Engineering assignments are being executed by Engineering Division of Consultancy wing and Engineering Division of NTPC at Engineering office Complex Noida. Engineering division has in-house expertise in working with the state of the art IT and Design Automation Tools, equipping it with world class facilities for complete Power Plant Engineering and related services, and becomes a nodal center for quality in Engineering, introduction of new technologies and uniformity in application of engineering standard to all projects.

Services offered as Owners' Engineer include the following:

  • Feasibility Reports and Details Project Reports
  • Basic Engineering, including Optimization studies on Project systems and Schemes
  • Preparation of Project Design Memorandums, Technical Specification and Tender Document
  • Techno-Commercial Evaluation of offers/ selection of EPC Contractor
  • Post Award and Review Engineering
  • Field Engineering

NTPC's experience as Owners engineer is given below:

Client's Name Name of the projects Services Provided Year
199 THDCIL 2X660 MW TPP, Khurja Preparation of Pre-FR, TOR for EIA and technical specifications for setting up 2x660 MW TPP at Khurja in dist. Bulandshahar 2011
198 SCCL 2X600 MW Singareni TPP Consultancy services to SCCL for Post award consultancy services for 2x600MW TPP at Adilabad. 2011
197 RGPPL Ratnagiri expansion Power Project Consultancy services to RGPPL for preparation of FR & conducting site specific studies for expansion of Ratnagiri Power Project 2011
196 NSPCL Rourkela Coal based Power Project Consultancy services to NSPCL for Preparation of FR for setting up of Coal Based Power Project at Rourkela 2011
195 NSPCL Bokaro expansion Power Project (4X250 MW) Consultancy services to NSPCL for Preparation of FR for Bokaro expansion power project (4x250 MW) 2011
194 BFNESL Manufacturing Plants, Sholapur Consultancy services to BFNESL for providing Engineering Services for developing manufacturing plants at Sholapur. 2010
193 HPCL 800 MW CCPP Consultancy services to HPCL for preparation of Pre-FR & ToR for setting up 800 MW CCPP 2010
192 BSEB 1X250 MW unit, Barauni TPP Consultancy services to BSEB for preparation of DPR for 1X250 MW unit at Barauni TPP, Bihar 2010
191 KBUNL 2X195 MW TPP, Muzaffarpur, Bihar Pre & Post award consultancy services for setting up 2X195 MW expansion project at Muzaffarpur Thermal Power Station. 2010
190 NTPC-BSEB JV 3X660 MW TPP, New Nabinagar, Bihar Consultancy services for Pre and Post-award services to Nabinagar Power Generating Company for setting up 3X660 MW STPP at New Nabinagar, Bihar. 2010
189 PPCL 750 MW CCPP, Bamnauli, Delhi Consultancy for Pre-award services for 750 MW Pragati-II Power Project at Bamnauli 2010
188 Railways 1000 MW TPP, Adra, WB Preparation of Pre-Feasibility report for 1000 MW TPP at Adra, WB 2010
187 Andaman & Nicobar Administration 33 MW Generating Station Preparation of Feasibility report for 33 MW generating system 2009
186 DVC 2 X 660 MW, Raghunathpur-II Preparation of DPR for installation of 2X660 MW units at Raghunathpur Stage-II 2009
185 Singareni Collieries Company Ltd 2 X 600 MW TPP in Dist. Adilabad, AP Pre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's 2009
184 DVC 2 X 660 MW, Raghunathpur-II Consultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II 2009
183 NHDC 2 X 660 MW Reva TPP Consultancy services for preparation of DPR and technical specification for Site specific studies for 1320 MW (2X660 MW) Reva TPP 2009
182 UPRVUNL 1 X 660 MW TPP, Harduaganj Consultancy services to UPRVUNL for DPR of 1X660 MW coal based power plant at Harduaganj Extn-II 2009
181 UPRVUNL 2 X 660 MW Obra 'C' TPP Preparation of technical feasibility report and DPR for 2X660 MW Ext units under Obra "C" TPP 2009
180 DVC 2 X 660 MW,-II Consultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II 2009
179 Singareni Collieries Company Ltd 2 X 600 MW TPP in Dist. Adilabad, AP Pre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's 2009
178 NTPC-Railways JV 4X250 MW Nabinagar TPP Pre & Post award consultancy services for 4X250MW Nabinagar TPP 2008
177 MUNPL 2 X 660 MW TPP at Meja in Allahabad (U.P) Pre & Post award services for setting up of 2X660MW TPP at Meja in Allahabad Distt. (U.P) 2008
176 APCPL (3X500 MW) 1500 MW Thermal Power Plant in Haryana Owner Engineer by PFC Ltd. For the loan agreement Between APCPL and PFC for setting up (3X500 MW) 1500 MW Power Plant in Haryana 2008
175 Green Energy 132/11 KV Substation, Tijara Town. Dubai. UAE Engineering Design Review 2008
174 PPCL 1500 MW (Nominal) Pragati-III, CCPP. Bawana, Delhi Post award services for 1500 MW (Nominal) Pragati-III, CCPP 2008
173 NTECL 3 x 500 MW Vallur power project Design, Engg., contracting, monitoring, QA&I for setting up power plant. For additional 1 X 500 MW 2008
172 APCPL 3X500 MW Tpp, Jhajjar Consultancy services to Aravali Power Company Pvt. Ltd. (JV company- NTPC, HPGCL & IPGCL) for setting up 3X500 MW Power plant in Haryana 2007
171 HPGCL 2X300 MW DCRTPP, Yamuna Nagar Consultancy services to HPGCL for PG test for 2X300 MW DCRTPP, Yamuna Nagar 2007
170 HPGCL 2X210 MW Panipat TPS Consultancy services to M/s HPGCL, Panipat for energy audit of Unit nos. 5&6 (210 MW units) 2007
169 PGCIL Korba STPS Construction of bays at Korba STPS Switchyard for Korba-Brisinghpur-Damoh 400 KV D/C transmission 2007
168 UPRVUNL 2X250 MW Harduaganj Extn. Pre-award services for Harduaganj Extn. Project 2007
167 NTECL 2X500 MW Vallur TPP Pre & Post award Services excluding Site supervision services for 2X500 MW Vallur TPP 2007
166 PPCL 1000 MW Pragati-III CCPP Pre-award services to PPCL for setting up of 1000 MW Pragati-III CCPP 2007
165 UPRVUNL Anpara-D Owners Engineer Services for Anpara-D 2006
164 UPRVUNL 2X250 MW Paricha Extn. Post award consultancy services to UPRVUNL for 2X250 MW Paricha Extn. 2006
163 UPRVUNL 2X250 MW Harduaganj Extn. Post award consultancy services to UPRVUNL for 2X250 MW Harduaganj Extn. 2006
162 IOCL Barauni Refinery Electrical System study at Barauni Refinery 2006
161 SRPCL 58 MW CCPP, Ramanathapuram Consultancy services during pre-commissioning activities for 58 MW CCPP at Ramanathpuram, TN 2006
160 UPRVUNL 2X500 MW & 2X500 MW Obra TPS Extn. Technical feasibility study of 2X500 MW & 2X500 MW Obra TPS Extension. 2006
159 DVC 2X500 MW Koderma TPP Engineering consultancy for 2X500 MW Koderma TPP under 11th Plan 2006
158 APGENCO KTPS(ABC), KTPS Stage-V & RTS-B stations CS for carrying out Auxiliary consumption audit in the units of KTPS (ABC), KTPS Stage-V & RTS-B stations of GENCO 2006
157 SSNNL SBC pumping Scheme Selection of O&M contractor for SBC pumping scheme. 2006
156 APGCL 235 MW CCPP, Namrup DPR for 235 MW CCPP at Namrup 2006
155 GIPCL 2X1000 MW new project in south Gujarat near Surat Evaluation of RFQ bis, preparation of RFP documents and evaluation of bids for selection of JV partners 2005
154 DJB 40 MW Captive Gas Power Plant Preparation of FR for 40 MW CGPP at Sonia Vihar. 2005
153 PGCIL Auraiya Gas Power Project Deposit work for execution of 400 KV bays extension at Auraiya GPS Switchyard 2005
152 SSNNL Kachchh Branch Canal Pre & Post award engineering for pumping plants on Kachchh Branch Canal 2005
151 GIPCL 2X1000 MW PP Review of Information memorandum for selection of JV partners for proposed 2X1000 MW PP. 2005
150 PPCL 330 MW Pragati CCPP, Extn. Preparation of EIA studies for Pragati Phase-I 2005
149 IOCL Haldia Refinery Detail study for 2nd Gas turbine hook-up at Haldia Refinery of IOCL 2005
148 CSEB 2X660 MW Surguja TPS DPR for 2X660 MW Coal based TPS, Distt. Surguja 2005
147 DVC 210 MW Durgapur TPS, U-4 Condenser Leak Detection Test with Helium Gas for DTPS U-4 (210 MW) 2005
146 PPCL 330 MW Pragati CCPP Preparation of FR for Pragati CCPP Ph-II-330 MW 2005
145 IPGCL Rajghat TPS Installation of effluent treatment plant for Rajghat TPS. 2004
144 APGENCO Rayalseema TPS Auxiliary power consumption audit at Rayalseema TPS 2004
143 UPRVUNL 500 MW Anpara C TPS Selection of developer & providing technical services for preparation of RFP document, bid evaluation, award recommendations. 2004
142 CSEB 2X250 MW Korba (W) TPS Preparation of tender document for 2X250 MW to 2X300 MW Korba (W) TPS 2004
141 CSEB 2X250 MW Korba (W) TPS Preparation of revised comprehensive EIA report for Korba (W) TPS 2004
140 DVC 2X250 MW Mejia TPS Extn. Determining the project cost for 2X250 MW Mejia TPS Extn. 2004
139 IOCL Haldia Refinery Electrical system study at Haldia Refinery of IOCL 2004
138 APGPCL 272 MW Vijjeswaram CCPP Selection of O&M Contractor for 272 MW Vijjeswaram CCPP 2004
137 PPCL 300 MW Pragati CCPP Extn. Preparation of Pre-FR for proposed PP on ash bund area on Ring road 2004
136 PGCIL Sipat TPP Deposit work for 400 KV bays at Sipat STPP Switchyard 2004
135 PGCIL NCPS, Dadri Deposit work for construction of 400 KV Switch yard line bay extension at NCPS, Dadri 2003
134 GPCL Ghogha Lignite PP Selection of JV partner for Ghogha Lignite PP
133 Essar Power Ltd. 515 MW Essar CCPP Auditing of electrical system at 515 MW CCPP of Essar Power Ltd. 2003
132 IPGCL IP Station & Rajghat TPS Evln. of tech. & commercial bid for Ash dyke for IP Stn. & Rajghat TPS. 2003
131 UPRVNL 2 x 500 MW Anpara TPP Prep. of tender doc. for 2 x 500 MW Anpara TPP 2003
131 UPRVNL 2 x 500 MW Anpara TPP Prep. of tender doc. for 2 x 500 MW Anpara TPP 2003
130 UPRVNL Harduaganj TPS Prep. of technical FR for Harduaganj TPS 2003
129 MSEB Koradi TPS Raising of Ash bund & spillway from TBL 325 M to 328 M for Koradi TPS 2003
128 PPCL 330 MW CCPP Prep. of FR & EIA report 2003
127 GPCL 500 MW TPP in Chhattisgarh Selection of JV partner for developing 500 MW TPPin Chhattisagrh 2003
126 APGENCO 542 MW Vemagiri CCPP. Updation of Pre-FR for Vemagiri CCPP. 2003
125 IPPGCO. 2 x 67.5 MW Rajghat TPS Ash pond mgmt. For IP Stn. & Rajghat TPS. 2003
124 CSEB 2 x 250 MW Korba East TPS. Evaluation of EPC bid & prep. of DPR for 2 x 250 MW Korba East TPS. 2002
123 CSEB 2 x 250 MW Korba West TPS. Up stream slope protection of earthen bund at Korba West TPS. 2002
122 CSEB 2 x 250 MW Korba East TPS. Modification of earthing arrangement in 6.6.kV auxiliary supply at Korba(East)TPS 2002
121 CSEB 2 x 250 MW Korba East & West TPS. Augmentation of fly ash collection system and ash water re-circulation for Korba East & West. 2002
120 CSEB 2 x 270 MW Korba West TPS Review of FR,Prep. of DPR,Prep. of tender doc. For EPC contract,pre-of pre-qualification criteria and prep. of NIT and WIA report. 2002
119 CSEB 2 x 250 MW Korba East TPS. Review of FR,Prep. of DPR,Prep. of tender doc. For EPC contract, pre-of pre-qualification criteria and prep. of NIT and WIA report. 2002
118 DVB 2 x 67.5 MW Rajghat TPS Replacement of DAS at 2 x 67.5 MW Rajghat TPS. 2002
117 J&K Power development Corp. 1000 MW PP in J&K State. Prep. of Pre-FR for setting up 1000 MW Power project in J&K state. 2002
116 SSNNL Saurashtra Branch Canal Scrutiny of detailed engg., structural design for the work of SBC pumping scheme. 2001
115 NALCO 2 x 120 MW CPP Prep. of detailed FR for Ash collection and disposal system for two existing units of 120 MW each. 2001
114 DVB 1000 MW Bawana Power project Selection of JV partner for 1000 MW PP at Bawana. 2001
113 Konaseema Oakwell EPS 441 MW Konaseema CCPP Owner's Engineer Services including site supervision 2001
112 NDMC Sub-stations CS for establishing 33 kV & 66 kV sub station 2001
111 Gujarat Mineral Development Corporation 2x125 MW Akrimota Lignite based Power Plant Supervision of construction/erection & FQA services for 2 x 125 MW Lignite based power plant at Akrimota 2001
110 DVB IP station CS for comprehensive study 2000
109 NALCO Nalco captive Power Plant CS for updating the cost of 8th unit 2000
108 Rural Electricity Corporation Construction of office building CS for review of estimate 2000
107 Railways board 500 MW Coal based plant Feasibility report for setting up a coal based TPS 2000
106 Admn. of Andaman & Nicobar islands 5 MW Andaman DGPP Feasibility report 2000
105 Power Grid Corporation Of India Ltd. (SR) PGCIL Township at Kayamkulam CCPP Deposit work for construction of dwelling units Kayamkulam 1999
104 Delhi Vidyut Board. 300 MW Combined Cycle Power Project. Owner's Engineer Services. 1999
103 NDMC Sub-stations of NDMC Consultancy services for earthing system 1999
102 MSEB Koradi Thermal Power Station CS for raising ash dyke 1999
101 NALCO 30 MW Black start up power Feasibility report preparation 1999
100 APGENCO 650-700 MW gas based CCPP at Vemagiri Pre-feasibility report for the proposed station 1999
99 DVB IP station Technical feasibility for water treatment plant. 1999
98 National Aluminium Company. Nalco captive power plant. Review of issues relating to setting up of 8th Unit. 1999
97 Union Territory of Chandigarh. 100 MW CCPP at Chandigarh. Feasibility Report & EIA study. 1999
96 North Eastern Electric Power Corpn. 4 X 21MW Agartala Gas Turbine Project. Consultancy services for review of tenders for Water Treatment System. 1999
95 Usha Martin Industries Ltd. 1 X25 MW Captive Power Project plant at Jamshedpur. Consultancy Services for development for Ash Mound. 1999
94 Andhra Pradesh Power Generation Corporation Ltd. 2X210 MW coal based Rayalaseema thermal power project. Technical evaluation of bids received from EPC Contracts. 1999
93 Surat Municipal Corporation Ltd. 60 MW captive power plant. Preparation of feasibility Report. 1999
92 Power Grid Corporation Of India Ltd. (NR) 220kV switchyard at Faridabad Gas Based CCPP Deposit work for switchyard erection 1998
91 Tamil Nadu Electricity Board. 500MW Thermal Power Plant at Tuticorin. Preparation of Feasibility Report and EIA study. 1998
90 Punjab State Electricity Board 120 MW Naphtha based power plant. Updating the cost estimate for DPR. 1998
89 Bharat Aluminium Co. Ltd. Captive power plant at Korba. Feasibility report for 2X67.5 MW extension. 1998
88 ONGC-NTPC joint venture. 400 MW Gas based power project at Hazira. Feasibility report & EIA study. 1998
87 Delhi Vidyut Board. 300 MW Pragati CCPP. EAI study. 1998
86 Larsen & Toubro. 2x287 MW TPP at Bhilai. Review of engineering for 275 Mtr. high chimney. 1998
85 National Aluminium Company. Captive power plant at Angul. Examining need for setting up 8th unit. 1998
84 Kerala State Electricity Board. 128 MW Diesel PP at Kozhikode. Finalization of Contract, Detailed Engg., Inspection Services, Construction, Supervision. 1997
83 West Bengal Power Development Corporation Ltd. 2X210 MW TPP at Bakreswar Project management, QA& Inspection, FQA Services. 1997
82 Delhi Vidyut Board. 300 MW Pragati CCPP. Feasibility Report. 1997
81 Delhi Vidyut Board. 300 MW Indraprastha CCPP Technical feasibility. 1997
80 Tamil Nadu Industrial Captive Power Company Ltd. 2X250 MW Thermal Power Project at Srimushnam. Preparation of PDMs, technical specifications for Main Plant, engineering for Chimney and finalization of quality plans. 1997
79 National Buildings Construction Corporation Ltd. 2X210 MW Thermal Power Project at Bakreswar Design of Chimney. 1997
78 Sargent & Lundy, USA. Rain Calcining Unit, Vishakhapatnam. Deputation of NTPC experts for site construction supervision. 1996
77 Sardar Sarovar Narmada Nigam Ltd. Saurashtra Branch Canal. Model studies for pumping system. 1996
76 Sumitomo Corporation. Gas based CCPP at Vijjeswaram. Checking of Stack design. 1996
75 Siasin Energy Private Ltd. Vypeen Power Project. Pre Award Owner's Engineer Services. 1996
74 Tamil Nadu Electricity Board NMTPP- Simulator Evaluation of Bids for Thermal Training Simulator 1995
73 West Bengal, Power Proposed Power Project in Rajasthan Assistance in preparation of Bid 1995
72 Videocon International Ltd. 2X525 MW North Madras Thermal Power Project- II. EIA study, Detailed Engg, Quality Assurance & inspection etc. 1995
71 Jindal Power Ltd. Raigarh-2X250 MW, Thermal Power Project. Feasibility Report, Engg. DPR, Review Engg., QA & Inspection, site Supervision. 1995
70 Sargent & Lundy, USA. Rain Calcining Unit, Vizag. Dispersion Modelling Studies. 1995
69 Sardar Sarovar Narmada Nigam Ltd. Saurashtra Branch Canal. Basic engineering for Concrete Volute Casing Pumps. 1995
68 Westmont Engineering, Malaysia. Gas based Power Plant in Orissa. Preparation of DPR for Barge Mounted Power Plant. 1995
67 National Development Corpn., Tanzania. Mchuchuma Mining-cum-Power Project. Preparation of Feasibility Report. 1995
66 Punjab State Electricity Board. 200 MW Thermal Project. Preparation of Feasibility Report. 1995
65 Saudi Cable Marketing Co. Transmission System enhancement in Saudi Arabia. Seminar on High Voltage Transmission System. 1995
64 National Building Construction Corpn. Ltd. Bhatinda TPS (2X210 MW) of PSEB. Design of Chimney. 1995
63 Surat Electricity Co. -- Pre- Feasibility Report for Thermal Project. 1995
62 Dubai Electricity & Water Authority. Awir, Hatta & Mushrif Substation. Turnkey Construction of 2 nos. 132kV substation & modification of one substation. 1994
61 Spectrum Power Generation Ltd. 206 MW Kakinada Gas Based Combined Cycle Power Plant, Andhra Pradesh. Engineering, QA & Inspection, Contract & Procurement, Project Management, Site Supervision, Pre-commissioning services. 1994
60 Videocon Intl. Ltd 500 MW north Madras Thermal Power Stage II Preparation of Feasibility report 1994
59 Videocon Intl. Ltd. 500 MW North Madras Thermal Power Stage- II Preparation of Functional Specification 1994
58 Karnataka Electric Board. 1000 MW Thermal Power Project. Review of FR by Cogentrix, USA. 1994
57 Indian Oil Corpn. Captive Power Plant at Mathura Refinery. Preparation of Feasibility Report. 1994
56 Asea Brown Boveri Ltd. 230 MW Gas Based CCPP at Jegurupadu for GVK Industries. Design & Engineering Consultancy Services for CW System. 1994
55 Oman Oil Company. Proposed Gas Based Power Project. Preparation of Pre- Feasibility Report. 1994
54 India Dye Stuff Industries. Private Sector Power Projects Madhya Pradesh. Technical Services for Private Sector Power Project in Madhya Pradesh. 1994
53 West Bengal State Electricity Board. Santaldih Thermal Power Station. Consultancy Services for Ventilation System of TG Building. 1994
52 Damodar Valley Corpn. Bokaro 'B' Thermal Power Station Consultancy Services for Ash Handling & Disposal. 1994
51 Bharat Aluminum Co. Ltd. TL Link from Korba Super Thermal Power Project. Study of transmission Link between Korba STPP and Balco Captive Power Project. 1994
50 Nepal Electricity Authority. Seventh Power Project (ADB Assisted). Execution of twenty-one nos. 132, 66 and 33kV substations on turnkey basis. 1993
49 Gas Authority of India Ltd. 220kV line terminal bays at Auraiya Gas base power plant. Engineering and construction of line bays. 1993
48 Gujarat Electricity Board. 220kV line terminal bays at Kawas Gas Based Power Plant. Engineering and construction of two additional line bays. 1993
47 Madhya Pradesh Electricity Board. 220kV line terminal bays at Auraiya Gas Based Power Plant. Engineering and construction of two additional line bays. 1993
46 India Oil Corpn. Ltd. 3X25 MW Panipat Captive Thermal Power Station. Preparation of feasibility report, design, engineering, QA& Inspection, procurement, project management & site supvsn. 1993
45 Usha Rectifier Corpn. Ltd. Redi & Jagdishpur Power Station. Preparation of feasibility Report for Power Station at Redi, Maharastra & Jagdishpur, U.P. 1993
44 Neyveli Lignite Corpn. Ltd. Thermal Power Station-I. Automatic Fire Sprinkler System for Cable Gallery. 1993
43 Govt. of Orissa Durgapur Thermal Power Station. Preparation of feasibility report & field investigation. 1993
42 Govt. OF Orissa Gopalpur Thermal Power Station. Preparation of feasibility report & field investigation. 1993
41 ACC Babcock Ltd Budge Budge TPP of CESC LTD. Design, Engineering, Procurement and Inspection services for boiler, Control & Instrumentation. 1993
40 Bombay Suburban Electric Supply Ltd. Substation Townships. Architectural & Civil design of staff quarters at substation sites. 1993
39 West Bengal state Electricity Board 132 KV Transmission Line. Review of tower design and revised river crossing proposal. 1993
38 Govt. of Orissa Naraj Thermal Power station. Preparation of Feasibility Report & field investigation. 1993
37 EPDCI, Japan Kathalguri Gas Power Project. Engineering services for intake well, raw water piping and bridge. 1993
36 Madhya Pradesh Electricity Board Gwalior Gas Project. Preparation of detailed feasibility report. 1993
35 Bharat Heavy Electrical Ltd. 2X210 MW Kerman Power Station, Iran Design and engineering of steel lined multi-flue Chimney. 1993
34 Sunflag Industries Waste heat recovery in steel plant. Assessment of thermal potential of exhaust gas & char of the kiln and optimal solution for waste heat recovery. 1993
33 Assam state Electricity Board Amguri Gas Power Project. Establishment of gas linkage and pre-feasibility study. 1993
32 North Eastern Electric Power Corporation Kathalguri combined Cycle Power Project (6X30+3X30 MW). Preparation of amended detailed project reports. 1992
31 Balarpur Industries Ltd. Manah Gas project, Oman Pre-tender Services 1992
30 Damodar Valley Corpn. (3x200 MW) Mejia Thermal Power Project. Basic design and detailed engineering including const. drgs. for 220m high Chimney. 1992
29 North Eastern Electric Power Corporation. Kathalguri Combined Cycle Power Project (6X30+3X30 MW). Complete design & detailed engineering for civil works of the project. 1992
28 Bombay Suburban Electric Supply Ltd. 2X250 MW Dahanu Thermal Plant (Generating station). Preparation of Specn., detailed design & engineering, technical evaluation of tenders, QA & Inspection of line materials. 1992
27 Dubai Electricity & Water Authority. 400 & 132kV transmission line construction. Turnkey supply and installation/constn. of 400kV & 132 kV Transmission line and up-gradation of existing 132kV line to 400kv. 1991
26 Orissa State Electricity Board Talcher Thermal Power Station. Design and engineering of Ash pond and recycle of water. 1991
25 Bombay Suburban Electric Supply Ltd. Dahanu 2X250 MW Thermal Power Station (Transmission Lines.). Review of design and drgs. of 220 KV transmission line towers and tower foundations. 1991
24 Birla GTM/E Technical Services Ltd. Andhra Pradesh State Electricity Board. Pre- tender transmission line tower and foundation design. 1991
23 J.K. Organisation Energy sector studies. Techo- commercial comparison of thermal power project using different fuel mix and recommendation for setting up Power Plant. 1991
22 Karnataka Power Corporation Ltd. Raichur Substation. System Studies to assess quantum of reactive compensation and fault studies. 1991
21 Karnataka Electricity Board. Transmission System. Engineering, Procurement, Project Management & construction of 400kV line loop-in loop-out. 1990
20 Maharastra State Electricity Board. Chandrapur Phadge HVDC transmission system. Basic and detailed engineering, tender evaluation, QA & Inspection, site supervision. 1990
19 Steel Authority of India Ltd., Bhilai 60MW Gas Based Captive CCPP. Preparation of Feasibility Report 1990
18 Orissa Power Generation Corporation. Ib Thermal Power Station. CW System Studies 1990
17 GVK Industries Pvt. Ltd. 400MW Gas Based Power Project in Godavari Basin. Preparation of Feasibility Report 1990
16 Delhi Vidyut Board. 220kV Mandaula Substation. Design, engineering, procurement and execution on turnkey basis. 1989
15 Delhi Electric Supply Undertaking. 400 KV double Circuit Transmission Line & 400/ 220KV substations. Design, engineering, procurement, QA & Inspection and assistance in site construction. 1989
14 Eastern Coal Fields Ltd. Farakka- Lalmatia 220KV Transmission Line & 220/132KV Substation. Design, Construction, operation & Maintenance. 1989
13 Bombay Suburban Electric Supply Ltd. 2X250MW Dahanu Thermal Power Station. Basic engineering, spenc. preparation for main packages detailed engineering for chimney and QA for main plant. 1989
12 TATA Exports Transmission Lines project of EGAT, Thailand Design of 230 KV Transmission Towers including line diagrams, all types of standard RCC foundation design. 1989
11 Bombay Suburban Electric supply Ltd. 2x 250 MW Dahanu Thermal Power Station (Transmission Lines) System studies, design preparation of specn. for part 220 KV transmission lines and substation material/ services 1989
10 Madras Refineries Ltd. Study of Captive Power Station (20MW), Boiler & TG Auxiliaries Examination of present Captive Power Plant to determine likely availability on assured basis in future. 1989
9 National Project Construction Corporation. Kathalguri-Mariani 400KV Towers Double circuit line of NEEPCO Tower Design for 400 KV Tower. 1989
8 Delhi Vidyut Board Indraprastha Thermal Power Station. Preparation of Feasibility Report for closed circuit CW System. 1987
7 Coal India Ltd. Captive Gas Turbine Plant. Preparation of specification. 1987
6 ASEA, Sweden Hydro Quebec-New England, multi terminals HVDC project. System studies & Engineering. 1987
5 Delhi Vidyut Board Rajghat Thermal Power Station (2X67.5 MW) Engineering Review 1987
4 Bridge & Roof Company Neyveli Lignite Thermal Power Station Stage -II (4X210 MW) Pre-Tender design for Chimney 1986
3 Bharat Aluminium Co. 4X67.5 MW Captive TPS at Korba & associated 220KV transmission system. Design, Construction, Commissioning and Project Management. 1984
2 Neyveli Lignite Corporation. 400 KV Transmission System including two 400 KV Substation. Design, Construction, Commissioning and Project Management. 1984
1 Bharat Heavy Electrical Ltd. Vishakhapatnam Steel Plant Captive Thermal Power station Multi-flue Chimney Design 1983