| अप्रैल 17, 2026 |
Declaration of COD of capacity of 150 MW Solar out of the total installed capacity of 300 MW Solar Project located in Rajasthan, by a group company of NGEL. |
View/Download |
| अप्रैल 17, 2026 |
Declaration of COD of capacity of 87.50 MW Solar out of the total installed capacity of 150 MW Solar Project located in Rajasthan, by a group company of NGEL. |
View/Download |
| अप्रैल 16, 2026 |
Completion of tenure of Shri Anil Kumar Trigunayat as Independent Director w.e.f. 15th April 2026. |
View/Download |
| अप्रैल 11, 2026 |
Declaration of COD of 4th Unit (250) MW of Tehri PSP (4X250 MW) of THDC India Limited. |
View/Download |
| अप्रैल 10, 2026 |
Intimation of ESG rating by CARE ESG Ratings Limited. |
View/Download |
| अप्रैल 08, 2026 |
Press release titled “NTPC Signs Non-Binding MoU with Électricité de France (EDF) for Cooperation in Nuclear Power. |
View/Download |
| अप्रैल 08, 2026 |
Uprating of Dadri Thermal Power Station Unit no. 5 and 6 (from 2×490 MW to 2×500 MW) of NTPC Limited. |
View/Download |
| अप्रैल 07, 2026 |
Pursuant to SEBI Circular No. HO/38/13/11(2)2026-MIRSD-POD/ I/3750/2026 dated 30th January 2026, please find attached copies of Newspaper clippings containing the notice published by the Company dated 7th April 2026. |
View/Download |
| अप्रैल 01, 2026 |
Declaration of COD of Ayana Renewable Power Four Private Limited, a group company of NGEL, as detailed below:
1.The fourth part capacity of 37.5 MW Solar out of the total installed capacity of 150 MW Solar Project located in Gujarat, w.e.f. 2nd April 2026.
2.The seventh part capacity of 13.2 MW Wind out of the total installed capacity of 92.4 MW (Wind) and 37.5 MW (Solar) as part of 100 MW Hybrid Project located in Gujarat, w.e.f. 2nd April 2026. |
View/Download |
| अप्रैल 01, 2026 |
Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. |
View/Download |
| अप्रैल 01, 2026 |
Revised Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. |
View/Download |
| अप्रैल 01, 2026 |
The total installed capacity of NTPC group stands at 89,108 MW and commercial capacity at 88,028 MW.. |
View/Download |