NTPC Group total installed capacity reaches 65,810 MW
New Delhi, April 5, 2021: With successful completion of trial operation by Unit-2 of 660 MW capacity of Tanda Super Thermal Power Station in Uttar Pradesh (U.P) Stage-II (2 x 660 MW), the NTPC installed capacity has risen to 65,810 MW