PARTICULARS OF ORGANISATION, FUNCTIONS AND DUTIES
Particulars of Organization |
---|
a) | Date of incorporation | 7 November, 1975 |
b) | Mode of incorporation | Incorporated under Companies Act 1956 as a Private Limited Company under the name National Thermal Power Corporation Private Ltd. However, the word "Private" was deleted on 30 Septemberer,, 1976 consequent upon notification issued by GoI exempting Government Companies from the use of word "Private". The Company was converted to Public Ltd. Company on 30 September., 1985. Name of the Company was changed to NTPC Limited on 28 October., 2005. |
c) | Administrative Ministry | Ministry of Power, Government of India |
d) | Details of Disinvestments | The Govt. of India was holding the entire paid- up capital of the Company till October 2004. After divestment of 5.25% of its holding by GOI and fresh issue of 5.25% by the Company to the public through Initial Public Offering in October 2004, the holding of GOI reduced to 89.5%. GOI divested its shareholding in the Company from time to time. At present, the GOI is holding 51.10% of equity shares in the Company. The balance is held by public, FIIs, Mutual Funds and Banks. |
e) | Present status | A Government Company within the meaning of Section 2 (45) of the Companies Act, 2013. |
f) | Share Capital | |
| Rs. 10,000.00 crore Rs. 9696.97 crore | |
g) | Present Shareholding | Click Here |
h) | Listing with Stock Exchanges | The equity shares of the Company are presently listed with the following stock exchanges
|
i) | Address of Registered Office | NTPC Bhawan SCOPE Complex 7, Institutional Area Lodi Road New Delhi – 110 003 Phone N0. (011) 24360100 Fax No. (011) 24361018 Email: ntpccc@ntpc.co.in Website: ntpc.co.in. Corporate Identity Number: L40101DL1975GOI007966 |
j) | Address of Company’s Registrar & Transfer Agent | For Shares: For Shares: M/s Alankit Assignments Limited,
KFin Technologies Private Limited (b) Registrar and Transfer Agent for Bonds (Series 24) MAS Services Ltd. (c) Registrar and Transfer Agent for Bonds (Series 17, 27 to 49 and 51 to 53, 55 and 57 to 73) Beetal Financial & Computer Services Pvt. Ltd. |
Function and Duties |
---|
Company’s Vision, Mission and Core Values
VISION
"To Be World’s Leading Power Company, Energizing India’s Growth."
MISSION
“Provide Reliable Power And Related Solutions In An Economic Efficient And Environment Friendly Manner, Driven By Innovation And Agility”.
CORE VALUES
(ICOMIT)
I | Integrity |
C | Customer Focus |
O | Organisational Pride |
M | Mutual Respect & Trust |
I | Innovation & Learning |
T | Total Quality & Safety |
Business of the Company |
---|
NTPC has been established to carry out the objectives specified in the Memorandum & Articles of Association of the Company as amended from time to time. The main activities of NTPC are setting up of power plants and power generation through its coal-based and gas-based power plants. The Company has also diversified into construction of hydro power plants and generation of hydro power besides power trading and distribution of electricity. The Company has entered into area of coal mining & coal washery and oil exploration as well. The company has also ventured into Nuclear Power and Renewable Energy.
The business portfolio of the company is as under:
- Power Project Construction.
- Renovation & Modernization of Power Stations
- Generation of Electric Power.
- Coal Mining and Coal Washery.
- Oil/ Gas Exploration.
- Distribution and Trading of Electricity through its wholly-owned subsidiary companies.
The company is also participating, in to following businesses through its Joint Venture Companies:
- Power equipment manufacturing
- Power related services
- Energy efficiency services
- Renewable Energy
- Nuclear Power
- Urea
Addresses of NTPC Head quarters, Regional Offices, Stations & Projects |
---|
CORPORATE OFFICE: NTPC BHAWAN CORE-7, SCOPE COMPLEX, 7, INSTITUTIONAL AREA, LODHI ROAD, NEW DELHI-110003 | REGIONAL HEADQUARTERS: EASTERN REGION - I 2nd FLOOR, LOKNAYAK JAIPRAKASH BHAWAN, DAK BUNGALOW CHOWK PATNA BIHAR– 800001 EASTERN REGION -II OLIC BUILDING, PLOT NO. N17/2, NAYAPALLI, BHUBANESWAR, ORISSA- 751012 |
OTHER OFFICES: ENGINEERING OFFICE COMPLEX SECTOR - 24, NOIDA DISTT. GAUTAM BUDH NAGAR UTTAR PRADESH- 201301
NTPC ENERGY TECHNOLOGY RESEARCH ALLIANCE (NETRA), POWER MANAGEMENT INSTITUTE
| NATIONAL CAPITAL REGION EOC ANNEXE, NTPC LTD., PLOT NO. A - 8A, SECTOR – 24, NOIDA DISTT. GAUTAM BUDH NAGAR UTTAR PRADESH- 201301 NORTHERN REGION TC-33V-1,VIBHUTI KHAND, GOMTI NAGAR LUCKNOW UTTAR PRADESH- 226010 SOUTHERN REGION 2nd & 5th FLOOR, MCH COMPLEX, R.P. ROAD, SECUNDERABAD, ANDHRA PRADESH- 500003 WESTERN REGION -I SAMRUDDHI VENTURE PARK 2nd FLOOR,MIDC, MAROL ANDHERI (EAST) MUMBAI MAHARASHTRA- 400093 WESTERN REGION –II MAGNETO-CONCLAVE-OFFIZO, 3rd & 4th FLOOR, LABHANDI, GE ROAD, RAIPUR CHHATTISGARH-492001 HYDRO REGION HEAD QUARTERS O.I.B.D. BHAWAN, 7th FLOOR, PLOT NO.-2, SECTOR-73, NOIDA DISTT. GAUTAM BUDH NAGAR UTTAR PRADESH- 201301
|
PROJECTS:
ANTA GAS POWER PROJECT
| RAJEEV GANDHI COMBINED CYCLE POWER PROJECT P.O. CHOOLATHERUVU, DISTT. ALAPPUZHA KERALA– 690506 KOLDAM HYDRO POWER PROJECT P.O. BARMANA, DISTT. BILASPUR HIMACHAL PRADESH– 174013 NATIONAL CAPITAL POWER STATION VIDYUT NAGAR, DISTT. GAUTAM BUDH NAGAR UTTAR PRADESH– 201008 NORTH KARANPURA SUPER THERMAL POWER PROJECT AGRAWAL REST HOUSE, MALVIYA MARG, JHANDA CHOWK HAZARIBAGH JHARKHAND– 825301 RAMAGUNDAM SUPER THERMAL POWER STATION P.O. JYOTHINAGAR, DISTT. KARIMNAGAR ANDHRA PRADESH–505215 RIHAND SUPER THERMAL POWER PROJECT P.O. RIHANDNAGAR, DISTT. SONEBHADRA UTTAR PRADESH-231223 SIMHADRI SUPER THERMAL POWER PROJECT P.O. SIMHADRI, DISTT. VISHAKHAPATNAM ANDHRA PRADESH– 531020 SINGRAULI SUPER THERMAL POWER STATION P.O. SHAKTINAGAR, DISTT. SONEBHADRA UTTAR PRADESH-231222 SIPAT SUPER THERMAL POWER PROJECT P.O. UJJWAL NAGAR, DISTT. BILASPUR CHHATTISGARH– 495555
|
TALCHER SUPER THERMAL POWER PROJECT P.O. DEEPSHIKHA (KANIHA) DISTT. ANGUL ORISSA– 759147 TALCHER THERMAL POWER STATION P.O. TALCHER THERMAL DISTT. ANGUL ORISSA– 759101 TANDA THERMAL POWER STATION P.O. VIDYUTNAGAR, DISTT. AMBEDKAR NAGAR UTTAR PRADESH-224238 DARLIPALLI SUPER THERMAL POWER PROJECT 3rd & 4th FLOOR, AMBA TOWER, HOSPITAL ROAD SUNDARGARH ORISSA-770001 GAJAMARA SUPER THERMAL POWER PROJECT MAHISHAPAT, DISTT: DHENKANAL, ORISSA – 759013 MOUDA SUPER THERMAL POWER PROJECT MOUDA-RAMTEK ROAD, P.O. MOUDA, DISTT: NAGPUR MAHARASHTRA-441104 GADARWARA SUPER THERMAL POWER PROJECT NTPC LTD, NEAR BIRGHT CAREER COMPUTER CENTRE, THAKUR BABU KI GALI, ANAND NAGAR, KANDELI NARSINGHPUR, MADHYA PRADESH- 487001 KHARGONE SUPER THERMAL POWER PROJECT NTPC LTD, 61, GANGA NAGAR, SANAWAD ROAD, KHARGONE, MADHYA PRADESH- 450001 KUDGI SUPER THERMAL POWER PROJECT PLOT NO. 9, MALLIKARJUNA NAGAR NEAR BYPASS ROAD, BIJAPUR KARNATAKA-586022
| TAPOVAN VISHNUGAD HYDROELECTRIC POWER PROJECT NTPC LTD. KAGBHUSHANDI OFFICE, NEAR GARHWAL SCOUTS, BADRINATH ROAD, JOSHI MATH, DISTT. CHAMOLI UTTARAKHAND-246443 VINDHYACHAL SUPER THERMAL POWER STATION P.O. VINDHYANAGAR, DISTT. SIDHI MADHYA PRADESH– 486885 BONGAIGAON THERMAL POWER PROJECT P.O. SALAKATI(P) DISTT: KOKARAJHAR (BTAD) ASSAM - 783369 SOLAPUR SUPER THERMAL POWER PROJECT VILLAGE FATATEWADI, POST: HOTGI STATION, TALUKA SOUTH SOLAPUR, MAHARASHTRA-413215 LARA SUPER THERMAL POWER PROJECT NTPC LTD, PRACHI VIHAR, BADE ATARMUDA, DIST. RAIGARH CHATTISHGARH– 496001 BARETHI SUPER THERMAL POWER PROJECT NTPC LTD, D117 GREEN AVENUE, SATAI ROAD, DISTT. CHATTARPUR, MADHYA PRADESH- 471001 RUPSIYABAGAR KHASIABARA HYDRO POWER PROJECT MADKOT ROAD, POST-MUNSYARI, DISTT. PITHORAGARH, UTTARAKHAND – 262554 KOLODYNE-II HYDRO POWER PROJECT P.O. BOX NO. 01, P.O. LAWNGTLAI MIZORAM-796891 BILHAUR SUPER THERMAL POWER PROJECT GUPTA COMPLEX, GT ROAD, PURA P.O. PURA, TEHSIL-BILHAUR DISTT- KANPUR NAGAR UTTAR PRADESH-209092
|
COAL MINING PROJECTS: PAKRI BARWADIH, CHATTI-BARIATU & KERENDARI COAL MINING PROJECTS UJJWAL COMPLEX, PUGMIL ROAD, HAZARIBAGH JHARKHAND-825301
| TALAIPALLI COAL MINING PROJECT 56, GAJANAND PURAM, KOTRA THANA ROAD RAIGARH, CHHATTISGARH-496001 DULANGA COAL MINING PROJECT PLOT NO. 681/26 MISSION ROAD, SUNDERGARH ORISSA-770001
|
Subsidiaries & Joint Ventures |
---|
The names of Joint Ventures/Subsidiaries and their areas of operation/business are given below:
S.No. | Company Name (Incorporated on) | Business | % of ownership | Date of incorporation |
---|---|---|---|---|
Subsidiary | ||||
1. | NTPC VidyutVyapar Nigam Limited | Power Trading, Ash Utilization | 100% | 01.11.2002 |
2. | NTPC Electric Supply Co. | Power Distribution | 100% | 21.08.2002 |
3. | KantiBijliUtpadan Nigam Limited | Power Generation | 100% | 06.09.2006 |
4. | Nabinagar Power Generating Company Pvt. Limited | Power Generation | 100% | 09.09.2008 |
5. | PATRATU VIDYUT UTPADAN NIGAM LIMITED | Power Generation | 74% | 15.10.2015 |
6. | Bhartiya Rail Bijlee Co. Ltd. | Power Generation | 74% | 22.11 .2007 |
7. | NTPC Renewable energy Limited | Renewable Energy | 100% | 07.10.2020 |
8. | NTPC Mining Limited | Coal Mining | 100% | 29.08.2019 |
9. | NTPC EDMC Waste Solutions Pvt. Limited | Power Generation | 74% | 01.06.2020 |
10. | North Eastern Electric Power Corporation Limited (became subsidiary w.e.f. 27.03.2020) | Power Generation | 100% | 02.04.1976 |
11. | THDC (India) Limited (became subsidiary w.e.f. 27.03.2020) | Power Generation | 74.496% | 12.07.1988 |
12. | TUSCO Limited (Subsidiary of THDC) | Renewable Energy | 74% [owned by THDC] | 12.09.2020 |
13. | Ratnagiri Gas & Power Pvt. Ltd. (became subsidiary w.e.f. 31.12.2020) | Power Generation | 86.49% | 08.07.2005 |
Joint Ventures: | ||||
1. | Utility Powertech Limited | Power Plant Maintenance | 50% | 23.11.1995 |
2. | NTPC SAIL Power Company Ltd. | Power Generation | 50% | 08.02.1999 |
3. | NTPC GE Power Services Pvt. Ltd. | Renovation & Modernization of Power Plant | 50% | 27.09.1999 |
4. | NTPC Tamil Nadu Energy Company Ltd. | Power Generation | 50% | 23.05.2003 |
5. | Aravali Power Co. Pvt. Ltd. | Power Generation | 50% | 21.12.2006 |
6. | MejaUrja Nigam Pvt. Ltd. | Power Generation | 50% | 02.04.2008 |
7. | NTPC BHEL Power Projects Private Limited | Power Equipment | 50% | 28.04.2008 |
8. | BF-NTPC Energy Systems Limited | Manufacturing of High Pressure Piping required in Power Plants | 49% | 19.06.2008 |
9. | Transformers and Electricals Kerala Limited | Manufacturing & Repairing of Heavy Duty Transformers | 44.6% | 09.12.1963 |
10. | National High Power Test Laboratory Private Limited | Online High Power Test Laboratory | 20% | 22.05.2009 |
11. | Energy Efficiency Services Limited | Energy Efficiency Services & Product | 47.15% | 10.12.2009 |
12. | CIL NTPC Urja Private Limited | Power Generation | 50% | 27.04.2010 |
13. | International Coal Ventures Pvt. Ltd. | Coal import | 0.09% | 20.05.2009 |
14. | AnushaktiVidhyut Nigam Ltd | Atomic Energy | 49% | 27.01.2011 |
15. | Trincomalee Power Co. Ltd. | Power Generation | 50% | 26.09.2011 |
16. | Bangladesh- India Friendship Power Company (Pvt) Ltd. | Power Generation | 50% | 31.10.2012 |
17. | Hindustan Urvarak and Rasayan Ltd. | Fertilizer | 33.33% | 15.06.2016 |
Power Equipment Manufacturing | |||
S.No. | Company Name (Incorporated on) | Promoters Equity holding | Objective |
---|---|---|---|
10. | NTPC BHEL Power Projects Pvt Ltd. (28.04.2008) | NTPC-50% BHEL-50% | To take up EPC contracts and manufacturing of equipments for power plants and other infrastructure projects in India & abroad |
11. | BF-NTPC Energy Systems Ltd. (19.06.2008) | NTPC-49% Bharat Forge Ltd.-51% | To initially take up manufacturing of castings, forgings, fittings, high pressure piping required for power projects and other industries and Balance of Plant (BOP) equipment. Under Closure Process. |
12. | Transformer & Electricals Kerala Ltd. (44.6% shares acquired by NTPC on 19.06.2009). Incorporated on 19.12.1963 | NTPC-44.6% Govt. of Kerala-55.56% Banks-0.84% | For manufacturing and repair of high voltage transformers and associated equipment. |
Power Services | |||
13. | Utility Powertech Ltd. (23.11.1995) | NTPC-50% Reliance Infrastructure Ltd.-50% | To take up assignments of construction, erection and supervision in power sector and other sectors in India and abroad |
14. | NTPC-GE Power Services Private Ltd. (27.09.1999) | NTPC-50% GE Power 50% | To take up Renovation & Modernisation assignments of Power Plants both in India & SAARC countries |
15. | National High Power Test Laboratory Private Ltd. (22.05.2009) | NTPC-20% NHPC-20% PGCIL-20% DVC-20% CPRI-20% | For setting up an online High Power Test Laboratory for short-circuit test facility in the country. |
16. | Energy Efficiency Services Ltd. (10.12.2009) | NTPC-31.7% PFC-31.7% PGCIL-4.9% REC-31.7% | To carry out and promote the business of Energy Efficiency, Energy Conservation and Climate Change. |
Coal Mining | |||
17. | International Coal Ventures Pvt. Ltd. (20.05.2009) | NTPC – 0.11% rest of the shares are held by, RINL & NMDC, SAIL & CIL. | NTPC Board has approved the proposal for withdrawal from ICVL. Letter issued to ICVL for withdrawal. ICVL is in the process of obtaining cabinet clearance on the same. |
18. | NTPC-SCCL Global Venture Pvt. Ltd. (30.07.2007) | NTPC-50% Singareni Collieries Co. Ltd.-50% | To undertake the development and O&M of coal blocks and integrated coal based power projects in India and overseas. Company is under closure process. |
19. | CIL NTPC Urja Pvt Ltd (27.04.2010) | NTPC – 50% CIL – 50% | Development, operation and maintenance of Brahmini & Chichro Patsimal coal blocks in Jharkhand. These blocks have been de-allocated. |
20. | Hindustan Urvarak & Rasayan Limited | NTPC -33.33% CIL-33.33% IOCL-33.33% FCIL & HFCL-0.01% | To establish and operate new fertilizer and chemicals complexes (urea- ammonia and associated chemical plants) at Gorakhpur & Sindri units of FCIL and Barauni unit of HFCL and to market its products, taking into consideration the assets of FCIL and HFCL at Gorakhpur, Sindri and Barauni. |
Subsidiaries:
S.No. | Company Name (Incorporated on) | Promoters Equity holding | Objective |
---|---|---|---|
Power Generation | |||
1. | Bhartiya Rail Bijlee Company Ltd. (22.11.2007) | NTPC-74% Indian Railways-26% | To set up a power plant of 1000 (4x250) MW capacity to meet the requirements of Railways. |
2. | Kanti Bijlee Utpadan Nigam Ltd. (06.09.2006) | NTPC-65% BSEB-35% | To take up and operate Muzaffarpur Thermal Plant (2x110 MW) in Bihar and expansion of the station by 2x195 MW. |
3. | Patratu Vidyut Utpadan Nigam Limited (15.10.2015) | NTPC-74% JBVNL-26% | To set up a power plant of 2400 MW at to take over existing power plant of Patratu TPS. |
Distribution | |||
4. | NTPC Electric Supply Co. Ltd. (21.08.2002) | NTPC-100% | Consultancy services and distribution of power. NTPC Board has decided to close down all operations of this company. |
Trading | |||
5. | NTPC Vidyut Vyapar Nigam Ltd. (01.11.2002) | NTPC-100% | Trading of power. |
Details of Power Generation Click Here
Coal Mining & Washery |
---|
Out of the ten coal blocks allotted to NTPC earlier from Oct. 2004 to July 2013, 5 coal blocks (namely Chatti-Bariatu South, Kerandari, Dulanga, Talaipalli) were cancelled vide Hon'ble Supreme Court's Order dated 24.09.2014. Subsequently, MoC on 24.03.2015 declared reallocation of 4 coal blocks (earlier 5 coal blocks clubbed into 4) namely Chatti-Baratu & Chatti-Bariatu (South), Kerandari, Dulanga, Talaipalli to NTPC. Allotment agreements have been signed between NTPC and Govt. of India for these coal blocks on 30.03.2015.
Govt. of India also issued formal allotment letters to NTPC on 31.03.2015 for Banai & Bhalumuda coal blocks. Kudanali-Luburi coal block has been allotted jointly to NTPC and JKSPDCL. With the allocation of total 8 coal blocks with estimated geological reserves of 3.5 BT, NTPC expects to produce about 82 million Tonnes per annum.
Oil Exploration
NTPC has signed Production Sharing Contracts (PSCs) on 30.06.2010 with Govt. of India for four (4) Oil/Gas exploration blocks awarded under NELP-VIII. These include three offshore blocks (one in Andaman Basin and two in KG Basin) awarded in consortium with ONGC as operator and NTPC having 10% Participating Interest (PI) and one on land block viz. CB-ONN-2009/5 in Cambay Basin, where NTPC has 100% PI and is the Operator. The company along with consortium partners has decided to relinquish 2 (two) blocks one Andaman Basin Block AN-DWN-2009/13 and one KG Basin Block KG-OSN-2009/1 and ONGC (the Operator) has submitted the applications to Directorate General of Hydrocarbons in this regard. Exploration work is in progress in the remaining two blocks.
Two blocks, one Andaman Basin Block AN-DWN-2009/13 and one KG Basin Block KG-OSN-2009/1 have already been relinquished. NTPC has also decided to relinquish the Cambay Basin Block CB-ONN-2009/5 and has submitted the applications to Directorate General of Hydrocarbons in this regard. Exploration work has been completed in the KG Basin Block KG-OSN-2009/4 & the data acquired is under review.
Major Fuel resources
Coal
Coal Data of NTPC power operating stations for FY2020-21
Fig. in MMT
FY 2021-22 (All fig in MMT excluding JVs) | As on 31.03.2022 | ||||
---|---|---|---|---|---|
Receipt | Consumption | Stock | |||
Domestic | Imported | Domestic | Import | Domestic | Import |
193.15 | 2.47 | 193.98 | 2.39 | 8.55 | 0.16 |
*All Fugures in MMT
*These Figures are Excluding JVs
Gas/ Liquid Fuel
The total capacity of NTPC gas plants is 4017 MW with requirement of 16.39 MMSCMD gas at 85% PLF. Natural Gas is primary fuel source for NTPC's existing six gas based stations viz. Anta, Auraiya, Dadri, Faridabad, Kawas and Jhanor-Gandhar. Liquid fuel is used as secondary fuel in above gas-based stations except in Jhanor-Gandhar. RGCCPP, Kayamkulam station is run with Naphtha (Liquid Fuel) as primary fuel. Domestic gas supplies to NTPC gas stations have become Nil w.e.f. 16.06.2021 due to diversion of GoI allocated gas to CGD sector, as per MoP&NG guidelines. Presently Gas stations are operating on LTRLNG & spot RLNG mostly for meeting peaking/balancing demand of Grid.