR PRADESH– 201008 
NORTH KARANPURA SUPER THERMAL POWER PROJECT 
AGRAWAL REST HOUSE, MALVIYA MARG, JHANDA CHOWK
HAZARIBAGH 
JHARKHAND– 825301
RAMAGUNDAM SUPER THERMAL POWER STATION 
P.O. JYOTHINAGAR, 
DISTT. KARIMNAGAR 
ANDHRA PRADESH–505215
RIHAND SUPER THERMAL POWER PROJECT 
P.O. RIHANDNAGAR, 
DISTT. SONEBHADRA
UTTAR PRADESH-231223
SIMHADRI SUPER THERMAL POWER PROJECT 
P.O. SIMHADRI, 
DISTT. VISHAKHAPATNAM
ANDHRA PRADESH– 531020
SINGRAULI SUPER THERMAL POWER STATION 
P.O. SHAKTINAGAR, 
DISTT. SONEBHADRA
UTTAR PRADESH-231222
SIPAT SUPER THERMAL POWER PROJECT 
P.O. UJJWAL NAGAR, 
DISTT. BILASPUR 
CHHATTISGARH– 495555

 

 

TALCHER SUPER THERMAL POWER PROJECT 
P.O. DEEPSHIKHA (KANIHA) 
DISTT. ANGUL
ORISSA– 759147
TALCHER THERMAL POWER STATION 
P.O. TALCHER THERMAL 
DISTT. ANGUL 
ORISSA– 759101 
TANDA THERMAL POWER STATION 
P.O. VIDYUTNAGAR, 
DISTT. AMBEDKAR NAGAR
UTTAR PRADESH-224238
DARLIPALLI SUPER THERMAL POWER PROJECT
3rd & 4th FLOOR, AMBA TOWER, HOSPITAL ROAD SUNDARGARH ORISSA-770001 
GAJAMARA SUPER THERMAL POWER PROJECT
MAHISHAPAT, DISTT: DHENKANAL, ORISSA – 759013
MOUDA SUPER THERMAL POWER PROJECT
MOUDA-RAMTEK ROAD, P.O. MOUDA, DISTT: NAGPUR
MAHARASHTRA-441104
GADARWARA SUPER THERMAL POWER PROJECT
NTPC LTD, NEAR BIRGHT CAREER COMPUTER CENTRE, THAKUR BABU KI GALI, ANAND NAGAR, KANDELI NARSINGHPUR, 
MADHYA PRADESH- 487001
KHARGONE SUPER THERMAL POWER PROJECT
NTPC LTD, 61, GANGA NAGAR, SANAWAD ROAD, KHARGONE, MADHYA PRADESH- 450001
KUDGI SUPER THERMAL POWER PROJECT
PLOT NO. 9, MALLIKARJUNA NAGAR 
NEAR BYPASS ROAD, BIJAPUR
KARNATAKA-586022

 

 

TAPOVAN VISHNUGAD HYDROELECTRIC POWER PROJECT 
NTPC LTD. KAGBHUSHANDI OFFICE, NEAR GARHWAL SCOUTS, BADRINATH ROAD, JOSHI MATH, DISTT. CHAMOLI 
UTTARAKHAND-246443 
VINDHYACHAL SUPER THERMAL POWER STATION 
P.O. VINDHYANAGAR, 
DISTT. SIDHI
MADHYA PRADESH– 486885
BONGAIGAON THERMAL POWER PROJECT
P.O. SALAKATI(P) 
DISTT: KOKARAJHAR (BTAD) 
ASSAM - 783369
SOLAPUR SUPER THERMAL POWER PROJECT
VILLAGE FATATEWADI, POST: HOTGI STATION, TALUKA SOUTH SOLAPUR, MAHARASHTRA-413215
LARA SUPER THERMAL POWER PROJECT
NTPC LTD, PRACHI VIHAR, BADE ATARMUDA, DIST. RAIGARH  CHATTISHGARH– 496001
BARETHI SUPER THERMAL POWER PROJECT
NTPC LTD, D117 GREEN AVENUE, SATAI ROAD, DISTT. CHATTARPUR, 
MADHYA PRADESH- 471001
RUPSIYABAGAR KHASIABARA HYDRO POWER PROJECT
MADKOT ROAD, POST-MUNSYARI, DISTT. PITHORAGARH, 
UTTARAKHAND – 262554
KOLODYNE-II HYDRO POWER PROJECT
P.O. BOX NO. 01, P.O. LAWNGTLAI MIZORAM-796891
BILHAUR SUPER THERMAL POWER PROJECT
GUPTA COMPLEX, GT ROAD, PURA 
P.O. PURA, TEHSIL-BILHAUR 
DISTT- KANPUR NAGAR 
UTTAR PRADESH-209092

 

 

COAL MINING PROJECTS:
PAKRI BARWADIH, CHATTI-BARIATU & KERENDARI COAL MINING PROJECTS
UJJWAL COMPLEX, PUGMIL ROAD, HAZARIBAGH
JHARKHAND-825301

 

TALAIPALLI COAL MINING
PROJECT
56, GAJANAND PURAM, KOTRA THANA ROAD RAIGARH, 
CHHATTISGARH-496001
DULANGA COAL MINING PROJECT
PLOT NO. 681/26 MISSION ROAD, SUNDERGARH 
ORISSA-770001

 

The names of Joint Ventures/Subsidiaries and their areas of operation/business are given below:

Joint Ventures:

S.No. Company Name
(Incorporated on)
Promoters
Equity holding
Capacity (MW) Objective
Power Generation
1. NTPC-SAIL Power Company Pvt. Ltd. (08.02.1999) NTPC-50%
SAIL-50%
814 To operate & maintain the Captive power plants of Durgapur, Rourkela & Bhillai
2. Aravali Power Company Private Ltd.
(21.12.2006)
NTPC-50%
IPGCL-25%
HPGCL-25%
1500 To set up & operate 3X500 MW Indira Gandhi Super Thermal Power Project at Jhajjar, Haryana.
3. NTPC Tamil Nadu Energy Company Ltd. 
(23.05.2003)
NTPC-50%
TNEB-50%
1500 To set up & operate 3X500 MW Coal based power project at Vallur, Tamil Nadu
4. Meja Urja Nigam Private Ltd. 
(02.04.2008)
NTPC-50%
UPRVUNL-50%
1320 To set up & operate 2X660 MW power project at Meja Tehsil in Allahabad district in UP
5. Nabinagar Power Generating Company Private Ltd. 
(09.09.2008)
NTPC-50%
BSEB-50%
1980 To set up & operate 3X660 MW Power project in Nabinagar, Aurangabad district in Bihar
6. Ratnagiri Gas and Power Pvt. Ltd. 
(08.07.2005)
NTPC & GAIL -25.51% each ,
IFIs-35.47%
MSEB Holding Co.-13.51%
1967 To own & operate the assets of erstwhile Dabhol power plant in Ratnagiri 1967 MW and 5 MMTPA LNG Re-gasification terminal
7. Trincomalee Power Co. Ltd. 
(26.09.2011)
NTPC-50%
Ceylon Electricity Board-50%
500 For setting up 2X250 MW coal based power plant in Trincomalee Region in Sri Lanka
8. Bangladesh- India Friendship Power Company Pvt. Ltd. 
(31.10.2012)
NTPC-50%
Bangladesh Power Development Board- 50%
1320 Setting up and implementing coal based Power plant (s) in Bangladesh
9. Anushakti Vidhyut Nigam Ltd. 
(27.11.2010)
NTPC – 49 %
NPCIL – 51 %
- Development of nuclear power projects in the country.
10. Pan Asian Renewables Pvt. Ltd. 
(14.10.11)
NTPC-50%
ADB-25%
Kyuden-25%
- Development of 500 MW of Renewable Power generation resources in India. The company is under the process of winding up. Under Closure Process.
Power Equipment Manufacturing
S.No. Company Name
(Incorporated on)
Promoters
Equity holding
Objective
11. NTPC BHEL Power Projects Pvt Ltd. 
(28.04.2008)
NTPC-50%
BHEL-50%
To take up EPC contracts and manufacturing of equipments for power plants and other infrastructure projects in India & abroad
12. BF-NTPC Energy Systems Ltd. 
(19.06.2008)
NTPC-49%
Bharat Forge Ltd.-51%
To initially take up manufacturing of castings, forgings, fittings, high pressure piping required for power projects and other industries and Balance of Plant (BOP) equipment. Under Closure Process.
13. Transformer & Electricals Kerala Ltd. (44.6% shares acquired by NTPC on 19.06.2009). Incorporated on 19.12.1963 NTPC-44.6%
Govt. of Kerala-55.56%
Banks-0.84%
For manufacturing and repair of high voltage transformers and associated equipment.
Power Services
14. National Power Exchange Ltd. 
(11.12.2008)
NTPC - 16.67 %
NHPC - 16.67 %
PFC  - 16.66 %
BSE   -  16.66 %
TCS  - 19.04 %
Others - 14.30%
NTPC Board in its meeting held on November 7th, 2012 approved the proposal of NTPC's exit from NPEX. The decision of NTPC to exit from NPEX has been communicated to other promoters of NPEX. Under Closure Process.
15. Utility Powertech Ltd.
(23.11.1995)
NTPC-50%
Reliance Infrastructure Ltd.-50%
To take up assignments of construction, erection and supervision in power sector and other sectors in India and abroad
16. NTPC-Alstom Power Services Private Ltd.
(27.09.1999)
NTPC-50%
Alstom Power 50%
To take up Renovation & Modernisation assignments of Power Plants both in India & SAARC countries
17. National High Power Test Laboratory Private Ltd. 
(22.05.2009)
NTPC-21.63%
NHPC-21.63%
PGCIL-21.63%
DVC-13.46%
CPRI-21.63%
For setting up an online High Power Test Laboratory for short-circuit test facility in the country.
18. Energy Efficiency Services Ltd. 
(10.12.2009)
NTPC-28.8%
PFC-28.8%
PGCIL-13.6%
REC-28.8%
To carry out and promote the business of Energy Efficiency, Energy Conservation and Climate Change.
Coal Mining
19. International Coal Ventures Pvt. Ltd. 
(20.05.2009)
NTPC – 0.27, RINL & NMDC -24.80% each
SAIL-49.59% &  CIL-0.54% each

NTPC Board has approved the proposal for withdrawal from ICVL. Letter issued to ICVL for withdrawal. ICVL is in the process of obtaining cabinet clearance on the same.

20. NTPC-SCCL Global Venture Pvt. Ltd. 
(30.07.2007)
NTPC-50%
Singareni Collieries Co. Ltd.-50%
To undertake the development and O&M of coal blocks and integrated coal based power projects in India and overseas.
Under closure process.
21. CIL NTPC Urja Pvt Ltd
(27.04.2010)
NTPC – 50%
CIL – 50%
Development, operation and maintenance of Brahmini & Chichro Patsimal coal blocks in Jharkhand. These blocks have been de-allocated.

Subsidiaries:

S.No. Company Name
(Incorporated on)
Promoters
Equity holding
Objective
Power Generation
1. Bhartiya Rail Bijlee Company Ltd.
(22.11.2007)
NTPC-74%
Indian Railways-26%
To set up a power plant of 1000 (4x250) MW capacity to meet the requirements of Railways.
2. Kanti Bijlee Utpadan Nigam Ltd. 
(06.09.2006)
NTPC-65%
BSEB-35%
To take up and operate Muzaffarpur Thermal Plant (2x110 MW) in Bihar and expansion of the station by 2x195 MW.
Distribution
3. NTPC Electric Supply Co. Ltd.
(21.08.2002)
NTPC-100% Consultancy services and distribution of power.
 
NTPC Board has decided to close down all operations of this company.
Trading
4. NTPC Vidyut Vyapar Nigam Ltd. 
(01.11.2002)
NTPC-100% Trading of power.

Details of Power Generation Click Here

Out of the ten coal blocks allotted to NTPC earlier from Oct. 2004 to July 2013, 5 coal blocks (namely Chatti-Bariatu South, Kerandari, Dulanga, Talaipalli) were cancelled vide Hon'ble Supreme Court's Order dated 24.09.2014. Subsequently, MoC on 24.03.2015 declared reallocation of 4 coal blocks (earlier 5 coal blocks clubbed into 4) namely Chatti-Baratu & Chatti-Bariatu (South), Kerandari, Dulanga, Talaipalli to NTPC. Allotment agreements have been signed between NTPC and Govt. of India for these coal blocks on 30.03.2015.

Govt. of India also issued formal allotment letters to NTPC on 31.03.2015 for Banai & Bhalumuda coal blocks. Kudanali-Luburi coal block has been allotted jointly to NTPC and JKSPDCL. With the allocation of total 8 coal blocks with estimated geological reserves of 3.5 BT, NTPC expects to produce about 82 million Tonnes per annum.

Oil Exploration

NTPC has signed Production Sharing Contracts (PSCs) on 30.06.2010 with Govt. of India for four (4) Oil/Gas exploration blocks awarded under NELP-VIII. These include three offshore blocks (one in Andaman Basin and two in KG Basin) awarded in consortium with ONGC as operator and NTPC having 10% Participating Interest (PI) and one on land block viz. CB-ONN-2009/5 in Cambay Basin, where NTPC has 100% PI and is the Operator. The company along with consortium partners has decided to relinquish 2 (two) blocks one Andaman Basin Block AN-DWN-2009/13 and one KG Basin Block KG-OSN-2009/1 and ONGC (the Operator) has submitted the applications to Directorate General of Hydrocarbons in this regard. Exploration work is in progress in the remaining two blocks.

Two blocks, one Andaman Basin Block AN-DWN-2009/13 and one KG Basin Block KG-OSN-2009/1 have already been relinquished. NTPC has also decided to relinquish the Cambay Basin Block CB-ONN-2009/5  and has submitted the applications to Directorate General of Hydrocarbons in this regard. Exploration work has been completed in the KG Basin Block KG-OSN-2009/4 & the data acquired is under review.

Major Fuel resources

Coal

Total quantity of coal receipt and consumption from during FY 2016-17 and coal stock as on 31/03/2017 for NTPC power operating stations were:

Fig. in MMT

01.04.16 to  31.03.17 As on 31.03.17
Coal receipt Consumption Stock
Domestic Imported Domestic Imported Domestic Imported
159.347 1.025 160.965 1.53 7.509 0.05

Gas/ Liquid Fuel

Natural Gas is primary fuel source for NTPC's existing six gas based stations viz. Anta, Auraiya, Dadri, Faridabad, Kawas and Jhanor-Gandhar. Liquid fuel is used as secondary fuel in above gas based stations except in Jhanor-Gandhar. RGCCPP, Kayamkulam station is run with Naphtha (Liquid Fuel) as primary fuel. Out of Company's total generation of 250.31 billion units, 8.59 billion units [3.43%] were generated through above six Gas and one liquid based station during April 2016 – March 2017.

Average daily quantity of gas supply to NTPC Gas based stations during the period 01.04.2016 to 31.03.2017 was 5.17 MMSCMD.