Construction Management, Erection And Commissioning

Construction Management system of NTPC integrate co-ordination and dovetailing of inputs & resources, towards the prime objectives of completing the project on schedule, controlling cost and quality.

Services covered under Construction Management, Erection & Commissioning include the following:

  • Resources Identification and Acquisition 
  • Formulating responsive project Organization structure 
  • Review of Construction schedules 
  • Supervision during Civil Construction and Equipment Erection 
  • Conducting Construction Quality Audit, monitoring and corrective actions 
  • Identification and removal of bottlenecks 
  • Monitoring overall construction schedule and independent assessment 
  • Pre-commissioning and commissioning procedures and support
  • Review of PG test procedure & witnessing
  • Review of OEM-O&M manuals

NTPC's Experience in Construction Management, Erection and Commissioning as Consultant:

Sl.No.Client's NameName of the projectsServices ProvidedYear
47HPGCL2 X 600 MW Rajiv Gandhi Thermal Power Project at HissarConstruction supervision and FQA services2008
46Alghamin International trading Co., KuwaitAz Zour EPP 08 PP in KuwaitDeputation of experts for assisting in erection, testing and commissioning.2007
45RVUNLDholpur TPPDeputation of operating engineer at site.2007
44GSECL112.45 MW DhuvaranWitnessing and certifying performance guarantee test2007
43UPLMathura RefineryTo carry out analysis of field data and recommendation for RLA of Boiler 2 & 32007
42NASLPatratu TPSReview of engg. documents2007
41UPRVUNL5 x 200 MW Obra "B" TPSSupervision of refurbishment works, re-commissioning, PG test and post award contract administration.2007
40UPRVUNL2 x500 Anpara-D TPSOwner engineer services.2006
39UPRVUNL2 x 250 MW Parichha ExtnPost award consultancy services.2006
38UPRVUNL2 x 250 MW Harduaganj Extn.Post award consultancy services.2006
37Sai Regency Power Corp. Ltd.58 MW CCPP at RamanathapuramCommissioning support by deploying experts.2006
36REC Interior works in the office of REC at Delhi, Panchkula, Jaipur and Lucknow2006
35PGCILKorba STPS.Const. of control room building at Korba STPS Sw. yrd of NTPC.2006
34DVC2 x 250 MW Extn. U-5&6 of Mejia and U-7&8 of Chandrapura TPS.Supply & installation of Primavera Proj. Mgmt.2005
33PGCILTalcher-Kaniha STPPConstruction of residential qtrs. For PGCIL at Talcher-Kaniha STPP.2005
32DVC2 x 250 MW Chandrapura TPSProj.Mgmt., Const. Mgmt. & FQA for 2 x 250 MW Chandrapura TPS extn., U-7&8.2005
31DVC2 x 250 MW Mejia TPSProj.Mgmt., Const. Mgmt. & FQA for 2 x 250 MW Mejia TPS extn., U-5&6.2005
30PGCILAuraiya Gas power projectDeposit work for execution of 400kV bay extension at AuGPP GPS Switchyard.2005
29DPL300 MW Durgapur TPS,U-7Const. mgmt.,FQA for Durgapur Project power station extn. Unit-7 (300 MW)2004
28WBPDCL1 x 250 MW Santaldih TPS.Proj.Mgmt.,Const.mgmt. & FQA for 1 x 250 MW Santaldih TPS.2004
27WBPDCL2 x 300 MW Sagardighi TPSProj.Mgmt., Const.mgmt. & FQA for 2 x 300 MW Sagardighi TPS.2004
26PGCILSipat TPPDeposit work for 400kV bays at Sipat STPP Switchyard.2004
25PGCILNCPS,DadriDeposit work for const. of 400kV Sw. yrd line bay extension at NCPS,Dadri2003
24Konaseema445 Konaseema CCPPOwners engineer services for 445 MW CCPP at Konaseema A.P.2001
23Konaseema Oakwell EPS441 MW Konaseema CCPPOwner??s Engineer Services including site supervision2001
22Gujarat Mineral Development Corporation2x125 MW Akrimota Lignite based Power PlantSupervision during construction & erection, Project Management2001
21Power Grid Corporation Of India Ltd. (SR)PGCIL Township at Kayamkulam CCPPDeposit work for construction of dwelling units Kayamkulam1999
20Delhi Vidyut Board.330 MW Combined Cycle Power Project.Owner's Engineer Services.1999
19Power Grid Corporation Of India Ltd. (NR)220kV switchyard at Faridabad Gas Based CCPPDeposit work for switchyard erection1998
18Kerala State Electricity Board.128 MW Diesel PP at Kozhikode.Finalization of Contract, Detailed Engg., Inspection Services, Construction, Supervision.1997
17West Bengal Power Development Corporation Ltd.2X210 MW TPP at BakreswarProject management, QA& Inspection, FQA Services.1997
16Sargent & Lundy, USA.Rain Calcining Unit, Vishakhapatnam.Deputation of NTPC experts for site construction supervision.1996
15Dubai Electricity & Water Authority.Awir, Hatta & Mushrif Substation.Turnkey Construction of 2 nos. 132kV substation & modification of one substation.1994
14Spectrum Power Generation Ltd.206 MW Kakinada Gas Based Combined Cycle Power Plant, Andhra Pradesh.Engineering, QA & Inspection, Contract & Procurement, Project Management, Site Supervision, Pre-commissioning services.1994
13Nepal Electricity Authority.Seventh Power Project (ADB Assisted).Execution of twenty-one nos. 132, 66 and 33kV substations on turnkey basis.1993
12Gas Authority of India Ltd.220kV line terminal bays at Auraiya Gas base power plant.Engineering and construction of line bays.1993
11Gujarat Electricity Board.220kV line terminal bays at Kawas Gas Based Power Plant.Engineering and construction of two additional line bays.1993
10Madhya Pradesh Electricity Board.220kV line terminal bays at Auraiya Gas Base Power Plant.Engineering and construction of two additional line bays.1993
9India Oil Corpn. Ltd.3X25 MW Panipat Captive Thermal Power Station.Preparation of feasibility report, design, engineering, QA& Inspection, procurement, project management & site supvsn.1993
8Dubai Electricity & Water Authority.400 & 132kV transmission line construction.Turnkey supply and installation/constn. of 400kV & 132 kV Transmission line and up-gradation of existing 132kV line to 400kv.1991
7Karnataka Electricity Board.Transmission System.Engineering, Procurement, Project Management & construction of 400kV line loop-in loop-out.1990
6Maharastra State Electricity Board.Chandrapur Phadge HVDC transmission system.Basic and detailed engineering, tender evaluation, QA & Inspection, site supervision.1990
5Delhi Vidyut Board.220kV Mandaula Substation.Design, engineering, procurement and execution on turnkey basis.1989
4Delhi Electric Supply Undertaking.400 KV double Circuit Transmission Line & 400/ 220KV substations.Design, engineering, procurement, QA & Inspection and assistance in site construction.1989
3Eastern Coal Fields Ltd.Farakka- Lalmatia 220KV Transmission Line & 220/132KV Substation.Design, Construction, operation & Maintenance.1989
2Bharat Aluminium Co.4X67.5 MW Captive TPS at Korba & associated 220KV transmission system.Design, Construction, Commissioning and Project Management.1984
1Neyveli Lignite Corporation.400 KV Transmission System including two 400 KV Substation.Design, Construction, Commissioning and Project Management.1984