Environmental Engineering And Management

Environmental Engineering And Management

NTPC has deployed a comprehensive institutional structure for environmental functions, which is supported by Center for Power Efficiency and Environmental Protection (CENPEEP) and Environment Management & Ash utilization group.

Services covered under Environmental Engineering and Management include the following:

  • Environment Impact Assessment (EIA) studies
  • Environment Management Plans and Monitoring
  • Retrofitting Environment Friendly systems
  • Ash Handling and utilization, including development of ash-dyke/ ash-mound

Experience in Environmental Engineering and Management includes the following:

Sl.No.Client's NameName of the projectsServices ProvidedYear
27Energy Trading Group FZC, UAE60-80 MW Diseal Engine Power Plant, KenyaPreparation of Feasibility Report (FR) for 60-80 MW Diesel Engine Power Plant at Athi River, Kenya2009
26Royal Govt. of Bhutan620 MW Amochhu Reservoir HEPP, BhutanPreparation of DPR for 620 MW Amochhu Reservoir HEPP in Bhutan2009
25NHDC1000 MW TPP near Khandwa, MPPreparation of Pre-Feasibility report & ToR for EIA study for 1000 MW TPP near Khandwa, MP2009
24UPRVUNL2 X 660 MW Obra 'C' TPPPreparation of technical feasibility report and DPR for 2X660 MW Ext units under Obra "C" TPP2009
23UPRVUNL1 X 660 MW TPP, HarduaganjConsultancy services to UPRVUNL for DPR of 1X660 MW coal based power plant at Harduaganj Extn-II2009
22NHDC2 X 660 MW Reva TPPConsultancy services for preparation of DPR and technical specification for Site specific studies for 1320 MW (2X660 MW) Reva TPP2009
21DVC2 X 660 MW, Raghunathpur-IIPreparation of DPR for installation of 2X660 MW units at Raghunathpur Stage-II2009
20Andaman & Nicobar Administration33 MW Generating StationPreparation of Feasibility report for 33 MW generating system2009
19Puducherry PCL250 MW Plant at YanamEIA Studies for 250 MW at Yanam.2009
18PPCLBamnauli 750 MW CCPPPreparation of FR &EIA study for Bamnauli 750 MW CCPP2008
17KBUNLMuzaffarpur Thermal Power StationRevalidation of FR.2008
16Pudducherry PCL250 MW CCPP at YanamPreparation of Pre-FR.2008
15Haryana Power Gen. Corp. Ltd.3 x 350 MW Faridabad GBCCPP.Prep. of Pre-FR.2007
14Pragati Power Corp. Ltd.750 MW Bamnauli Gas based PP.Prep. of Pre-FR and terms of reference for EIA studies and other activities2007
13Delhi Jal Board40 MW Captive Gas Power PlantPrep. of FR for 40 MW CGPP at Sonia Vihar.2005
12PPCL330 MW Pragati CCPP,Ph-IIPrep. of FR & EIA report2005
11CSEBKorba (West)TPSPrep. of revised comprehensive EIA report for K(W)TPS.2004
10PPCL330 MW Pragati CCPP,Ph-IPrep. of FR & EIA report2003
9CSEB2 X 270 MWKorba(West) TPSReview of FR,Prep. of DFR,Prep. of tender documents for finalization of EPC contract, pre-of pre-qualification criteria and draft tender notification and Prep. of EIA report for Korba(West)TP2002
8CSEB2 x 250 MW Korba (East)TPSReview of FR,Prep. of DFR,Prep. of tender documents for finalization of EPC contract, pre-of pre-qualification criteria and draft tender notification and Prep. of EIA report.2002
7Union Territory of Chandigarh.100 MW CCPP at Chandigarh.Feasibility Report & EIA study.1999
6Tamil Nadu Electricity Board.500MW Thermal Power Plant at Tuticorin.Preparation of Feasibility Report and EIA study.1998
5ONGC-NTPC joint venture.400 MW Gas based power project at Hazira.Feasibility report & EIA study.1998
4Delhi Vidyut Board.300 MW Pragati CCPP.EAI study.1998
3Videocon International Ltd.2X525 MW North Madras Thermal Power Project- II.EIA study, Detailed Engg, Quality Assurance & inspection etc.1995
2Sargent & Lundy Engineers, USA.Lapanga Project, Orissa.Environmental Impact Assessment Studies.1994
1Orissa State Electricity BoardTalcher Thermal Power Station.Design and engineering of Ash pond and recycle of water.1991