Engineering assignments are being executed by the Engineering Division of the consultancy wing and the Engineering Division of NTPC at the Engineering office Complex in NOIDA. The engineering division has in-house expertise in working with the state of the art IT and Design Automation Tools, equipping it with world class facilities for complete power plant engineering and related services, and becomes a nodal center for quality in engineering, introduction of new technologies and uniformity in application of engineering standards to all projects.
Services offered as Owners' Engineers include the following:
- Feasibility reports and detailed project reports
- Basic engineering including optimisation studies on project systems and schemes
- Preparation of project design memorandums, technical specifications and tender documents
- Techno-Commercial evaluation of offers/ selection of EPC Contractor
- Post award and review engineering
- Field engineering
NTPC's experience as Owners engineer is given below:
Sl.No. | Client's Name | Name of the projects | Services Provided | Year |
---|---|---|---|---|
199 | THDCIL | 2X660 MW TPP, Khurja | Preparation of Pre-FR, TOR for EIA and technical specifications for setting up 2x660 MW TPP at Khurja in dist. Bulandshahar | 2011 |
198 | SCCL | 2X600 MW Singareni TPP | Consultancy services to SCCL for Post award consultancy services for 2x600MW TPP at Adilabad. | 2011 |
197 | RGPPL | Ratnagiri expansion Power Project | Consultancy services to RGPPL for preparation of FR & conducting site specific studies for expansion of Ratnagiri Power Project | 2011 |
196 | NSPCL | Rourkela Coal based Power Project | Consultancy services to NSPCL for Preparation of FR for setting up of Coal Based Power Project at Rourkela | 2011 |
195 | NSPCL | Bokaro expansion Power Project (4X250 MW) | Consultancy services to NSPCL for Preparation of FR for Bokaro expansion power project (4x250 MW) | 2011 |
194 | BFNESL | Manufacturing Plants, Sholapur | Consultancy services to BFNESL for providing Engineering Services for developing manufacturing plants at Sholapur. | 2010 |
193 | HPCL | 800 MW CCPP | Consultancy services to HPCL for preparation of Pre-FR & ToR for setting up 800 MW CCPP | 2010 |
192 | BSEB | 1X250 MW unit, Barauni TPP | Consultancy services to BSEB for preparation of DPR for 1X250 MW unit at Barauni TPP, Bihar | 2010 |
191 | KBUNL | 2X195 MW TPP, Muzaffarpur, Bihar | Pre & Post award consultancy services for setting up 2X195 MW expansion project at Muzaffarpur Thermal Power Station. | 2010 |
190 | NTPC-BSEB JV | 3X660 MW TPP, New Nabinagar, Bihar | Consultancy services for Pre and Post-award services to Nabinagar Power Generating Company for setting up 3X660 MW STPP at New Nabinagar, Bihar. | 2010 |
189 | PPCL | 750 MW CCPP, Bamnauli, Delhi | Consultancy for Pre-award services for 750 MW Pragati-II Power Project at Bamnauli | 2010 |
188 | Railways | 1000 MW TPP, Adra, WB | Preparation of Pre-Feasibility report for 1000 MW TPP at Adra, WB | 2010 |
187 | Andaman & Nicobar Administration | 33 MW Generating Station | Preparation of Feasibility report for 33 MW generating system | 2009 |
186 | DVC | 2 X 660 MW, Raghunathpur-II | Preparation of DPR for installation of 2X660 MW units at Raghunathpur Stage-II | 2009 |
185 | Singareni Collieries Company Ltd | 2 X 600 MW TPP in Dist. Adilabad, AP | Pre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's | 2009 |
184 | DVC | 2 X 660 MW, Raghunathpur-II | Consultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II | 2009 |
183 | NHDC | 2 X 660 MW Reva TPP | Consultancy services for preparation of DPR and technical specification for Site specific studies for 1320 MW (2X660 MW) Reva TPP | 2009 |
182 | UPRVUNL | 1 X 660 MW TPP, Harduaganj | Consultancy services to UPRVUNL for DPR of 1X660 MW coal based power plant at Harduaganj Extn-II | 2009 |
181 | UPRVUNL | 2 X 660 MW Obra 'C' TPP | Preparation of technical feasibility report and DPR for 2X660 MW Ext units under Obra "C" TPP | 2009 |
180 | DVC | 2 X 660 MW,-II | Consultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II | 2009 |
179 | Singareni Collieries Company Ltd | 2 X 600 MW TPP in Dist. Adilabad, AP | Pre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's | 2009 |
178 | NTPC-Railways JV | 4X250 MW Nabinagar TPP | Pre & Post award consultancy services for 4X250MW Nabinagar TPP | 2008 |
177 | MUNPL | 2 X 660 MW TPP at Meja in Allahabad (U.P) | Pre & Post award services for setting up of 2X660MW TPP at Meja in Allahabad Distt. (U.P) | 2008 |
176 | APCPL | (3X500 MW) 1500 MW Thermal Power Plant in Haryana | Owner Engineer by PFC Ltd. For the loan agreement Between APCPL and PFC for setting up (3X500 MW) 1500 MW Power Plant in Haryana | 2008 |
175 | Green Energy | 132/11 KV Substation, Tijara Town. Dubai. UAE | Engineering Design Review | 2008 |
174 | PPCL | 1500 MW (Nominal) Pragati-III, CCPP. Bawana, Delhi | Post award services for 1500 MW (Nominal) Pragati-III, CCPP | 2008 |
173 | NTECL | 3 x 500 MW Vallur power project | Design, Engg., contracting, monitoring, QA&I for setting up power plant. For additional 1 X 500 MW | 2008 |
172 | APCPL | 3X500 MW Tpp, Jhajjar | Consultancy services to Aravali Power Company Pvt. Ltd. (JV company- NTPC, HPGCL & IPGCL) for setting up 3X500 MW Power plant in Haryana | 2007 |
171 | HPGCL | 2X300 MW DCRTPP, Yamuna Nagar | Consultancy services to HPGCL for PG test for 2X300 MW DCRTPP, Yamuna Nagar | 2007 |
170 | HPGCL | 2X210 MW Panipat TPS | Consultancy services to M/s HPGCL, Panipat for energy audit of Unit nos. 5&6 (210 MW units) | 2007 |
169 | PGCIL | Korba STPS | Construction of bays at Korba STPS Switchyard for Korba-Brisinghpur-Damoh 400 KV D/C transmission | 2007 |
168 | UPRVUNL | 2X250 MW Harduaganj Extn. | Pre-award services for Harduaganj Extn. Project | 2007 |
167 | NTECL | 2X500 MW Vallur TPP | Pre & Post award Services excluding Site supervision services for 2X500 MW Vallur TPP | 2007 |
166 | PPCL | 1000 MW Pragati-III CCPP | Pre-award services to PPCL for setting up of 1000 MW Pragati-III CCPP | 2007 |
165 | UPRVUNL | Anpara-D | Owners Engineer Services for Anpara-D | 2006 |
164 | UPRVUNL | 2X250 MW Paricha Extn. | Post award consultancy services to UPRVUNL for 2X250 MW Paricha Extn. | 2006 |
163 | UPRVUNL | 2X250 MW Harduaganj Extn. | Post award consultancy services to UPRVUNL for 2X250 MW Harduaganj Extn. | 2006 |
162 | IOCL | Barauni Refinery | Electrical System study at Barauni Refinery | 2006 |
161 | SRPCL | 58 MW CCPP, Ramanathapuram | Consultancy services during pre-commissioning activities for 58 MW CCPP at Ramanathpuram, TN | 2006 |
160 | UPRVUNL | 2X500 MW & 2X500 MW Obra TPS Extn. | Technical feasibility study of 2X500 MW & 2X500 MW Obra TPS Extension. | 2006 |
159 | DVC | 2X500 MW Koderma TPP | Engineering consultancy for 2X500 MW Koderma TPP under 11th Plan | 2006 |
158 | APGENCO | KTPS(ABC), KTPS Stage-V & RTS-B stations | CS for carrying out Auxiliary consumption audit in the units of KTPS (ABC), KTPS Stage-V & RTS-B stations of GENCO | 2006 |
157 | SSNNL | SBC pumping Scheme | Selection of O&M contractor for SBC pumping scheme. | 2006 |
156 | APGCL | 235 MW CCPP, Namrup | DPR for 235 MW CCPP at Namrup | 2006 |
155 | GIPCL | 2X1000 MW new project in south Gujarat near Surat | Evaluation of RFQ bis, preparation of RFP documents and evaluation of bids for selection of JV partners | 2005 |
154 | DJB | 40 MW Captive Gas Power Plant | Preparation of FR for 40 MW CGPP at Sonia Vihar. | 2005 |
153 | PGCIL | Auraiya Gas Power Project | Deposit work for execution of 400 KV bays extension at Auraiya GPS Switchyard | 2005 |
152 | SSNNL | Kachchh Branch Canal | Pre & Post award engineering for pumping plants on Kachchh Branch Canal | 2005 |
151 | GIPCL | 2X1000 MW PP | Review of Information memorandum for selection of JV partners for proposed 2X1000 MW PP. | 2005 |
150 | PPCL | 330 MW Pragati CCPP, Extn. | Preparation of EIA studies for Pragati Phase-I | 2005 |
149 | IOCL | Haldia Refinery | Detail study for 2nd Gas turbine hook-up at Haldia Refinery of IOCL | 2005 |
148 | CSEB | 2X660 MW Surguja TPS | DPR for 2X660 MW Coal based TPS, Distt. Surguja | 2005 |
147 | DVC | 210 MW Durgapur TPS, U-4 | Condenser Leak Detection Test with Helium Gas for DTPS U-4 (210 MW) | 2005 |
146 | PPCL | 330 MW Pragati CCPP | Preparation of FR for Pragati CCPP Ph-II-330 MW | 2005 |
145 | IPGCL | Rajghat TPS | Installation of effluent treatment plant for Rajghat TPS. | 2004 |
144 | APGENCO | Rayalseema TPS | Auxiliary power consumption audit at Rayalseema TPS | 2004 |
143 | UPRVUNL | 500 MW Anpara C TPS | Selection of developer & providing technical services for preparation of RFP document, bid evaluation, award recommendations. | 2004 |
142 | CSEB | 2X250 MW Korba (W) TPS | Preparation of tender document for 2X250 MW to 2X300 MW Korba (W) TPS | 2004 |
141 | CSEB | 2X250 MW Korba (W) TPS | Preparation of revised comprehensive EIA report for Korba (W) TPS | 2004 |
140 | DVC | 2X250 MW Mejia TPS Extn. | Determining the project cost for 2X250 MW Mejia TPS Extn. | 2004 |
139 | IOCL | Haldia Refinery | Electrical system study at Haldia Refinery of IOCL | 2004 |
138 | APGPCL | 272 MW Vijjeswaram CCPP | Selection of O&M Contractor for 272 MW Vijjeswaram CCPP | 2004 |
137 | PPCL | 300 MW Pragati CCPP Extn. | Preparation of Pre-FR for proposed PP on ash bund area on Ring road | 2004 |
136 | PGCIL | Sipat TPP | Deposit work for 400 KV bays at Sipat STPP Switchyard | 2004 |
135 | PGCIL | NCPS, Dadri | Deposit work for construction of 400 KV Switch yard line bay extension at NCPS, Dadri | 2003 |
134 | GPCL | Ghogha Lignite PP | Selection of JV partner for Ghogha Lignite PP | |
133 | Essar Power Ltd. | 515 MW Essar CCPP | Auditing of electrical system at 515 MW CCPP of Essar Power Ltd. | 2003 |
132 | IPGCL | IP Station & Rajghat TPS | Evln. of tech. & commercial bid for Ash dyke for IP Stn. & Rajghat TPS. | 2003 |
131 | UPRVNL | 2 x 500 MW Anpara TPP | Prep. of tender doc. for 2 x 500 MW Anpara TPP | 2003 |
131 | UPRVNL | 2 x 500 MW Anpara TPP | Prep. of tender doc. for 2 x 500 MW Anpara TPP | 2003 |
130 | UPRVNL | Harduaganj TPS | Prep. of technical FR for Harduaganj TPS | 2003 |
129 | MSEB | Koradi TPS | Raising of Ash bund & spillway from TBL 325 M to 328 M for Koradi TPS | 2003 |
128 | PPCL | 330 MW CCPP | Prep. of FR & EIA report | 2003 |
127 | GPCL | 500 MW TPP in Chhattisgarh | Selection of JV partner for developing 500 MW TPPin Chhattisagrh | 2003 |
126 | APGENCO | 542 MW Vemagiri CCPP. | Updation of Pre-FR for Vemagiri CCPP. | 2003 |
125 | IPPGCO. | 2 x 67.5 MW Rajghat TPS | Ash pond mgmt. For IP Stn. & Rajghat TPS. | 2003 |
124 | CSEB | 2 x 250 MW Korba East TPS. | Evaluation of EPC bid & prep. of DPR for 2 x 250 MW Korba East TPS. | 2002 |
123 | CSEB | 2 x 250 MW Korba West TPS. | Up stream slope protection of earthen bund at Korba West TPS. | 2002 |
122 | CSEB | 2 x 250 MW Korba East TPS. | Modification of earthing arrangement in 6.6.kV auxiliary supply at Korba(East)TPS | 2002 |
121 | CSEB | 2 x 250 MW Korba East & West TPS. | Augmentation of fly ash collection system and ash water re-circulation for Korba East & West. | 2002 |
120 | CSEB | 2 x 270 MW Korba West TPS | Review of FR,Prep. of DPR,Prep. of tender doc. For EPC contract,pre-of pre-qualification criteria and prep. of NIT and WIA report. | 2002 |
119 | CSEB | 2 x 250 MW Korba East TPS. | Review of FR,Prep. of DPR,Prep. of tender doc. For EPC contract, pre-of pre-qualification criteria and prep. of NIT and WIA report. | 2002 |
118 | DVB | 2 x 67.5 MW Rajghat TPS | Replacement of DAS at 2 x 67.5 MW Rajghat TPS. | 2002 |
117 | J&K Power development Corp. | 1000 MW PP in J&K State. | Prep. of Pre-FR for setting up 1000 MW Power project in J&K state. | 2002 |
116 | SSNNL | Saurashtra Branch Canal | Scrutiny of detailed engg., structural design for the work of SBC pumping scheme. | 2001 |
115 | NALCO | 2 x 120 MW CPP | Prep. of detailed FR for Ash collection and disposal system for two existing units of 120 MW each. | 2001 |
114 | DVB | 1000 MW Bawana Power project | Selection of JV partner for 1000 MW PP at Bawana. | 2001 |
113 | Konaseema Oakwell EPS | 441 MW Konaseema CCPP | Owner's Engineer Services including site supervision | 2001 |
112 | NDMC | Sub-stations | CS for establishing 33 kV & 66 kV sub station | 2001 |
111 | Gujarat Mineral Development Corporation | 2x125 MW Akrimota Lignite based Power Plant | Supervision of construction/erection & FQA services for 2 x 125 MW Lignite based power plant at Akrimota | 2001 |
110 | DVB | IP station | CS for comprehensive study | 2000 |
109 | NALCO | Nalco captive Power Plant | CS for updating the cost of 8th unit | 2000 |
108 | Rural Electricity Corporation | Construction of office building | CS for review of estimate | 2000 |
107 | Railways board | 500 MW Coal based plant | Feasibility report for setting up a coal based TPS | 2000 |
106 | Admn. of Andaman & Nicobar islands | 5 MW Andaman DGPP | Feasibility report | 2000 |
105 | Power Grid Corporation Of India Ltd. (SR) | PGCIL Township at Kayamkulam CCPP | Deposit work for construction of dwelling units Kayamkulam | 1999 |
104 | Delhi Vidyut Board. | 300 MW Combined Cycle Power Project. | Owner's Engineer Services. | 1999 |
103 | NDMC | Sub-stations of NDMC | Consultancy services for earthing system | 1999 |
102 | MSEB | Koradi Thermal Power Station | CS for raising ash dyke | 1999 |
101 | NALCO | 30 MW Black start up power | Feasibility report preparation | 1999 |
100 | APGENCO | 650-700 MW gas based CCPP at Vemagiri | Pre-feasibility report for the proposed station | 1999 |
99 | DVB | IP station | Technical feasibility for water treatment plant. | 1999 |
98 | National Aluminium Company. | Nalco captive power plant. | Review of issues relating to setting up of 8th Unit. | 1999 |
97 | Union Territory of Chandigarh. | 100 MW CCPP at Chandigarh. | Feasibility Report & EIA study. | 1999 |
96 | North Eastern Electric Power Corpn. | 4 X 21MW Agartala Gas Turbine Project. | Consultancy services for review of tenders for Water Treatment System. | 1999 |
95 | Usha Martin Industries Ltd. | 1 X25 MW Captive Power Project plant at Jamshedpur. | Consultancy Services for development for Ash Mound. | 1999 |
94 | Andhra Pradesh Power Generation Corporation Ltd. | 2X210 MW coal based Rayalaseema thermal power project. | Technical evaluation of bids received from EPC Contracts. | 1999 |
93 | Surat Municipal Corporation Ltd. | 60 MW captive power plant. | Preparation of feasibility Report. | 1999 |
92 | Power Grid Corporation Of India Ltd. (NR) | 220kV switchyard at Faridabad Gas Based CCPP | Deposit work for switchyard erection | 1998 |
91 | Tamil Nadu Electricity Board. | 500MW Thermal Power Plant at Tuticorin. | Preparation of Feasibility Report and EIA study. | 1998 |
90 | Punjab State Electricity Board | 120 MW Naphtha based power plant. | Updating the cost estimate for DPR. | 1998 |
89 | Bharat Aluminium Co. Ltd. | Captive power plant at Korba. | Feasibility report for 2X67.5 MW extension. | 1998 |
88 | ONGC-NTPC joint venture. | 400 MW Gas based power project at Hazira. | Feasibility report & EIA study. | 1998 |
87 | Delhi Vidyut Board. | 300 MW Pragati CCPP. | EAI study. | 1998 |
86 | Larsen & Toubro. | 2x287 MW TPP at Bhilai. | Review of engineering for 275 Mtr. high chimney. | 1998 |
85 | National Aluminium Company. | Captive power plant at Angul. | Examining need for setting up 8th unit. | 1998 |
84 | Kerala State Electricity Board. | 128 MW Diesel PP at Kozhikode. | Finalization of Contract, Detailed Engg., Inspection Services, Construction, Supervision. | 1997 |
83 | West Bengal Power Development Corporation Ltd. | 2X210 MW TPP at Bakreswar | Project management, QA& Inspection, FQA Services. | 1997 |
82 | Delhi Vidyut Board. | 300 MW Pragati CCPP. | Feasibility Report. | 1997 |
81 | Delhi Vidyut Board. | 300 MW Indraprastha CCPP | Technical feasibility. | 1997 |
80 | Tamil Nadu Industrial Captive Power Company Ltd. | 2X250 MW Thermal Power Project at Srimushnam. | Preparation of PDMs, technical specifications for Main Plant, engineering for Chimney and finalization of quality plans. | 1997 |
79 | National Buildings Construction Corporation Ltd. | 2X210 MW Thermal Power Project at Bakreswar | Design of Chimney. | 1997 |
78 | Sargent & Lundy, USA. | Rain Calcining Unit, Vishakhapatnam. | Deputation of NTPC experts for site construction supervision. | 1996 |
77 | Sardar Sarovar Narmada Nigam Ltd. | Saurashtra Branch Canal. | Model studies for pumping system. | 1996 |
76 | Sumitomo Corporation. | Gas based CCPP at Vijjeswaram. | Checking of Stack design. | 1996 |
75 | Siasin Energy Private Ltd. | Vypeen Power Project. | Pre Award Owner's Engineer Services. | 1996 |
74 | Tamil Nadu Electricity Board | NMTPP- Simulator | Evaluation of Bids for Thermal Training Simulator | 1995 |
73 | West Bengal, Power | Proposed Power Project in Rajasthan | Assistance in preparation of Bid | 1995 |
72 | Videocon International Ltd. | 2X525 MW North Madras Thermal Power Project- II. | EIA study, Detailed Engg, Quality Assurance & inspection etc. | 1995 |
71 | Jindal Power Ltd. | Raigarh-2X250 MW, Thermal Power Project. | Feasibility Report, Engg. DPR, Review Engg., QA & Inspection, site Supervision. | 1995 |
70 | Sargent & Lundy, USA. | Rain Calcining Unit, Vizag. | Dispersion Modelling Studies. | 1995 |
69 | Sardar Sarovar Narmada Nigam Ltd. | Saurashtra Branch Canal. | Basic engineering for Concrete Volute Casing Pumps. | 1995 |
68 | Westmont Engineering, Malaysia. | Gas based Power Plant in Orissa. | Preparation of DPR for Barge Mounted Power Plant. | 1995 |
67 | National Development Corpn., Tanzania. | Mchuchuma Mining-cum-Power Project. | Preparation of Feasibility Report. | 1995 |
66 | Punjab State Electricity Board. | 200 MW Thermal Project. | Preparation of Feasibility Report. | 1995 |
65 | Saudi Cable Marketing Co. | Transmission System enhancement in Saudi Arabia. | Seminar on High Voltage Transmission System. | 1995 |
64 | National Building Construction Corpn. Ltd. | Bhatinda TPS (2X210 MW) of PSEB. | Design of Chimney. | 1995 |
63 | Surat Electricity Co. | -- | Pre- Feasibility Report for Thermal Project. | 1995 |
62 | Dubai Electricity & Water Authority. | Awir, Hatta & Mushrif Substation. | Turnkey Construction of 2 nos. 132kV substation & modification of one substation. | 1994 |
61 | Spectrum Power Generation Ltd. | 206 MW Kakinada Gas Based Combined Cycle Power Plant, Andhra Pradesh. | Engineering, QA & Inspection, Contract & Procurement, Project Management, Site Supervision, Pre-commissioning services. | 1994 |
60 | Videocon Intl. Ltd | 500 MW north Madras Thermal Power Stage II | Preparation of Feasibility report | 1994 |
59 | Videocon Intl. Ltd. | 500 MW North Madras Thermal Power Stage- II | Preparation of Functional Specification | 1994 |
58 | Karnataka Electric Board. | 1000 MW Thermal Power Project. | Review of FR by Cogentrix, USA. | 1994 |
57 | Indian Oil Corpn. | Captive Power Plant at Mathura Refinery. | Preparation of Feasibility Report. | 1994 |
56 | Asea Brown Boveri Ltd. | 230 MW Gas Based CCPP at Jegurupadu for GVK Industries. | Design & Engineering Consultancy Services for CW System. | 1994 |
55 | Oman Oil Company. | Proposed Gas Based Power Project. | Preparation of Pre- Feasibility Report. | 1994 |
54 | India Dye Stuff Industries. | Private Sector Power Projects Madhya Pradesh. | Technical Services for Private Sector Power Project in Madhya Pradesh. | 1994 |
53 | West Bengal State Electricity Board. | Santaldih Thermal Power Station. | Consultancy Services for Ventilation System of TG Building. | 1994 |
52 | Damodar Valley Corpn. | Bokaro 'B' Thermal Power Station | Consultancy Services for Ash Handling & Disposal. | 1994 |
51 | Bharat Aluminum Co. Ltd. | TL Link from Korba Super Thermal Power Project. | Study of transmission Link between Korba STPP and Balco Captive Power Project. | 1994 |
50 | Nepal Electricity Authority. | Seventh Power Project (ADB Assisted). | Execution of twenty-one nos. 132, 66 and 33kV substations on turnkey basis. | 1993 |
49 | Gas Authority of India Ltd. | 220kV line terminal bays at Auraiya Gas base power plant. | Engineering and construction of line bays. | 1993 |
48 | Gujarat Electricity Board. | 220kV line terminal bays at Kawas Gas Based Power Plant. | Engineering and construction of two additional line bays. | 1993 |
47 | Madhya Pradesh Electricity Board. | 220kV line terminal bays at Auraiya Gas Based Power Plant. | Engineering and construction of two additional line bays. | 1993 |
46 | India Oil Corpn. Ltd. | 3X25 MW Panipat Captive Thermal Power Station. | Preparation of feasibility report, design, engineering, QA& Inspection, procurement, project management & site supvsn. | 1993 |
45 | Usha Rectifier Corpn. Ltd. | Redi & Jagdishpur Power Station. | Preparation of feasibility Report for Power Station at Redi, Maharastra & Jagdishpur, U.P. | 1993 |
44 | Neyveli Lignite Corpn. Ltd. | Thermal Power Station-I. | Automatic Fire Sprinkler System for Cable Gallery. | 1993 |
43 | Govt. of Orissa | Durgapur Thermal Power Station. | Preparation of feasibility report & field investigation. | 1993 |
42 | Govt. OF Orissa | Gopalpur Thermal Power Station. | Preparation of feasibility report & field investigation. | 1993 |
41 | ACC Babcock Ltd | Budge Budge TPP of CESC LTD. | Design, Engineering, Procurement and Inspection services for boiler, Control & Instrumentation. | 1993 |
40 | Bombay Suburban Electric Supply Ltd. | Substation Townships. | Architectural & Civil design of staff quarters at substation sites. | 1993 |
39 | West Bengal state Electricity Board | 132 KV Transmission Line. | Review of tower design and revised river crossing proposal. | 1993 |
38 | Govt. of Orissa | Naraj Thermal Power station. | Preparation of Feasibility Report & field investigation. | 1993 |
37 | EPDCI, Japan | Kathalguri Gas Power Project. | Engineering services for intake well, raw water piping and bridge. | 1993 |
36 | Madhya Pradesh Electricity Board | Gwalior Gas Project. | Preparation of detailed feasibility report. | 1993 |
35 | Bharat Heavy Electrical Ltd. | 2X210 MW Kerman Power Station, Iran | Design and engineering of steel lined multi-flue Chimney. | 1993 |
34 | Sunflag Industries | Waste heat recovery in steel plant. | Assessment of thermal potential of exhaust gas & char of the kiln and optimal solution for waste heat recovery. | 1993 |
33 | Assam state Electricity Board | Amguri Gas Power Project. | Establishment of gas linkage and pre-feasibility study. | 1993 |
32 | North Eastern Electric Power Corporation | Kathalguri combined Cycle Power Project (6X30+3X30 MW). | Preparation of amended detailed project reports. | 1992 |
31 | Balarpur Industries Ltd. | Manah Gas project, Oman | Pre-tender Services | 1992 |
30 | Damodar Valley Corpn. | (3x200 MW) Mejia Thermal Power Project. | Basic design and detailed engineering including const. drgs. for 220m high Chimney. | 1992 |
29 | North Eastern Electric Power Corporation. | Kathalguri Combined Cycle Power Project (6X30+3X30 MW). | Complete design & detailed engineering for civil works of the project. | 1992 |
28 | Bombay Suburban Electric Supply Ltd. | 2X250 MW Dahanu Thermal Plant (Generating station). | Preparation of Specn., detailed design & engineering, technical evaluation of tenders, QA & Inspection of line materials. | 1992 |
27 | Dubai Electricity & Water Authority. | 400 & 132kV transmission line construction. | Turnkey supply and installation/constn. of 400kV & 132 kV Transmission line and up-gradation of existing 132kV line to 400kv. | 1991 |
26 | Orissa State Electricity Board | Talcher Thermal Power Station. | Design and engineering of Ash pond and recycle of water. | 1991 |
25 | Bombay Suburban Electric Supply Ltd. | Dahanu 2X250 MW Thermal Power Station (Transmission Lines.). | Review of design and drgs. of 220 KV transmission line towers and tower foundations. | 1991 |
24 | Birla GTM/E Technical Services Ltd. | Andhra Pradesh State Electricity Board. | Pre- tender transmission line tower and foundation design. | 1991 |
23 | J.K. Organisation | Energy sector studies. | Techo- commercial comparison of thermal power project using different fuel mix and recommendation for setting up Power Plant. | 1991 |
22 | Karnataka Power Corporation Ltd. | Raichur Substation. | System Studies to assess quantum of reactive compensation and fault studies. | 1991 |
21 | Karnataka Electricity Board. | Transmission System. | Engineering, Procurement, Project Management & construction of 400kV line loop-in loop-out. | 1990 |
20 | Maharastra State Electricity Board. | Chandrapur Phadge HVDC transmission system. | Basic and detailed engineering, tender evaluation, QA & Inspection, site supervision. | 1990 |
19 | Steel Authority of India Ltd., Bhilai | 60MW Gas Based Captive CCPP. | Preparation of Feasibility Report | 1990 |
18 | Orissa Power Generation Corporation. | Ib Thermal Power Station. | CW System Studies | 1990 |
17 | GVK Industries Pvt. Ltd. | 400MW Gas Based Power Project in Godavari Basin. | Preparation of Feasibility Report | 1990 |
16 | Delhi Vidyut Board. | 220kV Mandaula Substation. | Design, engineering, procurement and execution on turnkey basis. | 1989 |
15 | Delhi Electric Supply Undertaking. | 400 KV double Circuit Transmission Line & 400/ 220KV substations. | Design, engineering, procurement, QA & Inspection and assistance in site construction. | 1989 |
14 | Eastern Coal Fields Ltd. | Farakka- Lalmatia 220KV Transmission Line & 220/132KV Substation. | Design, Construction, operation & Maintenance. | 1989 |
13 | Bombay Suburban Electric Supply Ltd. | 2X250MW Dahanu Thermal Power Station. | Basic engineering, spenc. preparation for main packages detailed engineering for chimney and QA for main plant. | 1989 |
12 | TATA Exports | Transmission Lines project of EGAT, Thailand | Design of 230 KV Transmission Towers including line diagrams, all types of standard RCC foundation design. | 1989 |
11 | Bombay Suburban Electric supply Ltd. | 2x 250 MW Dahanu Thermal Power Station (Transmission Lines) | System studies, design preparation of specn. for part 220 KV transmission lines and substation material/ services | 1989 |
10 | Madras Refineries Ltd. | Study of Captive Power Station (20MW), Boiler & TG Auxiliaries | Examination of present Captive Power Plant to determine likely availability on assured basis in future. | 1989 |
9 | National Project Construction Corporation. | Kathalguri-Mariani 400KV Towers Double circuit line of NEEPCO | Tower Design for 400 KV Tower. | 1989 |
8 | Delhi Vidyut Board | Indraprastha Thermal Power Station. | Preparation of Feasibility Report for closed circuit CW System. | 1987 |
7 | Coal India Ltd. | Captive Gas Turbine Plant. | Preparation of specification. | 1987 |
6 | ASEA, Sweden | Hydro Quebec-New England, multi terminals HVDC project. | System studies & Engineering. | 1987 |
5 | Delhi Vidyut Board | Rajghat Thermal Power Station (2X67.5 MW) | Engineering Review | 1987 |
4 | Bridge & Roof Company | Neyveli Lignite Thermal Power Station Stage -II (4X210 MW) | Pre-Tender design for Chimney | 1986 |
3 | Bharat Aluminium Co. | 4X67.5 MW Captive TPS at Korba & associated 220KV transmission system. | Design, Construction, Commissioning and Project Management. | 1984 |
2 | Neyveli Lignite Corporation. | 400 KV Transmission System including two 400 KV Substation. | Design, Construction, Commissioning and Project Management. | 1984 |
1 | Bharat Heavy Electrical Ltd. | Vishakhapatnam Steel Plant Captive Thermal Power station | Multi-flue Chimney Design | 1983 |