Loading...
Date Subject Attachment
Oct 12, 2026 Newspaper publication regarding intimation of the proposed transfer of shares. View/Download
Oct 10, 2026 Declaration of Commercial Operation of fourth part capacity of 66.18 MW of Kalasar Solar Energy Project, Bikaner, Rajasthan, out of 650 MW of Solar component under 500 MW REMCL RTC Project of NTPC Renewable Energy Limited, a step-down subsidiary of NTPC Limited through NGEL. View/Download
Oct 07, 2026 Newspaper publication regarding intimation of Special Window for Transfer and Dematerialisation of Physical Securities of NTPC Limited. View/Download
Oct 05, 2026 Cessation of Shri Piyush Singh (DIN:07492389), as Government Nominee Director of NTPC. View/Download
Oct 01, 2026 Declaration of Commercial Operation of fourth part capacity of 50 MW solar capacity out of cumulative 300 MW solar component, as part of 200 MW RE Round The Clock (RTC) project capacity located in Rajasthan by a group company of NGEL. View/Download
Sep 30, 2026 Declaration of Commercial Operation of second and the third part capacity of 73.06 MW and 80.88 MW, respectively, of Kalasar Solar Energy Project, Bikaner, Rajasthan, out of 650 MW of Solar component under 500 MW REMCL RTC Project of NTPC Renewable Energy Limited, a step-down subsidiary of NTPC Limited through NGEL. View/Download
Sep 30, 2026 Intimation regarding Change in Senior Management. View/Download
Sep 26, 2026 Declaration of Commercial Operation of first part capacity of 81.34 MW of Kalasar Solar Energy Project at Bikaner, Rajasthan out of 650 MW of solar component under 500 MW REMCL RTC Project of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL. View/Download
Sep 22, 2026 Intimation of ESG rating by CRISIL ESG Ratings & Analytics Limited. View/Download
Sep 22, 2026 Declaration of Commercial Operation of following projects of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL:

i. Fourth part capacity of 6.3 MW of Vanki Wind Energy Project at Nakhatrana, Kutch, Gujarat, out of 1050 MW of wind component under 500 MW REMCL RTC Project w.e.f. 00:00 hrs. of 22nd September 2026.

ii. First part capacity of 50.4 MW of Jamjodhpur Wind Energy Project at Jamnagar, Gujarat, out of 1050 MW of wind component under 500 MW REMCL RTC Project w.e.f. 00:00 hrs. of 22nd September 2026.
View/Download
Sep 22, 2026 Intimation regarding closure of Trading Window for Insiders. View/Download
Sep 19, 2026 Declaration of Commercial Operation of following projects of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL:

(i)   third part capacity of 68.22 MW out of 200 MW Gujarat Solar PV Project at Dahod, Gujarat w.e.f. 23rd July 2026.

(ii)  third part capacity of 9.45 MW of Vanki Wind Energy Project located in Nakhatrana, Kutch, Gujarat w.e.f. 00:00 hrs. of 19th September 2026.
View/Download
Sep 18, 2026 Intimation of ESG rating by Niche Ninety Nine Capability and Certifications (OPC) Private Limited. View/Download
Sep 18, 2026 Appointment of Statutory Auditor by Comptroller & Auditor General of India for the Financial Year 2026-27. View/Download
Sep 12, 2026 Declaration of COD of second part capacity of 6.3 MW of Vanki Wind Energy Project located in Nakhatrana, Kutch, Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL. View/Download
Sep 08, 2026 Appointment of Statutory/Joint Statutory Auditors by C&AG for Financial Year 2026-27. View/Download
Sep 03, 2026 Intimation of ESG rating by ESG Risk Assessments and Insights Limited. View/Download
Aug 31, 2026 Intimation regarding Change in Senior Management- Cessation. View/Download
Aug 27, 2026 Proceedings of 50th Annual General Meeting of the Company held on 27th August 2026. View/Download
Aug 27, 2026 Voting Results and Scrutinizer''s Report of 50th Annual General Meeting of NTPC Limited held on 27th August 2026. View/Download
Aug 26, 2026 Notice from the Stock Exchange for the quarter ended 30.06.2026 View/Download
Aug 07, 2026 Newspaper publication regarding special window for transfer and dematerialisation physical securities of NTPC Limited. View/Download
Aug 05, 2026 Newspaper publication regarding Notice of the 50th Annual General Meeting. View/Download
Aug 04, 2026 Business Responsibility and Sustainability Report for Financial Year 2025-26. View/Download
Aug 04, 2026 Notice of the 50th Annual General Meeting.

Integrated Annual Report for the Financial Year 2025-26.
View/Download
Jul 31, 2026 Intimation regarding Change in Senior Management- Cessation. View/Download
Jul 29, 2026 Declaration of COD of third part capacity of 50 MW Solar Capacity out of 150 MW Solar component, as part of 100 MW RE Round The Clock (RTC) project capacity located in Rajasthan, by a group company of NGEL. View/Download
Jul 28, 2026 Newspaper publication regarding 50th Annual General Meeting (AGM) of the Company. View/Download
Jul 28, 2026 Intimation regarding extension of tenure of the Chairman & Managing Director of NTPC Limited. View/Download
Jul 27, 2026 Intimation of Date of 50th Annual General Meeting (AGM) and Record Date for the purpose of Final Dividend for the Financial Year 2025-26. View/Download
Jul 24, 2026 Declaration of COD of first part capacity of 64.76 MW out of 225 MW GSECL RE Park, Khavda Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. View/Download
Jul 24, 2026 Outcome of Board Meeting held on July 24, 2026- Raising of funds through issue of Non-Convertible Debentures. View/Download
Jul 22, 2026 22nd Annual Analysts and Institutional Investors Meet View/Download
Jul 18, 2026 Appointment of Dr. Som Nath Sachdeva as an Independent Director on the Board of the Company. View/Download
Jul 17, 2026 Nomination of independent Director View/Download
Jul 17, 2026 Declaration of COD of 11 MWac Floating Solar Plant on the Raw Water Reservoir of Khurja STPP of THDC India Limited. View/Download
Jul 11, 2026 Investment approval for Lara Super Thermal Power Project, Stage-III (2x800 MW). View/Download
Jul 08, 2026 Declaration of COD of first part capacity of 50.4 MW of Vanki Wind Energy Project located in Nakhatrana, Kutch, Gujarat of NTPC Renewable Energy Limited. View/Download
Jun 30, 2026 Declaration of Commercial Operation of third and last part capacity of 41.6 MW out of 176 MW capacity of NTPC's Solar PV Project at Ramagundam. View/Download
Jun 30, 2026 Declaration of Commercial Operation of balance 5 MW Bhilai Floating Solar Power Station of NSPCL. View/Download
Jun 30, 2026 Intimation regarding Change in Senior Management- Cessation. View/Download
Jun 26, 2026 Intimation for incorporation of NTPC's wholly owned subsidiary i.e. NTPC (Mauritius) Energy Limited. View/Download
Jun 23, 2026 Newspaper publication regarding transfer of equity shares to IEPF. View/Download
Jun 23, 2026 Declaration of Commercial Operation of Unit#2 (800 MW) of Patratu STPP Phase-1 (3x800MW) of PVUNL. View/Download
Jun 12, 2026 Declaration of COD of third part capacity of 50 MW Solar Capacity (Cumulative 250 MW Solar) out of 300 MW Solar component, as part of 200 MW RE Round The Clock (RTC) project capacity located in Rajasthan, by a group company of NGEL. View/Download
Jun 08, 2026 Change in Senior Management w.e.f. 08.06.2026 due to appointment of Executive Directors. View/Download
Jun 07, 2026 Newspaper publication regarding special window for transfer and dematerialisation physical securities of NTPC Limited. View/Download
Jun 04, 2026 Press Release titled Signing of Supplementary Joint Venture Agreement (SJVA)-III between NTPC Limited (NTPC) and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL). View/Download
May 29, 2026 Declaration of Commercial Operation of second part capacity of 34.4 MW out of 176 MW capacity of NTPC’s Solar PV Project at Ramagundam. View/Download
May 29, 2026 Intimation regarding Change in Senior Management- Cessation. View/Download
May 27, 2026 Declaration of COD of eighth and the last part capacity of 105 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. View/Download
May 27, 2026 Notice from the Stock Exchange for the quarter ended 31.03.2026. View/Download
May 23, 2026 Intimation regarding Change in Senior Management- Appointment of head of Internal Audit. View/Download
May 19, 2026 Details of conference call to be held on 23rd May 2026 to discuss the Company’s results for the quarter, and year ended 31st March 2026 with the Analysts and Investors. View/Download
May 19, 2026 Intimation regarding change in Senior Management- Cessation. View/Download
May 18, 2026 Completion of Trial Operation of Unit-2 (800 MW) by Patratu Vidyut Utpadan Nigam Limited. View/Download
May 15, 2026 Board Meeting Intimation for considering of Annual Standalone and Consolidated Financial Statements for the year ended 31st March 2026 and recommendation of Final Dividend for the year ended 31st March 2026. View/Download
May 14, 2026 Declaration of COD by group companies of NTPC Green Energy Limited. View/Download
May 07, 2026 Intimation of execution of termination agreement and acquisition of MCD's 26% shareholding by NTPC Limited. View/Download
May 02, 2026 Declaration of Commercial Operation of 100 MW out of 176 MW capacity of NTPC’s Solar PV Project at Ramagundam. View/Download
Apr 30, 2026 Intimation regarding change in Senior Management- Cessation. View/Download
Apr 27, 2026 Clarification on Market Rumour pursuant to SEBI (LODR) Regulations, 2015. View/Download
Apr 24, 2026 Declaration of COD of seventh part capacity of 90 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. View/Download
Apr 17, 2026 Declaration of COD of capacity of 150 MW Solar out of the total installed capacity of 300 MW Solar Project located in Rajasthan, by a group company of NGEL. View/Download
Apr 17, 2026 Declaration of COD of capacity of 87.50 MW Solar out of the total installed capacity of 150 MW Solar Project located in Rajasthan, by a group company of NGEL. View/Download
Apr 16, 2026 Completion of tenure of Shri Anil Kumar Trigunayat as Independent Director w.e.f. 15th April 2026. View/Download
Apr 11, 2026 Declaration of COD of 4th Unit (250) MW of Tehri PSP (4X250 MW) of THDC India Limited. View/Download
Apr 10, 2026 Intimation of ESG rating by CARE ESG Ratings Limited. View/Download
Apr 08, 2026 Press release titled “NTPC Signs Non-Binding MoU with Électricité de France (EDF) for Cooperation in Nuclear Power. View/Download
Apr 08, 2026 Uprating of Dadri Thermal Power Station Unit no. 5 and 6 (from 2×490 MW to 2×500 MW) of NTPC Limited. View/Download
Apr 07, 2026 Pursuant to SEBI Circular No. HO/38/13/11(2)2026-MIRSD-POD/ I/3750/2026 dated 30th January 2026, please find attached copies of Newspaper clippings containing the notice published by the Company dated 7th April 2026. View/Download
Apr 01, 2026 Revised Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. View/Download
Apr 01, 2026 The total installed capacity of NTPC group stands at 89,108 MW and commercial capacity at 88,028 MW.. View/Download
Apr 01, 2026 Declaration of COD of Ayana Renewable Power Four Private Limited, a group company of NGEL, as detailed below:

1.The fourth part capacity of 37.5 MW Solar out of the total installed capacity of 150 MW Solar Project located in Gujarat, w.e.f. 2nd April 2026.

2.The seventh part capacity of 13.2 MW Wind out of the total installed capacity of 92.4 MW (Wind) and 37.5 MW (Solar) as part of 100 MW Hybrid Project located in Gujarat, w.e.f. 2nd April 2026.
View/Download
Apr 01, 2026 Intimation regarding COD and Transfer of Coal Mine to NTPC Mining Ltd. View/Download
May 29, 2026 Declaration of Commercial Operation of second part capacity of 34.4 MW out of 176 MW capacity of NTPC’s Solar PV Project at Ramagundam. View/Download
May 29, 2026 Intimation regarding Change in Senior Management- Cessation. View/Download
Mar 31, 2026 Declaration of COD of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NTPC Green Energy Limited as follows:

The twelfth and the last part capacity of 78.02 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat, w.e.f. 31st March 2026.

The sixth part capacity of 90 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat, 31st March 2026.
View/Download
Mar 30, 2026 Intimation regarding Change in the Senior Management- Cessation. View/Download
Mar 28, 2026 Disclosure regarding approval of following at Board Meeting held on 28.03.2026

1.Investment proposal for Battery Energy Storage System
2.Additional equity commitment of Rs 3,173.67 Crore in Meja Urja Nigam Private Limited.
View/Download
Mar 28, 2026 Declaration of COD of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NTPC Green Energy Limited as follows:

i.Third and last part capacity of 75 MW out of 500 MW Bhadla Solar PV Project located in Phalodi, Rajasthan, w.e.f. 25th March 2026.


ii.Fifth part capacity of 105 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat w.e.f. 29th March 2026.
View/Download
Mar 26, 2026 Intimation of ESG rating by MSCI ESG Ratings. View/Download
Mar 24, 2026 Intimation of ESG rating by ESG Risk Assessments & Insights Limited. View/Download
Mar 23, 2026 Intimation regarding Trading Window Closure for the quarter ending 31st March 2026. View/Download
Mar 19, 2026 Press Release titled signing of MoU between NTPC Limited and Octopus Energy Group. View/Download
Mar 19, 2026 Declaration of COD of fourth part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. View/Download
Mar 10, 2026 Declaration of COD of second part capacity of 91.6 MW out of 250 MW Solar PV Project located in Andhra Pradesh by a group company of NGEL. View/Download
Mar 10, 2026 Declaration of COD of third part capacity of 270 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited through NGEL. View/Download
Feb 28, 2026 Notice from the Stock Exchange for the quarter ended 31.12.2025.
View/Download
Feb 27, 2026 Intimation regarding Change in the Senior Management- Cessation. View/Download
Feb 27, 2026 Intimation regarding receipt of the order from the Additional Commissioner CGST & Central Excise, Patna-1, of Bihar state. View/Download
Feb 26, 2026 Declaration of COD of first part capacity of 50 MW out of 200 MW Dayapar Wind Energy Project Phase-II of NTPC Renewable Energy Limited. View/Download
Feb 26, 2026 Press Release titled signing of MoUs between NTPC and Gujarat Mineral Development Corporation Limited (GMDC). View/Download
Feb 25, 2026 Completion of acquisition of Sinnar Thermal Power Limited by Consortium of NTPC Ltd and Maharashtra State Power Generation Company Limited (MAHAGENCO) on 24th February 2026. View/Download
Feb 20, 2026 Declaration of COD of second part capacity of 165 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited. View/Download
Feb 20, 2026 Declaration of COD of part capacity of 158.4 MW out of 250 MW Solar PV Project located in Andhra Pradesh, by a group company of NTPC Green Energy Limited. View/Download
Feb 18, 2026 Intimation regarding waiver of fine levied under of SEBI (LODR) Regulations, 2015. View/Download
Feb 17, 2026 Intimation of Credit Rating by India Ratings and Research Pvt. Ltd. View/Download
Feb 16, 2026 Declaration of Commercial Operation of additional 5 MW capacity of Maroda reservoir-I solar power project of NSPCL. View/Download
Feb 09, 2026 Declaration of COD of eleventh part capacity of 14.43 MW out of 1255 MW Khavda-I Solar PV Project under CPSU scheme Phase-II Tranche-III of NTPC Renewable Energy Limited. View/Download
Feb 07, 2026 Pursuant to SEBI Circular No. HO/38/13/11(2)2026-MIRSD-POD/ I/3750/2026 dated 30th January 2026, please find attached copies of Newspaper clippings containing the notice published by the Company dated 7th February 2026. View/Download
Feb 04, 2026 Declaration of COD of second part capacity of 125 MW out of 500 MW Bhadla Solar PV Project of NTPC Renewable Energy Limited. View/Download
Feb 01, 2026 Transfer of Coal Mines of NTPC Limited to NTPC Mining Limited w.e.f. 1st February 2026. View/Download
Jan 31, 2026 Transfer of Coal Mines of NTPC Limited to NTPC Mining Limited View/Download
Jan 30, 2026 Outcome of Meeting of the Board of Directors regarding Office Memorandum dated 16th January 2026 received from Ministry of Power, Government of India pertaining to PTC India Limited. View/Download
Jan 30, 2026 Declaration of COD of first part capacity of 210 MW out of 1200 MW Khavda-II Solar PV Project of NTPC Renewable Energy Limited. View/Download
Jan 29, 2026 Intimation regarding Change in the Senior Management- Cessation. View/Download
Jan 28, 2026 Declaration of COD of tenth part capacity of 130.47 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited View/Download
Jan 23, 2026 Details of conference call to be held on 30th January 2026 to discuss the Company’s results for the quarter, and nine months ended 31st December 2025 with the Analysts and Investors . View/Download
Jan 23, 2026 Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation View/Download
Jan 22, 2026 Corporate Action-Board to consider Dividend View/Download
Jan 22, 2026 Board Meeting Intimation for Unaudited Results for the Quarter and Nine Months Ended 31St December, 2025 and Declaration of Second Interim Dividend for the Financial Year 2025-26. View/Download
Jan 22, 2026 Closure of Trading Window View/Download
Jan 16, 2026 Declaration of COD of third part capacity of 37.5 MW Solar, by a group company of NTPC Green Energy Limited, w.e.f. 17th January 2026 View/Download
Jan 15, 2026 Declaration of COD of First part Capacity of 300MW out of 500MW Bhadla Solar PV Project in Rajasthan of NTPC Renewable Energy Limited. View/Download
Jan 13, 2026 Confirmation Certificate in the matter of Regulation 74(5) of Securities and Exchange Board of India (Depositories and Participants) Regulations, 2018. View/Download
Jan 09, 2026 Intimation of execution of Shareholder Agreement between Maharashtra State Power Generation Company Limited and NTPC Limited on 9th January 2026. View/Download
Jan 08, 2026 Amendment to the Code of Practices and Procedures for Fair Disclosure of Unpublished Price Sensitive Information of NTPC CODE OF PRACTICES AND PROCEDURES FOR FAIR DISCLOSURE OF UNPUBLISHED PRICE SENSITIVE INFORMATION View/Download
Jan 02, 2026 Rumour Verification Letter View/Download
Dec 31, 2025 Change in Senior Management due to superannuation w.e.f. 31.12.2025 View/Download
Dec 30, 2025 Declaration of COD of Ninth Part Capacity of 13.98 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited View/Download
Dec 24, 2025 Declaration of COD of the Eighth Part Capacity of 69.04 MW out of 1255 MW Khavda-I Solar PV Project located in Gujarat under CPSU Scheme Phase-II Tranche-III of NTPC Renewable Energy Limited View/Download
Dec 24, 2025 Declaration of Commercial Operation of second & last part capacity of 13 MW out of 23 MW of Solapur Solar PV Project at NTPC Solapur View/Download
Dec 24, 2025 Intimation regarding closure of trading window for declaration of financial results for the quarter and nine months ending on 31.12.2025. View/Download
Dec 23, 2025 Formation of Joint Venture Company with EDF Power Solutions of India Private Limited and formation of a Wholly-Owned Subsidiary in Mauritius View/Download
Dec 17, 2025 Declaration of COD of the fifth part capacity of 37.925 MW out of 300 MW Khavda Solar Energy Project under 450 MW Hybrid Tranche V Project in Gujarat of NTPC Renewable Energy Limited View/Download
Dec 17, 2025 Intimation regarding receipt of the order from the Assistant Commissioner State Tax, Delhi View/Download
Dec 17, 2025 Declaration of Commercial Operation of Second & Last Part Capacity of 78 MW out of 245 MW at Plot-1 of NTPC'S Nokh Solar PV Project (3X245 MW) under CPSU Scheme Phase-II, Tranche -II View/Download
Dec 17, 2025 Declaration of COD of Part Capacity of 243.66 MW out of 1255 MW Khavda-I Solar PV Project under CPSU Scheme Phase-II Tranche-III in Gujarat of NTPC Renewable Energy Limited View/Download
Dec 11, 2025 Declaration of COD of Unit III (250 MW) of Tehri PSP (4X250 MW) of THDC India Limited View/Download
Dec 10, 2025 Declaration of COD of Part Capacity of 6.6 MW (Wind) by a Group Company of our Subsidiary NTPC Green Energy Limited View/Download
Dec 09, 2025 Intimation of ESG Rating by NSE Sustainability View/Download
Dec 05, 2025 Intimation of incorporation of subsidiary & joint venture company namely “Chhattisgarh NTPC Green Energy Limited” of NTPC Green Energy Limited (a wholly-owned subsidiary of NTPC) View/Download
Dec 03, 2025 Newspaper publication regarding transfer of equity shares to IEPF. View/Download
Dec 01, 2025 Disclosure regarding transfer of Kerandari Coal Mine from NTPC to NTPC Mining Limited (NML) w.e.f. 1st December 2025. View/Download
Nov 29, 2025 Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors View/Download
Nov 28, 2025 Intimation of NCLT Approval on Resolution Plan Submitted by Consortium of NTPC And MAHAGENCO in CIRP of Sinnar Thermal Power Limited. View/Download
Nov 19, 2025 Declaration of COD of Part Capacity of 75.50 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited View/Download
Nov 12, 2025 Upgradation of NTPC Limited's ESG rating from CCC to B View/Download
Nov 10, 2025 Newspaper publication regarding special window for re-lodgement of transfer requests of physical securities of NTPC Limited View/Download
Nov 06, 2025 Transcript of Conference Call held with Analysts and Investors on 30 October 2025 View/Download
Nov 04, 2025 Declaration of COD of Unit#1 (800 MW) of Patratu STPP, Phase-I (3x800 MW) of Patratu Vidyut Utpadan Nigam Limited (PVUNL) View/Download
Oct 31, 2025 Change in Senior Management due to superannuation on 31.10.2025 View/Download
Oct 30, 2025 Link for Audio Recording of conference call held with Analysts & Investors on 30 October 2025 View/Download
Oct 30, 2025 Submission Of Unaudited Financial Results for The Quarter and Half Year Ended 30 September 2025 and Declaration of First Interim Dividend View/Download
Oct 30, 2025 Operational & Financial Snapshot of the Company for the Quarter and Half Year ended 30 September 2025 View/Download
Oct 29, 2025 Categorization of NTPC’s Wholly owned Subsidiary namely NTPC Green Energy Limited as a Schedule A Central Public Sector Undertaking (CPSE) by the Government of India View/Download
Oct 29, 2025 Clarification on ESG Rating given by M/s SES ESG Research Private Limited without engagement View/Download
Oct 27, 2025 Intimation of conference call/Analyst Investor meet View/Download
Oct 27, 2025 Details of conference call to be held on 30th October 2025 to discuss the Company’s results for the quarter, and half year ended 30th September 2025 with the Analysts and Investors . View/Download
Oct 25, 2025 Completion of Trial Operation of Unit -1 (800 MW) Of Patratu Super Thermal Power Project, Stage-1(3X800mw) View/Download
Oct 24, 2025 Declaration of COD of Part Capacity Of 9.9 MW (Wind) by a Group Company of NTPC’s Subsidiary i.e. NTPC Green Energy Limited View/Download
Oct 24, 2025 Intimation of fixation of record date for the purpose of ascertaining eligibility of shareholders for the payment of Interim Dividend, if declared View/Download
Oct 24, 2025 a) Intimation regarding holding of Meeting of the Board of Directors to consider: Un-audited Financial Results for the quarter and half year ended 30th September 2025 - Declaration of interim dividend for the Financial Year 2025-26, if any
b) Intimation regarding fixation of record date for payment of interim dividend for the Financial Year 2025-26, if any
c) Intimation regarding Closure of Trading Window
View/Download
Oct 24, 2025 Intimation of closure of Trading Window from 1st October 2025 till 1st November 2025. View/Download
Oct 19, 2025 Declaration of COD of the fourth part Capacity of 37.95 MW out of 300 MW Khavda Solar Energy Project of NTPC Renewable Energy Limited View/Download
Oct 17, 2025 Declaration of COD of Part Capacity of 95.75 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited View/Download
Oct 16, 2025 Declaration of COD of Part Capacity Of 12.5 MW (Solar) by a Group Company of our Subsidiary NTPC Green Energy Limited w.e.f. 17.10.2025 View/Download
Oct 13, 2025 Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011 View/Download
Oct 09, 2025 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 for the quarter ended 30.09.2025 View/Download
Oct 09, 2025 Press release titled “NTPC and Govt of Gujarat Join Hands to Explore Opportunities in Energy Sector” View/Download
Oct 01, 2025 Disclosure regarding transfer of two Coal blocks/mines to NTPC Mining Limited View/Download
Sep 30, 2025 Change in Senior Management due to superannuation on 30.09.2025 View/Download
Sep 26, 2025 Disclosure regarding approval of following at Board Meeting held on 26.09.2025: (i) Equity infusion in NEEPCO (ii) Proposal for setting of MSW to Torrefied Charcoal Facility by APCPL. View/Download
Sep 26, 2025 Declaration of COD of Part Capacity of 25 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited View/Download
Sep 26, 2025 Disclosure regarding Revised Cost Estimate of North Karanpura Super Thermal Power Project (3X660 MW View/Download
Sep 25, 2025 Declaration of Commercial Operation of 167 MW Out Of 245 MW At Plot-1 of NTPC's Nokh Solar PV Project (3X245 MW) Under CPSU Scheme Phase-II, Tranche -IIl View/Download
Sep 24, 2025 Declaration of COD of Part Capacity Of 9.9 MW (Wind) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited View/Download
Sep 24, 2025 Declaration of COD Of Unit II (660 MW) Of Khurja STPP (2X660 MW) Of THDC India Limited. View/Download
Sep 24, 2025 Intimation regarding closure of Trading Window for declaration of financial results for Q2 of FY 2025-26 View/Download
Sep 22, 2025 Disclosure regarding order received from Principal Commissioner Central Tax Visakhapatnam of Andhra Pradesh View/Download
Sep 16, 2025 Declaration of COD of Part Capacity of 100 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited View/Download
Sep 11, 2025 Newspaper publication regarding special window for re-lodgement of transfer requests of physical securities of NTPC Limited View/Download
Sep 10, 2025 Appointment of Statutory Auditor by Comptroller & Auditor General of India for the Financial Year 2025-26 (same as Financial Year 2023-24 and 2024-25) View/Download
Sep 04, 2025 Disclosure regarding discontinuation of operations of Tanda Thermal Power Station, Stage-I (4X110 MW) View/Download
Sep 02, 2025 Voting Results (in searchable mode) of 49th AGM View/Download
Sep 02, 2025 Declaration of COD of Part Capacity of 25 MW (Solar) by a Group Company of NTPC’s Subsidiary namely NTPC Green Energy Limited w.e.f. 03.09.2025 View/Download
Sep 01, 2025 Voting Results and Scrutinizer''s Report of 49th Annual General Meeting of NTPC Limited held on 29th August 2025. View/Download
Aug 30, 2025 Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors and Board level Committees View/Download
Aug 29, 2025 Proceedings of 49th Annual General Meeting of the Company held on 29th August 2025. View/Download
Aug 29, 2025 Change in Senior Management due to superannuation on 31.08.2025 View/Download
Aug 28, 2025 Disclosure regarding Board approval on a partial modification regarding the transfer of its coal mining business to its wholly owned subsidiary, NTPC Mining Limited (NML) View/Download
Aug 28, 2025 Disclosure regarding Board approval on Revised Cost Estimate-I (RCE-I) of Rammam-III HEPP (3 x 40 MW) View/Download
Aug 25, 2025 Transcript of Annual Analysts & Institutional Investors Meet held on 18 August 2025 View/Download
Aug 24, 2025 Declaration of COD of the part capacity of 50 MW (Solar) by a Group Company of NTPC’s subsidiary namely NTPC Green Energy Limited w.e.f. 24.08.2025 View/Download
Aug 22, 2025 Disclosure dated 21.08.2025 made by NTPC’s Subsidiary NTPC Green Energy Limited regarding declaration of COD of the third part capacity of 49.125 MW out of 300 MW Khavda Solar Energy Project View/Download
Aug 20, 2025 Disclosure dated 19.08.2025 made by NTPC’s subsidiary NTPC Green Energy Limited View/Download
Aug 18, 2025 Investor Presentation proposed to be made at the 21st Annual Analysts and Institutional Investors Meet of NTPC Limited on 18 August 2025 View/Download
Aug 18, 2025 Link for accessing Audio Recording of 21st Annual Analyst and Institutional Investors meet. View/Download
Aug 13, 2025 Newspaper publication regarding change in time of 49th Annual General Meeting View/Download
Aug 13, 2025 Intimation regarding Cabinet approval on Investment Proposal for construction of 700 MW Tato-II Hydro Electric Project in Shi Yomi District of Arunachal Pradesh with an outlay of Rs. 8146.21 crore and completion period of 72 months. View/Download
Aug 12, 2025 Intimation regarding change in time of the 49th Annual General Meeting View/Download
Aug 08, 2025 Newspaper publication regarding Notice of 49th Annual General Meeting is enclosed. View/Download
Aug 08, 2025 Hosting its 21st Annual Analysts and Institutional Investors Meet on 18 August 2025 in Mumbai View/Download
Aug 07, 2025 Submission of Integrated Annual Report for Financial Year 2024-25 View/Download
Aug 07, 2025 Business Responsibility and Sustainability Report for Financial Year 2024-25 View/Download
Aug 07, 2025 Notice of 49th Annual General Meeting View/Download
Aug 05, 2025 Disclosures dated 04.08.2025 made by NTPC’s subsidiary namely NTPC Green Energy Limited View/Download
Aug 01, 2025 Newspaper Advertisement- Disclosure under Regulation 30 and Regulation 47 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015. View/Download
Jul 31, 2025 Declaration of COD of the third part capacity of 6 MW out of 150 MW Dayapar Wind Energy Project (Phase-I) of NTPC Renewable Energy Limited (NTPC REL) View/Download
Jul 31, 2025 Change in Senior Management due to superannuation on 31.07.2025 View/Download
Jul 29, 2025 Intimation of Record Date (i.e. 4th September 2025) for the purpose of Final Dividend for FY 2024-25 View/Download
Jul 29, 2025 Change in Directorate View/Download
Jul 29, 2025 Board Meeting Outcome regarding
1. Re-appointment of Shri Gurdeep Singh (DIN: 00307037) as Chairman & Managing Director of NTPC Limited
2. Appointment of Secretarial Auditor
View/Download
Jul 29, 2025 Appointment of M/s Agarwal S. & Associates, Company Secretaries (FRN No.: P2003DE49100) as Secretarial Auditor of the Company for a period of five years i.e. from the Financial Year 2025-26 to 2029-30 subject to approval of shareholders at ensuing Annual General Meeting. View/Download
Jul 29, 2025 Board Meeting Outcome for Integrated Filing (Financials) - Submission of Unaudited Financial Results for The Quarter Ended 30 June 2025. View/Download
Jul 29, 2025 Operational and Financial Snapshot for the Quarter Ended 30 June 2025. View/Download
Jul 29, 2025 Intimation of the date of 49th Annual General Meeting (i.e.29th August 2025) of the Company and record date (i.e. 4th September 2025) for the purpose of Final Dividend for the FY 2024-25 View/Download
Jul 29, 2025 Integrated Filing (Financials) - Submission Of Unaudited Financial Results for the Quarter Ended 30 June 2025. View/Download
Jul 24, 2025 Outcome of Postal Ballot-Voting Results & Scrutinizer Report View/Download
Jul 23, 2025 Closure of Trading Window for the quarter ended 30.06.2025 View/Download
Jul 23, 2025 Board Meeting Intimation for Considering Un-Audited Financial Results for the Quarter Ended 30th June 2025 View/Download
Jul 22, 2025 Newspaper publication regrading transfer of Equity Shares to the IEPF View/Download
Jul 18, 2025 Intimation regarding re-employment of the Chairman & Managing Director View/Download
Jul 17, 2025 Announcement under Regulation 30 (LODR)-Newspaper Publication View/Download
Jul 17, 2025 Intimation regarding Cabinet approval accorded for enhanced delegation of Power to NTPC Limited for investment in NTPC Green Energy Limited, a subsidiary company, for Renewable Energy Capacity addition View/Download
Jul 16, 2025 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 View/Download
Jul 08, 2025 Declaration of COD of Unit II (250 MW) of Tehri PSP (4X250 MW) of THDC India Limited View/Download
Jul 08, 2025 Change in Senior Management on 08.07.2025 due to pre-mature retirement View/Download
Jul 01, 2025 Disclosure dated 30.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the second part capacity of 32.80 MW out of 300 MW Khavda Solar Energy Project and the third part capacity of 64.7 MW out of 1255 MW Khavda-I Solar PV View/Download
Jun 29, 2025 Disclosure dated 28.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the third and last part capacity of 120 MW out of 220 MW Shajapur Solar Project (Unit-II) of NTPC Renewable Energy Limited (NTPC REL) View/Download
Jun 28, 2025 Disclosure dated 27.06.2025 made by NTPC’s subsidiary NTPC Green Energy Limited regarding declaration of COD of the first part capacity of 142.2 MW out of 300 MW Khavda View/Download
Jun 27, 2025 Change in Management on 30.06.2025 due to superannuation View/Download
Jun 26, 2025 Declaration of COD of Unit#3 (660 MW) of Barh Super Thermal Power Project, Stage-I (3X660 MW) View/Download
Jun 24, 2025 Closure of Trading Window for Q1 FY 2025-26 View/Download
Jun 23, 2025 Notice of Postal Ballot for issue of secured/unsecured, redeemable, taxable/tax-free, cumulative/non-cumulative, non-convertible debentures up to Rs. 18,000 Crore View/Download
Jun 22, 2025 Declaration of COD of Second & Last Part Capacity of 52 MW out of 245 MW at plot-3 of NTPC's Nokh Solar PV Project (3X245 MW) under CPSU Scheme Phase-II, Tranche -III View/Download
Jun 21, 2025 Board Meeting Outcome for for Raising of Funds Through Issue of Non-Convertible Debentures View/Download
Jun 21, 2025 Appointment of Cost Auditors for the Financial Year 2025-26 View/Download
Jun 18, 2025 Change in Senior Management on 18.06.2025 due to pre-mature retirement View/Download
Jun 16, 2025 Change in Senior Management on 16.06.2025 due to pre-mature retirement View/Download
Jun 16, 2025 Board Meeting Intimation for Raising of Funds Through Issue of Non-Convertible Debentures View/Download
Jun 14, 2025 Intimation of approval accorded by Committee of Creditors (CoC) in relation to Resolution Plan submitted by the Consortium of Maharashtra State Power Generation Company Limited and NTPC Limited (“Consortium”) for Sinnar Thermal Power Limited (“STPL”), a company undergoing Corporate Insolvency Resolution Process ("CIRP") under the Insolvency and Bankruptcy Code 2016 ("IBC") View/Download
Jun 13, 2025 Intimation of NTPC’s decision to issue unsecured non-convertible debentures of Rs.4,000 crore on 17.06.2025, through private placement at a coupon of 6.89% p.a. for a tenor of 10 years 1 day, maturing on 18.06.2035 View/Download
Jun 13, 2025 Declaration of COD of Unit-3 (660 MW) of North Karanpura Super Thermal Power Project (3X660mw) View/Download
Jun 12, 2025 Completion of Trial Operation by 660 MW Capacity Unit of BARH Super Thermal Power Project, Stage-1 View/Download
Jun 12, 2025 Completion of Trial Operation by 660 MW Capacity Unit of North Karanpura Super Thermal Power Project View/Download
Jun 09, 2025 Intimation of amendment to the Code for Prevention of Insider Trading in the Securities of NTPC View/Download
Jun 09, 2025 Disclosure regarding ESG rating assigned by NSE Sustainability Ratings & Analytics Ltd (“NSE Sustainability”) to NTPC View/Download
Jun 08, 2025 Declaration of COD of 193 MW out of 245 MW Capacity at Plot-3 of NTPC’s Nokh Solar PV Project (3X245 MW) View/Download
Jun 06, 2025 Declaration of COD of First Part Capacity Of 110.25 MW Out Of 1255 MW Khavda 1 Solar PV Project In Gujarat of NTPC Renewable Energy Limited (NTPC REL), A Stepdown Subsidiary of NTPC Limited through its Subsidiary NTPC Green Energy Limited. View/Download
Jun 06, 2025 Commercial Operation of First Unit of 250 MW of Tehri PSP (4X250 MW) of THDC India Limited, a Subsidiary of NTPC Limited. View/Download
Jun 01, 2025 Change in Senior Management on 31.05.2025 View/Download
May 30, 2025 Notices received from Stock Exchanges regarding imposition of fines due to non-compliance w.r.t. composition of Board of Directors and Board level Committees View/Download
May 29, 2025 Transcript of Conference call held with Analysts & Investors on 24 May 2025. View/Download
May 25, 2025 Correction in disclosure dated 16th May 2025 w.r.t. Shri Pankaj Gupta, Additional Director (Independent Director) View/Download
May 24, 2025 Submission of Audited Financial Results for the Quarter and year ended 31 March 2025. View/Download
May 24, 2025 Integrated Filing (Financial) regarding submission of Audited Financial results for the Quarter and Year ended 31 March 2025. View/Download
May 24, 2025 Board Meeting Outcome for Recommendation of Final Dividend for the Financial Year 2024-25. View/Download
May 24, 2025 Operational & Financial Snapshot of the Company for Quarter and year ended 31 March 2025. View/Download
May 24, 2025 Link for Audio Recording of conference call held with Analysts & Investors on 24 May 2025 View/Download
May 20, 2025 Corporate Disclosure regarding Con Call discussion the Company’s results for Quarter and Year ended March 31, 2025 View/Download
May 20, 2025 Details of conference call to be held on 24th May 2025 to discuss the Company’s results for the quarter, and year ended 31st March 2025 with the Analysts and Investors. View/Download
May 19, 2025 Intimation regarding appointment of Dr. Kanchiappan Ghayathri Devi (alias Dr. K. Ghayathri Devi) (DIN: 07584524) and Shri Sushil Kumar Choudhary (DIN: 11111980) as Additional Directors (Independent Directors) on the Board of NTPC Limited View/Download
May 19, 2025 Board Meeting Intimation for Considering Annual Standalone and Consolidated Financial Statements for the year ended 31st March 2025 and recommendation of Dividend for The Year Ended 31st March 2025, View/Download
May 19, 2025 Closure of trading window from 1st April 2025 shall remain closed till 26th May 2025. View/Download
May 16, 2025 Intimation regarding appointment of Shri Sushil Chaudhari as Independent Director on the Board of NTPC Limited View/Download
May 16, 2025 Submission of Annual Secretarial Compliance Report for the year ended 31st March 2025 View/Download
May 16, 2025 Intimation regarding appointment of Dr. Anil Kumar Gupta (DIN: 00442146) and Shri Pankaj Gupta (DIN: 03415536) as Additional Directors (Independent Directors) on the Board of NTPC Limited View/Download
May 15, 2025 Intimation regarding appointment of Dr. K. Ghayathri Devi, Dr. Anil Kumar Gupta and Shri Pankaj Gupta as Independent Director on the Board of NTPC Limited View/Download
May 07, 2025 Intimation regarding NTPC’s decision to Issue Unsecured Non-Convertible Debentures of Rs.4,000 Crore on 09.05.2025, through Private Placement at a Coupon of 6.84% P.A. for a tenor of 10 Years, maturing on 09.05.2035. View/Download
May 02, 2025 Declaration of COD of third and last part capacity of 60 MW out of 150 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL), a stepdown subsidiary of NTPC Limited through its subsidiary NTPC Green Energy Limited. View/Download
May 01, 2025 Declaration of COD of 75 MW capacity by a group company of NTPC’s subsidiary NTPC Green Energy Limited w.e.f. 00:00 Hrs. of 02.05.2025 View/Download
Apr 17, 2025 Intimation of the appointment of Shri Anil Kumar Trigunayat (DIN: 07900294), as an Additional Director (Independent Director) on the Board of the Company View/Download
Apr 08, 2025 Declaration of COD of second part capacity of 90 MW out of 150 MW Dayapar Wind Energy Project Phase-I of NTPC Renewable Energy Limited (NTPC REL) View/Download
Apr 08, 2025 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for quarter ended 31st March 2025 View/Download
Apr 02, 2025 Cautionary Notices received from Stock Exchanges View/Download
Apr 01, 2025 Change in Senior Management due to superannuation on 31.03.2025 View/Download
Mar 28, 2025 Disclosure regarding acquisition of Ayana Renewable Power Private Limited by ONGC NTPC Green Private Limited View/Download
Mar 27, 2025 Closure of trading window for year/quarter ended 31.03.2025 View/Download
Mar 26, 2025 Declaration of COD of 245 MW Capacity of NTPC’s Nokh Solar PV Project (3X245 MW) View/Download
Mar 25, 2025 Declaration of COD of the third & last part capacity of 100 MW out of 320 MW Bhainsara Solar PV Project of NTPC Renewable Energy Limited View/Download
Mar 24, 2025 Declaration of Commercial Operation of Kerandari Coal Mining Project (KDCMP) View/Download
Mar 18, 2025 Intimation of NTPC’s decision to issue Unsecured Non-Convertible Debentures of Rs.4,000 Crore on 20.03.2025, through Private Placement at a coupon of 7.26% P.A. for a tenor of 15 Years, maturing on 20.03.2040 View/Download
Mar 18, 2025 Intimation of notices received from Stock Exchanges regarding fines imposed due to non-compliance regarding composition of Board of NTPC View/Download
Mar 12, 2025 Declaration of COD of second & last part capacity of 50 MW out of 105 MW Shajapur Solar Project (Unit-I) of NTPC Renewable Energy Limited (NTPC REL) View/Download
Mar 10, 2025 Intimation of press release titled “NTPC Group to invest Rs. 96,000 Crore in Chhattisgarh” View/Download
Mar 10, 2025 Change in Senior Management w.e.f. 10.03.2025 View/Download
Mar 04, 2025 Change in Senior Management w.e.f. 03.03.2025 due to appointment of Executive Directors View/Download
Mar 04, 2025 Change in Senior Management w.e.f. 03.03.2025 View/Download
Mar 01, 2025 Declaration of COD of fourth and last part capacity of 18.32 MW out of 300 MW Shambu Ki Burj -2 Solar PV Project of NTPC Green Energy Limited (NGEL) View/Download
Mar 01, 2025 Appointment of Secretarial Auditor for the Financial Year 2024-25 View/Download
Mar 01, 2025 Change in Senior Management w.e.f. 01.03.2025 View/Download
Feb 26, 2025 Intimation of order from the Deputy Commissioner of State Tax, LAKADGANJ 501, Nagpur of Maharashtra State Under CGST Act 2017 View/Download
Feb 24, 2025 Amended Code for Prevention of Insider Trading in the securities of NTPC View/Download
Feb 24, 2025 Intimation of Press Release titled “NTPC Group inks MOUs with Govt. of MP at Global Investors Summit, set to invest over Rs 2 Lakh Crore in MP” View/Download
Feb 23, 2025 Intimation of Press Release titled “NTPC, EDF to Collaborate on Pumped Storage, Hydro Projects & RE Opportunities” View/Download
Feb 12, 2025 Intimation of signing of Share Purchase Agreement for acquisition of 'Ayana Renewable Power Private Limited' by ONGC NTPC Green (P) Ltd., a JV of NTPC Green Energy Limited (A Subsidiary of NTPC Limited) View/Download
Feb 04, 2025 Outcome of Litigation View/Download
Feb 01, 2025 Change in Senior Management due to superannuation w.e.f. 31st January 2025 View/Download
Jan 30, 2025 Transcript of Conference Call held with Analysts and Investors on 25th January 2025 View/Download
Jan 29, 2025 Order from the Superintendent (Adjudication), CGST, Central Excise, Faizabad of UP State View/Download
Jan 26, 2025 Intimation of Senior Management Officials designated as KMP View/Download
Jan 25, 2025 Declaration of COD of Unit 1 (660 MW) of Khurja STPP (2X660 MW) of THDC India Limited (a subsidiary of NTPC Limited) View/Download
Jan 25, 2025 Submission Of Unaudited Financial Results for the Quarter and Nine-Months Ended 31 December 2024. View/Download
Jan 25, 2025 Declaration of Second Interim Dividend for the Financial Year 2024-25. View/Download
Jan 25, 2025 Intimation of Senior Management Officials designated as Key Managerial Personnel View/Download
Jan 25, 2025 Key Performance Highlights of NTPC Limited for the Quarter Ended December 31, 2024. View/Download
Jan 25, 2025 Integrated Filing (Financial) regarding Financial results for Quarter and nine-months ended 31 December 2024. View/Download
Jan 25, 2025 Intimation of Record Date for Second Interim Dividend for the Financial Year 2024-25 View/Download
Jan 25, 2025 Link for Audio Recording of conference call held with Analysts & Investors on 25 October 2024. View/Download
Jan 21, 2025 NTPC Limited will hold a conference call for analysts and investors at 05:00 PM IST on January 25, 2025, wherein the Senior Management team of NTPC Limited comprising of Mr. Jaikumar Srinivasan – Director (Finance), Mr. Shivam Srivastava – Director (Fuel), Mr. K. Shanmugha Sundaram – Director (Projects), Mr. Ravindra Kumar – Director (Operations) and Mr. Anil Kumar Jadli – Director (HR) will discuss the Company’s results for the 3rd quarter of financial year 2024-25 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:



Primary Number/Secondary

+ 91 22 6280 1259

+ 91 22 7115 8160

The numbers listed above are universally accessible from all networks and all countries



Toll-free number

USA

1 866 746 2133

UK

0 808 101 1573

Hong Kong

800 964 448

Singapore

800 101 2045

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=8105325&linkSecurityString=377078492d


Recording and transcript of the conference call will be available on the Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mr. Apoorva Bahadur | 91 90046 98700 | apoorva.bahadur@iiflcap.com



Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email:adityadar@ntpc.co.in
View
Jan 21, 2025 Closure of Trading Window which was closed from 1st January 2025 shall remain closed till 27th January 2025 View/Download
Jan 21, 2025 Intimation regarding holding of Meeting of the Board of Directors to consider:

· Un-audited Financial Results for the quarter and Nine-months ended 31st December 2024
· Declaration of second interim dividend for the Financial Year 2024-25, if any.
· Intimation regarding Closure of Trading Window
View/Download
Jan 21, 2025 Intimation of conference call on January 25, 2025 for discussion w.r.t the Company’s results for Q3 FY25 and interact with the Analysts and Investors View/Download
Jan 20, 2025 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for the quarter ended 31st December 2024. View/Download
Jan 20, 2025 Declaration of COD of Second Part Capacity of 25 MW Out of 200 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Jan 10, 2025 Declaration of COD of second part capacity of 60 MW out of 320 MW Bhainsara Solar PV Project in Jaisalmer, Rajasthan and second part capacity of 50 MW out of 220 MW Shajapur Solar Project (Unit-II) at Shajapur, M.P. of NTPC Renewable Energy Limited (NTPC REL) View/Download
Jan 09, 2025 Intimation of Supplementary Joint Venture Agreement-2 (SJVA-2) With Nuclear Power Corporation of India Limited View/Download
Jan 07, 2025 Intimation of incorporation of Wholly Owned Subsidiary 'NTPC PARMANU URJA NIGAM LIMITED' View/Download
Jan 01, 2025 Change in Senior Management due to superannuation on 31.12.2024 View/Download
Jan 01, 2025 Intimation of an order from the Assistant Commissioner, CGST and Central Excise, Patna Central Division of Bihar state for the payment of Tax, Interest and penalty under CGST Act 2017 View/Download
Dec 27, 2024 Declaration of COD of first part capacity of 37.50 MW out of 200 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Dec 23, 2024 Intimation regarding Trading Window Closure for NTPC Shares for the quarter ending 31.12.2024, pursuant to SEBI(PIT) Regulations,2015 and Clause 9 of PIT Code of NTPC View/Download
Dec 19, 2024 Declaration of COD of second part capacity of 30 MW out of 150 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Dec 04, 2024 Newspaper publication regarding transfer of Equity Shares of the Company to Investor Education and protection Fund View/Download
Dec 01, 2024 Change in Management due to superannuation on 30.11.2024 View/Download
Nov 28, 2024 Declaration of COD of first part capacity of 55 MW out of 105 MW Shajapur Solar Project (Unit-1) of NTPC Renewable Energy Limited (NTPC REL) View/Download
Nov 26, 2024 Incorporation of a Joint Venture Company "MAHAGENCO NTPC Green Energy Private Limited" by NTPC Green Energy Limited (NGEL) and Maharashtra State Power Generation Company Limited (MAHAGENCO) View/Download
Nov 26, 2024 Intimation of Press Release regarding MoU signed MOU signed between NTPC Green Energy Limited (NGEL) and Chhattisgarh State Power Generation Company Limited (CSPGCL) for development of renewable projects. View/Download
Nov 22, 2024 Board Comments on fine levied by the Stock Exchanges due to non-compliance of composition of Board of NTPC View/Download
Nov 22, 2024 Intimation of fines levied by the Stock Exchanges due to non-compliance of composition of Board of NTPC View/Download
Nov 18, 2024 Incorporation of a Joint Venture Company namely ONGC NTPC Green Private Limited by NTPC Green Energy Limited (NGEL) and ONGC Green Limited (OGL) View/Download
Nov 12, 2024 Change in Directorate due to completion of tenure of Independent Directors on 11.11.2024 View/Download
Nov 05, 2024 Intimation regarding investment approval by NTPC’s Board for Telangana Super Thermal Power Project, Phase-II (3X800 MW) View/Download
Nov 05, 2024 Intimation regarding investment approval by NTPC’s Board for Gadarwara Super Thermal Power Project, Stage-II (2X800 MW) View/Download
Nov 05, 2024 Intimation regarding investment approval by NTPC’s Board for Nabinagar Super Thermal Power Project, StageII (3x800 MW) View/Download
Nov 05, 2024 Intimation of signing a Joint Venture Agreement by NTPC with Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL) for Chhabra Thermal Power Plant on 04.11.2024 View/Download
Nov 01, 2024 Change in Senior Management due to superannuation on 31.10.2024 View/Download
Nov 01, 2024 Transcript of conference call held with Analysts and Investors on 25 October 2024 View/Download
Oct 29, 2024 Declaration of COD of third part capacity of 32.90 MW out of 300 MW Shambu Ki Burj -2 Solar PV Project of NTPC Green Energy Limited (NGEL) View/Download
Oct 25, 2024 Outcome of conference call was held on 25 October 2024 View/Download
Oct 25, 2024 Newspaper Publication regarding intimation of Record Date View/Download
Oct 24, 2024 With reference our earlier intimation letter dated 21st October 2024, Conference Call is now rescheduled to Friday, 25th October, 2024 View/Download
Oct 24, 2024 Board Meeting Outcome for Declaration of First Interim Dividend for The Financial Year 2024-25 View/Download
Oct 24, 2024 Submission Of Unaudited Financial Results for The Quarter and Half-Year Ended 30 September 2024 View/Download
Oct 24, 2024 Key Performance Highlights of NTPC Limited for The Quarter and Half Year Ended September 30, 2024 View/Download
Oct 21, 2024 NTPC Limited will hold a conference call for analysts and investors at 01:00 PM IST on Oct 24, 2024, wherein the Senior Management team of NTPC Limited comprising of Mr. Jaikumar Srinivasan – Director (Finance), Mr. Shivam Srivastava – Director (Fuel), Mr. K. Shanmugha Sundaram – Director (Projects), Mr. Ravindra Kumar – Director (Operations) and Mr. Anil Kumar Jadli – Director (HR) will discuss the Company’s results for the 2nd quarter of financial year 2024-25 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:



Primary Number/Secondary

+ 91 22 6280 1366

+ 91 22 7115 8267

The numbers listed above are universally accessible from all networks and all countries



Toll-free number

USA

1 866 746 2133

UK

0 808 101 1573

Hong Kong

800 964 448

Singapore

800 101 2045

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=7893860&linkSecurityString=34291821f0


Recording and transcript of the conference call will be available on the Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mr. Sudhanshu Bansal | +91-99106 93618 | sudhanshu.bansal@jmfl.com
Mr. Krishnakant Phafat | +91-91756 01111 | krishnakant.phafat@jmfl.com
Ms. Lorraine Gomes | +91-98218 33479 |lorraine.Gomes@jmfl.com


Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email:adityadar@ntpc.co.in
View
Oct 21, 2024 Scheduling of the conference call on October 24, 2024 View/Download
Oct 19, 2024 Trading window which was closed from 1st October 2024 shall remain closed till 26th October 2024 View/Download
Oct 19, 2024 Board Meeting Intimation for Unaudited Financial Results for the Quarter and Half Year ended 30th September 2024 and Declaration of Interim Dividend for the Financial Year 2024-25, If Any. View/Download
Oct 19, 2024 Board to consider Dividend View/Download
Oct 18, 2024 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for the quarter ended 30th September, 2024 View/Download
Oct 08, 2024 Intimation of an order from the Additional Commissioner, Central Tax and Central Excise, Delhi East of Delhi state for the payment of Tax, Interest and penalty under Finance Act 1994. View/Download
Oct 07, 2024 Status of investors complaints/grievances for the quarter ending 30.09.2024. View/Download
Oct 01, 2024 Intimation regarding re-appointment of Statutory Auditors for the Financial Year 2024-25 View/Download
Oct 01, 2024 Change in Senior Management due to superannuation on 30.09.2024 View/Download
Oct 01, 2024 Declaration of COD of first part capacity of 50 MW out of 220 MW Shajapur Solar Project of NTPC Renewable Energy Limited (NTPC REL) and COD of second part capacity of 98.78 MW out of 300 MW Shambu Ki Burj -2 Solar PV Project of NTPC Green Energy Limited (NGEL) View/Download
Sep 30, 2024 Intimation of Press Release titled "NGEL Signs MoU with Govt of Rajasthan for development of 25 GW of RE Projects" View/Download
Sep 26, 2024 Intimation of order received from the State Tax Officer, GST State Tax, Khand-8, Noida, Gautam Buddha Nagar Dist. of Uttar Pradesh State under Goods and Service Tax Laws View/Download
Sep 26, 2024 Intimation of Press Release titled " NGEL Inks JV Agreement with MAHAPREIT for Development of 10 GW RE Projects" View/Download
Sep 25, 2024 Closure of Trading Window for the quarter ended 30th September 2024. View/Download
Sep 19, 2024 Intimation regarding investment approval by NTPC’s Board for Darlipali Super Thermal Power Project, Stage-II (1X800 MW) View/Download
Sep 19, 2024 Intimation regarding investment approval by NTPC’s Board for Sipat Super Thermal Power Project, Stage-III (1X800 MW) View/Download
Sep 19, 2024 Intimation of filing of draft red herring prospectus by NTPC Green Energy Limited (NGEL) View/Download
Sep 16, 2024 Change in Senior Management due to appointment of Head of Internal Audit View/Download
Sep 01, 2024 Change in Senior Management due to superannuation on 31.08.2024 View/Download
Aug 30, 2024 Scrutinizer's Report View/Download
Aug 29, 2024 Intimation of re-appointment of Shri Anil Kumar Jadli (DIN:10630150) as Additional Director (Director (HR)) of NTPC Limited View/Download
Aug 29, 2024 Proceedings of 48th Annual General Meeting held on 29th August, 2024. View/Download
Aug 29, 2024 Declaration of COD of first part capacity of 160 MW out of 320 MW Bhainsara Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Aug 23, 2024 Change in Directorate due to appointment of Shri Anil Kumar Jadli View/Download
Aug 22, 2024 Intimation regarding order from the Joint Commissioner (Corporate Circle), State Tax, Lucknow Zone-2 Of UP State under Goods and Service Tax Laws. View/Download
Aug 22, 2024 Intimation regarding imposition of fines levied by Stock Exchanges due to non-compliance w.r.t. composition of Board of NTPC View/Download
Aug 20, 2024 Intimation regarding additional charge of Director (HR), NTPC Ltd. to Director (Finance), NTPC Ltd. View/Download
Aug 14, 2024 Addendum to the Notice of 48th Annual General Meeting View/Download
Aug 14, 2024 Intimation regarding change in Directorate due to Appointment of Shri Mahabir Prasad, Joint Secretary & Financial Advisor, Ministry of Power as Govt. Nominee Director View/Download
Aug 12, 2024 Intimation of order from Joint Commissioner, CGST and Central Excise, Patna-I of Bihar State under Goods and Service Tax Laws View/Download
Aug 07, 2024 Intimation of Newspaper Publication regarding 48th Annual General Meeting of the Company scheduled to be held on Thursday, 29th August 2024 through VC/OAVM View/Download
Aug 07, 2024 Declaration of COD of first part capacity of 60 MW out of 150 MW Gujarat Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Aug 06, 2024 Notice of 48th Annual General Meeting and Annual Report for the Financial Year 2023-24. View/Download
Aug 06, 2024 Business Responsibility and Sustainability Reporting (BRSR) for Financial Year 2023-24 View/Download
Aug 06, 2024 Reg. 34 (1) Annual Report for FY 2023-24 View/Download
Aug 06, 2024 Intimation of order from Deputy Commissioner (ST), State Special Circle-I, Kunchanapalli, Guntur Dist. Of Andhra Pradesh State, under Goods and Services Tax Laws View/Download
Aug 02, 2024 Transcript of Annual Analysts & Investors Meet Held on 29th July 2024. View/Download
Aug 01, 2024 Intimation of change in Senior Management due to superannuation on 31.07.2024 View/Download
Jul 30, 2024 Declaration of COD of second and last part capacity of 26 MW out of 40 MW Ayodhya Solar PV Project of NTPC Green Energy Limited (A Wholly-owned Subsidiary of NTPC Limited) View/Download
Jul 30, 2024 Outcome of 20th Annual Analysts and Investors Meet of the Company was held on 29th July 2024. View/Download
Jul 30, 2024 Newspaper publication regarding 48th Annual General Meeting of the Company and Record Date View/Download
Jul 29, 2024 Investor Presentation made at the 20th Annual Analysts and Investors Meet of NTPC Limited, held on 29th July 2024 View/Download
Jul 27, 2024 Financial Results for Quarter Ended 30 June 2024 View/Download
Jul 27, 2024 Key Performance Highlights of NTPC Limited for The Quarter Ended June 30, 2024. View/Download
Jul 27, 2024 Intimation of 48th AGM Date and Record Date for Final Dividend for Financial Year 2023-24 View/Download
Jul 27, 2024 Board Meeting Outcome for Quarterly Results for Quarter Ending 30 June 2024 View/Download
Jul 27, 2024 Record Date for the purpose of Final Dividend for The Financial Year 2023-24 View/Download
Jul 24, 2024 Board Meeting Intimation for Considering Un-Audited Financial Results for the Quarter Ended 30th June, 2024 View/Download
Jul 24, 2024 Intimation regarding Order from Deputy Commissioner of State Tax, LAKADGANJ 501, Nagpur, Maharashtra State, under Goods and Services Tax Laws View/Download
Jul 24, 2024 Newspaper Advertisement regarding transfer of Equity Shares of the Company to Investor Education and Protection Fund View/Download
Jul 24, 2024 Intimation of 20th Annual Analysts and Investors Meet View/Download
Jul 24, 2024 Closure of Trading Window View/Download
Jul 19, 2024 Status of investors complaints/grievances for the quarter ending 30.06.2024. View/Download
Jul 09, 2024 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Jul 01, 2024 Change in Senior Management due to Superannuation View/Download
Jun 29, 2024 Board Meeting Outcome for Raising Of Funds Through Issue Of Non-Convertible Debentures View/Download
Jun 26, 2024 Closure of Trading Window. View/Download
Jun 25, 2024 Intimation of Board Meeting for Raising of Funds through Issue of Non-Convertible Debentures View/Download
Jun 17, 2024 Intimation of approval of transfer of shares by National High Power Test Laboratory Pvt. Ltd. from NTPC Limited to Power Grid Corporation of India Limited View/Download
Jun 13, 2024 Information regarding issuance of Duplicate Share Certificate (Letter of Confirmation) View/Download
Jun 06, 2024 Intimation regarding amended Code for Prevention of Insider Trading in the securities of NTPC View/Download
Jun 04, 2024 Intimation regarding loss of Share Certificate(s) View/Download
Jun 01, 2024 Change in Senior Management due to Superannuation View/Download
May 31, 2024 Declaration of COD of second and last part capacity of 33 MW Out of 90 MW Anta Solar PV Project View/Download
May 30, 2024 Compliances - Reg.24(A) - Annual Secretarial Compliance View/Download
May 28, 2024 Announcement under Regulation 30 (LODR)-Earnings Call Transcript for Q4 / FY24 held on 24 May 2024_ Transcript of conference call held with Analysts & Investors on 24 May 2024 View/Download
May 24, 2024 Board Meeting Outcome for Final Dividend for FY 2023-24 View/Download
May 24, 2024 Results March 2024 View/Download
May 24, 2024 Intimation of in-principle approval accorded by Board approval regarding incorporation of a wholly owned subsidiary company for undertaking Nuclear Energy Business View/Download
May 24, 2024 Key Performance Highlights of NTPC Limited for The Quarter and Year Ended March 31, 2024. View/Download
May 24, 2024 Link For Audio Recording Of Conference Call Held With Analysts & Investors On 24 May 2024 View/Download
May 23, 2024 Intimation of fines imposed by stock exchanges due to non-compliance w.r.t. composition of the Board View/Download
May 16, 2024 NTPC Limited will hold a conference call for analysts and investors at 07:00 PM IST on May 24, 2024, wherein the Senior Management team of NTPC Limited comprising of Mr. Jaikumar Srinivasan – Director (Finance), Mr. Shivam Srivastava – Director (Fuel), Mr. K. Shanmugha Sundaram – Director (Projects) and Mr. Ravindra Kumar – Director (Operations) will discuss the Company’s results for the 4th quarter and financial year 2023-24 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:



Primary Number/Secondary

+ 91 22 6280 1123

+ 91 22 7115 8024

The numbers listed above are universally accessible from all networks and all countries



Toll-free number

USA

1 866 746 2133

UK

0 808 101 1573

Hong Kong

800 964 448

Singapore

800 101 2045

Or Express Join with DiamondPass™


Recording and transcript of the conference call will be available on the Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mr. Subhadip Mitra
Nuvama Wealth Management
Email: Subhadip.Mitra@nuvama.com

Regards
Aditya Dar
Executive Director (Finance)
Tel No. 011 2436 7072
Email:isd@ntpc.co.in
View
May 16, 2024 Conference Call on May 24, 2024 for Q4 And FY24 Results View/Download
May 15, 2024 Closure of Trading Window View/Download
May 15, 2024 Board Meeting Intimation for holding of Meeting of the Board of Directors to consider Annual Standalone and Consolidated Financial Statements for the year ended March 31, 2024 and recommendation of dividend for the year ended March 31, 2024 View/Download
May 08, 2024 Intimation of Press Release titled “NTPC Green Energy Limited Inks MoU with Mahatma Phule Renewable Energy and Infrastructure Technology Limited” View/Download
May 02, 2024 Intimation regarding cessation of Shri Dillip Kumar Patel (DIN: 0869590) as Director (HR) of NTPC Limited on 30.04.2024 due to superannuation View/Download
May 02, 2024 Intimation regarding additional charge of Director (HR), NTPC to Director (Finance), NTPC View/Download
May 01, 2024 Change in Senior Management due to Superannuation View/Download
May 01, 2024 Intimation of orders from Assistant Commissioner, Alandur, South-III, Chennai, South of Tamil Nadu State under Goods and Services Tax Laws View/Download
Apr 30, 2024 Intimation of orders from the GST Authorities of Different States View/Download
Apr 29, 2024 Declaration of COD of first part capacity of 57 MW out of 90 MW Anta Solar PV Project View/Download
Apr 29, 2024 Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the year ended 31.3.2024 View/Download
Apr 27, 2024 Intimation of order received from Deputy Commissioner, State Tax Lakadganj 501, Nagpur View/Download
Apr 26, 2024 Information regarding issuance of letter of Confirmation in lieu of Share Certificate (s) Lost View/Download
Apr 23, 2024 Intimation of order received from The Joint Commissioner, CGST and Central Excise, Patna-I under Goods and Service Tax Laws View/Download
Apr 23, 2024 Intimation regarding signing a Supplementary Joint Venture Agreement-3 by NTPC with NHPC, POWERGRID, DVC & CPRI on 23.04.2024 View/Download
Apr 19, 2024 Intimation of Press release titled "NTPC Green Energy Limited inks MoU with Indus Towers Limited". View/Download
Apr 18, 2024 Compliance Certificate under Regulation 7(3) of SEBI (LODR) Regulations, 2015 for the year ended 31.3.2024 View/Download
Apr 18, 2024 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Apr 12, 2024 Status of investors complaints/grievances for the quarter ending 31.03.2024. View/Download
Apr 10, 2024 Intimation of order received from State Tax Officer, Surat, Gujarat, under Goods and Service Tax Laws View/Download
Apr 05, 2024 Intimation of order received from Deputy Commissioner (ST), State Special Circle-I, Kunchanapalli, Guntur Distt. View/Download
Apr 03, 2024 Newspaper Advertisement regarding transfer of Equity Shares to Investor Education and Protection Fund. View/Download
Apr 01, 2024 Change in Senior Management due to superannuation on 31.03.2024 View/Download
Apr 01, 2024 Declaration of Dependable Capacity and COD for Unit-2 of 660 MW of 1320 MW (2X660 MW) Maitree Super Thermal Power Plant (MSTPP) at Rampal, Mongla, Bagerhat of Bangladesh-India Friendship Power Company (Pvt.) Limited View/Download
Apr 01, 2024 Intimation regarding signing of Supplementary Joint Venture Agreement, Amendment-II, with U.P. Rajya Vidyut Utpadan Nigam Limited View/Download
Apr 01, 2024 Declaration of COD of second and last part capacity of 80 MW Out of 150 MW Chhattargarh Solar PV Project of NTPC Renewable Energy Limited View/Download
Apr 01, 2024 Declaration of COD of Durgapur PP-III Unit-2 of 20 MW of NTPC-SAIL Power Company Limited View/Download
Mar 30, 2024 Disclosure regarding discontinuation of operation of NTPC Barauni Thermal Power Station Stage-l (2X110 MW View/Download
Mar 30, 2024 Intimation of Appointment of Secretarial Auditor for the Financial Year 2023-24 View/Download
Mar 27, 2024 Closure of Trading Window w.e.f. 1st April, 2024 View/Download
Mar 22, 2024 Declaration of COD of Chatti Bariatu Coal Mining Project View/Download
Mar 19, 2024 Issue of Unsecured Non-Convertible Debentures of Rs. 1,500 Crore on 21.03.2024, through Private Placement at a Coupon of 7.48% P.A. for a tenor of 2 years, maturing on 21.03.2026 View/Download
Mar 18, 2024 Declaration Of COD Of Unit#2 (660 MW) Of North Karanpura STPP (3X660 MW View/Download
Mar 13, 2024 Intimation regarding loss of Share Certificate(s)/issue of duplicate share certificate View/Download
Mar 08, 2024 Orders from the Addl. Commissioner, Central Tax, GST & Central Excise View/Download
Mar 04, 2024 Press Release titled "NGEL Signs JV Agreement with UPRVUNL for development of Renewable Power Parks View/Download
Mar 03, 2024 NTPC Board accorded investment approval for Singrauli Super Thermal Power Project, Stage-III (2X800 MW) View/Download
Mar 01, 2024 Change in Senior Management due to superannuation on 29.02.2024 View/Download
Mar 01, 2024 Intimation of completion of trial operation by 660 MW capacity unit of North Karanpura Super Thermal Power Project - NTPC Group Crosses 75 GW Installed Capacity View/Download
Feb 29, 2024 Declaration of COD of Unit#2 (800 MW) of Telangana STPP, Stage-I (2X800 MW) View/Download
Feb 28, 2024 Intimation of Press Release titled “NTPC Green Energy Limited joins hands with MAHAGENCO for development of Renewable Energy Parks in Maharashtra View/Download
Feb 27, 2024 Intimation of notices received from Stock Exchanges regarding non-compliance due to composition of Board View/Download
Feb 26, 2024 Intimation regarding Appointment of Shri Ravindra Kumar (DIN: 10523088) as Director (Operations) of NTPC Limited View/Download
Feb 23, 2024 Declaration of COD of first part capacity of 70 MW out of 150 MW Chhattargarh Solar PV Project of NTPC Renewable Energy Limited (NTPC REL) View/Download
Feb 13, 2024 Declaration of COD of first part capacity of 14 MW out of 40 MW Ayodhya Solar PV Project of NTPC Green Energy Limited (A Wholly-Owned Subsidiary of NTPC Limited) View/Download
Feb 08, 2024 Intimation regarding Orders received from The Addl. Commissioner, GST Delhi (East), I.P. Estate, New Delhi View/Download
Feb 05, 2024 Transcript of conference call held on 30 January 2024 View/Download
Feb 05, 2024 Clarification on News Item 'NTPC To Acquire Rs 5,000 Crore KSK Mahanadi View/Download
Feb 01, 2024 Intimation regarding change in Senior Management due to superannuation on 31.01.2024 View/Download
Feb 01, 2024 Disclosure regarding Additional Charge of Director (Operations), NTPC to Director (Projects), NTPC View/Download
Feb 01, 2024 Intimation of change in Directorate due to superannuation of Shri Ramesh Babu V. (Director (Operations) View/Download
Jan 30, 2024 Link for Audio Recording of conference call held with Analysts & Investors on 30 January 2024 View/Download
Jan 29, 2024 Board Meeting Outcome for Second Interim Dividend for the financial year 2023-24 View/Download
Jan 29, 2024 Disclosure regarding Appointment of Ms. Ritu Arora as Company Secretary & Compliance Officer of NTP View/Download
Jan 29, 2024 Board Meeting Outcome for Submission of Unaudited Financial Results & Second Interim Dividend for quarter ending 31.12.2023. View/Download
Jan 29, 2024 Key Performance Highlights of NTPC Limited for the Quarter Ended December 31, 2023 View/Download
Jan 24, 2024 Intimation w.r.t conference call on January 30, 2024, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q3 FY24 View/Download
Jan 24, 2024 NTPC Ltd. will hold a conference call for analysts and investors at 02:00 PM India time on January 30, 2024, wherein the Senior Management team of NTPC comprising of Mr. Jaikumar Srinivasan, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Shivam Srivastava, Director (Fuel) and Mr. K. Shanmugha Sundaram, Director (Projects) will discuss the Company’s results for the 3rd quarter of financial year 2023-24 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

Universal Dial-in Numbers
+91 22 6280 1259 / +91 22 7115 8160

International Toll-Free
USA 1866 746 2133 | UK 0808 101 1573 |
Singapore 800 101 2045 | Hong Kong 800 964 448

Diamond Pass Registration (choruscall.in)

Recording and transcript of the conference call will be available on the Company’s website post the conference call.

For further information, please contact:
Mr. Harsh Dole | Tel: +91 22 46464660 | Email: harsh.dole@iiflcap.com
Mr. Ishan Minda | Tel: +91 22 46464642 | Email: ishan.minda@iiflcap.com
IIFL Securities

Regards

Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: isd@ntpc.co.in
View
Jan 23, 2024 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 for the quarter ended December 31, 2023. View/Download
Jan 23, 2024 Newspaper publication regarding intimation of Record Date View/Download
Jan 19, 2024 Intimation of record date for 2nd Interim Dividend View/Download
Jan 19, 2024 The status of investors complaints/grievances for the quarter ending 31.12.2023 View/Download
Jan 19, 2024 Board Meeting Intimation for Unaudited Financial Results for the Quarter and Nine-Months Period Ended December 31, 2023 and Declaration Of 2nd Interim Dividend for the Financial Year 2023-24, If Any. View/Download
Jan 19, 2024 Closure of Trading Window closed from January 1, 2024 shall remain closed till January 31, 2024. View/Download
Jan 06, 2024 Order From GST Authority View/Download
Jan 05, 2024 Intimation regarding orders from GST Authorities for collection of GST, interest and penalty for Delhi, U.P., AP, Bihar, Chhattisgarh, Maharashtra and Gujarat states View/Download
Jan 02, 2024 Intimation regarding change in Senior management due to promotion w.e.f. 01.01.2024 View/Download
Jan 01, 2024 Cessation of Govt. Nominee Director View/Download
Dec 27, 2023 Intimation regarding Loss of Share Certificate(s)/ Duplicate Certificate View/Download
Dec 27, 2023 Closure of Trading Window w.e.f. 1st January, 2024 View/Download
Dec 20, 2023 Intimation regarding Loss of Share Certificate(s)/ Duplicate Certificate View/Download
Dec 05, 2023 Update on Order under section 43A of Competition Act, 2002 View/Download
Dec 01, 2023 Intimation of change in Directorate as Shri K. Shanmugha Sundaram (DIN: 10347322) has taken charge as Director (Projects), NTPC on 1st December, 202 View/Download
Dec 01, 2023 Intimation of change in Directorate due to superannuation of Shri Ujjwal Kanti Bhattacharya as Director (Projects) of NTPC Limited View/Download
Nov 04, 2023 Declaration of COD of First Part Capacity of 50 MW out of 150 MW Dayapar Wind Energy Project Phase-I of NTPC Renewable Energy Limited (NTPC REL) View/Download
Nov 03, 2023 Brief Profile of Statutory Auditors View/Download
Nov 01, 2023 Earnings Call Transcript of Con-call held on 28.10.2023 for the quarter and half year ended 30.09.2023 View/Download
Oct 28, 2023 Key Performance Highlights of NTPC Limited for the quarter and half year ended September 30, 2023 View/Download
Oct 28, 2023 Link For Audio Recording of Conference Call Held with Analysts & Investors On 28 October 2023 View/Download
Oct 28, 2023 Board Meeting Outcome for:
Submission of Unaudited Financial Results for the Quarter and Half-Year Ended 30 September 2023.
First Interim Dividend for The Financial Year 2023-24.
View/Download
Oct 25, 2023 NTPC Ltd. will hold a conference call for analysts and investors at 6:00 PM India time on October 28, 2023, wherein the Senior Management team of NTPC comprising of Mr. Jaikumar Srinivasan, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Ujjwal Kanti Bhattacharya, Director (Projects) and Mr. Shivam Srivastava, Director (Fuel) will discuss the Company’s results for the 2nd quarter of financial year 2023-24 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

Universal Dial-in Numbers
+91 22 6280 1222/ +91 22 7115 8123

International Toll-Free

Argentina: 0080014243444 | Australia: 1800053698 | Belgium: 0080014243444 |
Canada: 01180014243444 |China: 4008428405 | France: 0800914745 |
Germany: 0080014243444 | Hong Kong: 800964448 | Italy: 0080014243444 |
Japan: 00531161110 | Netherlands: 08000229808 | Poland: 008001124248
Singapore: 8001012045 | South Korea: 00180014243444 | Sweden: 0080014243444 |
Thailand: 00180014243444 | UK: 08081011573 | USA: 18667462133

Recording and transcript of the conference call will be available on the Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mr. Rajesh Majumdar
Batlivala & Karani Securities India Pvt. Ltd.
rajesh.majumdar@bksec.com

Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: isd@ntpc.co.in
View
Oct 25, 2023 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Oct 25, 2023 Newspaper Publication regarding record date View/Download
Oct 25, 2023 Investor Meet Intimation with respect to Conference call on October 28, 2023, wherein Senior Management team of NTPC Ltd. discussed about the Q2 FY24 Company's Financial Results View/Download
Oct 19, 2023 Trading window which was closed from 1st October 2023 shall remain closed till October 30, 2023. View/Download
Oct 19, 2023 Board Meeting Intimation for - Un-Audited Financial Results for the Quarter and Half Year Ended September 30, 2023 - Declaration of Interim Dividend for The Financial Year 2023-24 View/Download
Oct 19, 2023 Intimation of record date for Interim Dividend for FY 2023-24 View/Download
Oct 07, 2023 Appointment of Statutory Auditors for FY 2023-24 View/Download
Oct 01, 2023 Declaration of COD of Talaipalli Coal Mining Project View/Download
Sep 28, 2023 Intimation regarding closure of Trading Window for Insiders View/Download
Sep 27, 2023 Declaration of COD of Unit#1 (800 MW) of Telangana STPP, Stage-I (2X800 MW) View/Download
Sep 14, 2023 Intimation of signing of Supplementary Joint Venture Agreement by NTPC Limited with Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) View/Download
Sep 12, 2023 Completion of Trial Operation by Unit-1 (800 MW) of Telangana Super Thermal Power Project View/Download
Aug 31, 2023 Scrutinizer’s Report on the voting results of 47th Annual General Meeting held on 30th August 2023 View/Download
Aug 30, 2023 Proceedings of 47th Annual General Meeting held on 30 August 2023 View/Download
Aug 30, 2023 Intimation of approval accorded by Board for Investment in Lara Super Thermal Power Project, Stage-II (2X800 MW) View/Download
Aug 24, 2023 Intimation of Order under section 43A of the Competition Act, 2002 from Competition Commission of India regarding imposing a penalty of Rs. 40,00,000 View/Download
Aug 17, 2023 Intimation of signing of Business Transfer Agreement by NTPC Limited with NTPC Mining Limited (NML) for hiving off its mining business to NML View/Download
Aug 08, 2023 Newspaper Notice Regarding 47th Annual General Meeting View/Download
Aug 05, 2023 Integrated Annual Report for FY 2022-23 View/Download
Aug 04, 2023 Regulation 53 (1) Annual Report. View/Download
Aug 04, 2023 Transcript of Annual Analysts and Investors Meet held on 31 July 2023 View/Download
Aug 04, 2023 Notice of 47th AGM to be held though VC / OAVM and Integrated Annual Report of the Company for the Financial Year 2022-23. Details regarding e-Voting & Remote e-voting View/Download
Jul 31, 2023 19th Annual Analysts and Investors Meet Presentation View/Download
Jul 31, 2023 Audio Recording of Annual Analysts and Investors Meet View/Download
Jul 29, 2023 Submission Of Unaudited Financial Results for the Quarter ended 30 June 2023. View/Download
Jul 29, 2023 Key Performance Highlights of NTPC Limited for The Quarter Ended June 30, 2023. View/Download
Jul 29, 2023 Intimation of Board approval accorded by NTPC for hive-off of its coal mining business to a wholly owned subsidiary i.e. NTPC Mining Limited through a business transfer agreemen View/Download
Jul 27, 2023 Declaration of COD of second unit of 660 MW Capacity of Barh Super Thermal Power Station, Stage-I (3X660 MW) View/Download
Jul 24, 2023 Copy of newspaper publication in respect of record date and 47th Annual General Meeting. View/Download
Jul 21, 2023 19th Annual Analyst & Investor Meet on 31 July 2023 View/Download
Jul 20, 2023 Intimation of Record Date pursuant to Regulation 42 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the purpose of Final Dividend for the financial year 2022-23. View/Download
Jul 19, 2023 Closure of Trading Window View/Download
Jul 19, 2023 Board Meeting Intimation with respect to Un-Audited Financial Results for the Quarter Ended June 30, 2023 View/Download
Jul 14, 2023 The status of investors complaints/grievances for the quarter ending 30.06.2023. View/Download
Jul 14, 2023 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Jul 06, 2023 Completion of Trial Operation by 660 MW capacity unit of Barh Super Thermal Power Project View/Download
Jun 27, 2023 Intimation regarding closure of Trading Window View/Download
Jun 24, 2023 Outcome of Board Meeting regarding Raising of Funds through issue of Non-Convertible Debentures View/Download
Jun 21, 2023 Intimation of Board Meeting regarding Raising of Funds through issue of Non-Convertible Debentures View/Download
Jun 06, 2023 Declaration of COD of Second Part Capacity of 10 MW of 20 MW Gandhar Solar PV Project View/Download
Jun 03, 2023 Intimation of incorporation of new JV Company by NGEL in the name of INDIANOIL NTPC GREEN ENERGY PRIVATE LIMITED View/Download
Jun 02, 2023 Declaration of COD of Fifth and Last Part Capacity of 50 MW of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited View/Download
May 30, 2023 Compliances-Reg.24(A)- Submission of Annual Secretarial Compliance Report View/Download
May 23, 2023 Transcript of conference call held with Analysts & Investors on 19 May 2023 View/Download
May 19, 2023 Key Performance Highlights of NTPC Ltd. For The Quarter and Year Ended March 31, 2023 View/Download
May 19, 2023 Disclosure of Related Party Transactions View/Download
May 19, 2023 Board Meeting Outcome for Submission of Audited Financial Results Final Dividend View/Download
May 19, 2023 Outcome Of Board Meeting
1. Submission of Audited Financial Results for The Quarter and Year Ended 31 March 2023 Final Dividend for the Financial Year 2022-23.
2. Disclosure Under Regulation 52(7) & 52(7A) Of SEBI (LODR), Regulations for Quarter Ended 31 March 2023.
3. Disclosure Under Regulation 54 Read with Regulation 56(1) (D) Of SEBI (LODR), Regulations As On 31 March 2023
View/Download
May 19, 2023 Link for Audio Recording of conference call held with Analysts & Investors on 19 May 2023 View/Download
May 17, 2023 Intimation of Conference call on May 19, 2023, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q4 and FY23 and interact with the Analysts and Investors View/Download
May 17, 2023 NTPC Ltd. will hold a conference call for analysts and investors at 6:00 PM India time on May 19, 2023, wherein Senior Management team of NTPC comprising of Mr. Jaikumar Srinivasan, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Ujjwal Kanti Bhattacharya, Director (Projects) and Mr. Shivam Srivastava, Director (Fuel) will discuss the Company’s results for the 4th quarter and financial year 2022-23 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.


India Access:
Primary Number/Secondary
+91 22 6280 1366

+91 22 7115 8267

The numbers listed above are universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong Kong 800 964 448
Singapore 800 101 2045

A transcript of the conference call will be available on Company’s website post the conference call.
For any further enquiries regarding the conference call, the following may be contacted:

Mr. Sudhanshu Bansal | +91-9910693618 | sudhanshu.bansal@jmfl.com
Mr. Darshan Gangar | +91-9821162791 | darshan.gangar@jmfl.com
Ms. Lorraine Gomes | +91- 9821833479 | lorraine.gomes@jmfl.com
JM Financial Institutional Securities Limited

Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: isd@ntpc.co.in
View
May 10, 2023 Board Meeting Intimation for Intimation Regarding Holding of Meeting of The Board of Directors to Consider: - Annual Standalone and Consolidated Financial Statements for the Year Ended March 31, 2023 - Recommendation of Dividend for the year ended March 31, 2023. View/Download
May 10, 2023 Closure of Trading Window View/Download
May 02, 2023 Declaration of Dependable Capacity and Initial Operation Date (IOD) for Unit-1 of 660 MW of 1320 MW (2X660) Maitree Super Thermal Power Plant (MSTPP) at Rampal, Mongla, Bagerhat of Bangladesh-India Friendship Power Company (Pvt.) Limited (BIFPCL) (A Foreign JV Company of NTPC Limited) View/Download
May 01, 2023 Intimation of appointment of Shri Shivam Srivastava (DIN: 10141887) as Director (Fuel) of NTPC Limited View/Download
May 01, 2023 Intimation of a Supplementary Joint Venture Agreement signed by NTPC with Nuclear Power Corporation of India Limited on 1st May 2023 View/Download
Apr 27, 2023 Compliance Certificate under Regulation 40(9) Of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 For the Year ended 31.3.2023 View/Download
Apr 25, 2023 Compliance Certificate Under Regulation 7(3) Of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the year ended 31.3.2023 View/Download
Apr 25, 2023 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Apr 21, 2023 The status of investors complaints/grievances for the quarter ending 31.03.2023. View/Download
Apr 12, 2023 Intimation of NTPC’s decision to issue unsecured non-convertible debentures of Rs.3,000 crore on 17.04.2023, through private placemen View/Download
Apr 11, 2023 Annual Disclosure of NTPC Limited as a Large Corporate Borrower for FY 2022-23 View/Download
Apr 11, 2023 Initial Disclosure to be made by an entity identified as a Large Corporate. View/Download
Apr 01, 2023 Declaration of COD of Fourth Part Capacity of 50 MW out of 300 MW Nokhra Solar PV Project of NTPC Green Energy Limited (A Wholly Owned Subsidiary Of NTPC Limited) View/Download
Mar 29, 2023 Press release titled 'NTPC Renewable Energy Limited Signs Term Sheet with Greenko ZeroC Pvt. Ltd. to Supply Round the Clock RE Power of 1300 MW Capacity for its Green Ammonia Plant' dated 28.03.2023 View/Download
Mar 28, 2023 Closure of Trading Window View/Download
Mar 21, 2023 Press release titled 'NTPC Renewable Energy Limited Signs MoU with Indian Army for the implementation of Green Hydrogen Projects in Army Establishments' dated 21.03.2023. View/Download
Mar 21, 2023 Press release titled 'NTPC Green Energy Limited (NGEL) inks pact with Indian Oil Corporation Limited (IOCL)' issued by NTPC Green Energy Limited (a wholly owned subsidiary of NTPC Limited) View/Download
Feb 28, 2023 Intimation of completion the transfer of 15 renewable energy assets and 100% equity holding in NTPC Renewable Energy Limited to NTPC Green Energy Limited ('NGEL'), a wholly owned subsidiary of NTPC View/Download
Feb 28, 2023 Declaration of COD of First Unit of 660 MW Capacity of North Karanpura Super Thermal Power Station (3X660 MW) View/Download
Feb 15, 2023 Declaration of COD of Third Part Capacity of 50 MW out of 300 MW Nokhra Solar PV Project View/Download
Feb 01, 2023 Intimation of Additional Charge of Director (Fuel), NTPC to Director (Operations), NTPC View/Download
Feb 01, 2023 Intimation of cessation of Shri Chandan Kumar Mondol (DIN: 08535016) as Director (Commercial) due to attaining the age of superannuation View/Download
Jan 31, 2023 Transcript of Conference Call held with Analysts & Investors on 28th January 2023 View/Download
Jan 28, 2023 Board Meeting outcome for submission of Unaudited Financial Results for the quarter and nine months ended December 31st, 2022 & Interim Dividend for the Financial Year 2022-23 View/Download
Jan 28, 2023 Key performance highlights of NTPC Ltd. for the quarter and nine months ended December 31st, 2022. View/Download
Jan 28, 2023 Board Meeting outcome for Interim Dividend for the Financial Year 2022-23 View/Download
Jan 28, 2023 Link for audio recording of Conference Call held with Analysts & Investors on 28 January 2023 View/Download
Jan 24, 2023 Intimation of Investor & Analyst Conference Call on January 28, 2023, wherein Senior Management team of NTPC Ltd. will discuss the Company's Financial Results for Q3 FY23 View/Download
Jan 24, 2023 NTPC Ltd. will hold a conference call for analysts and investors at 4:30 PM India time on January 28, 2023, wherein Senior Management team of NTPC comprising of Mr. Jaikumar Srinivasan, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 3rd quarter of financial year 2022-23 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1384
+91 22 7115 8285
The numbers listed above is universally accessible from all networks and all countries
Or click below for the Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=2418607&linkSecurityString=beee62709

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted :

Mohit Kumar / Nikhil Abhyankar
DAM Capital Advisors Limited,
Phone: +91-22-4202-2573/+91-22-4202-2567
Email: mohit.k@damcapital.in / nikhil@damcapital.in

Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Jan 23, 2023 Completion of Trial Operation by 660 MW Capacity Unit of North Karanpura Super Thermal Power Project View/Download
Jan 20, 2023 Newspaper Publication regarding Record Date for Interim Dividend for FY 2022-23 View/Download
Jan 19, 2023 The status of investors complaints/grievances for the quarter ending 31.12.2022 View/Download
Jan 18, 2023 Intimation regarding Closure of Trading Window View/Download
Jan 18, 2023 Board Meeting intimation regarding holding of Meeting of the Board of Directors to consider: · Un-Audited Financial Results for The Quarter and Nine-Months Period Ended December 31st, 2022. · Declaration of Interim Dividend for the Financial Year 2022-23. View/Download
Jan 18, 2023 Intimation regarding Fixation of Record Date for Payment of Interim Dividend for the Year 2022-23 View/Download
Jan 17, 2023 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Jan 16, 2023 Press release titled 'Government of Tripura & NTPC Renewable Energy Ltd. sign Memorandum of Understanding for Collaboration in Renewable Energy Development in the State of Tripura' dated 16.01.2023 View/Download
Jan 10, 2023 Clarification on News Item 'Supreme Court Stays Telangana High Court Order Awarding 2-Month Jail Term to NTPC Chairperson in Contempt Case' View/Download
Jan 04, 2023 Press release titled 'NTPC Green Energy Ltd. (NGEL) and HPCL sign Memorandum of Understanding for Renewable Energy Business and Green Power for HPCL Refineries and other Business Units' dated 04.01.2023 View/Download
Jan 03, 2023 NTPC's press release titled 'NTPC starts India's first green hydrogen blending operation in PNG network' dated 03.01.2023 View/Download
Dec 30, 2022 Declaration of COD of First Part Capacity of 10 MW out of 23 MW Solapur Solar PV Project View/Download
Dec 29, 2022 Declaration of COD of Second Part Capacity of 50 MW out of 300 MW Nokhra Solar PV Project View/Download
Dec 26, 2022 Intimation regarding closure of Trading Window View/Download
Dec 26, 2022 Press Release Titled 'NTPC And Tecnimont Sign MOU to Explore Green Methanol Production' View/Download
Dec 23, 2022 NTPC's press release titled 'NTPC Limited and GE Power India Limited sign MoU to reduce carbon intensity from NTPC's coal fired units' dated 22.12.2022 View/Download
Dec 20, 2022 Declaration of COD of First Part Capacity of 100 MW out of 300 MW Nokhra Solar PV Project View/Download
Dec 14, 2022 Intimation of NTPC’s decision to issue unsecured non-convertible debentures of Rs.500 crore on 16.12.2022, through private placement at a coupon of 7.44% p.a. with a door to door maturity of 10 years 3 months 30 days on 15.04.2033 View/Download
Dec 14, 2022 Declaration of COD of Second Part Capacity of 67.73 MW Out Of 230 MW Ettayapuram Solar PV Project View/Download
Dec 13, 2022 Declaration of COD of Entire Capacities of 150 MW & 90 MW Devikot Solar PV Projects View/Download
Dec 10, 2022 Declaration of COD of First Part Capacity of 162.27 MW out of 230 MW Ettayapuram Solar PV Project View/Download
Nov 10, 2022 Disclosure of Related Party Transactions in terms of Regulation 23(9) of SEBI (LODR) Regulations, 2015 View/Download
Nov 01, 2022 Transcript of conference call held with Analysts & Investors on 29th October 2022 View/Download
Oct 29, 2022 Link for Audio Recording of conference call held with Analysts & Investors on 29th October 2022 View/Download
Oct 29, 2022 Appointment of Shri Arun Kumar (ACS No. 23236), Additional General Manager as Company Secretary and Compliance Officer View/Download
Oct 29, 2022 Key Performance Highlights of NTPC Ltd. For The Quarter and Half Year Ended September 30, 2022. View/Download
Oct 29, 2022 Outcome of the Board Meeting for submission of Unaudited Financial Results for the Quarter And Half-Year Ended September 30, 2022 View/Download
Oct 25, 2022 NTPC Ltd. will hold a conference call for analysts and investors at 5:00 PM India time on October 29, 2022, where Senior Management team of NTPC comprising of Mr. Jaikumar Srinivasan, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 2nd quarter of financial year 2022-23 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1144
+91 22 7115 8045
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=1441449&linkSecurityString=6c5a264a2

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Rahul Modi
ICICI Securities Ltd
Phone: +91-22-6807-7373 Mobile: +91 7738096775
Email: rahul.modi@icicisecurities.com

Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Oct 25, 2022 Conference Call on October 29, 2022, wherein Senior Management team of NTPC Ltd. will discuss the Company’s results for Q2 FY23 View/Download
Oct 20, 2022 Intimation regarding closure of Trading Window View/Download
Oct 20, 2022 Board Meeting intimation to approve and take on record the Un-Audited Financial Results for the Quarter and Half Year ended September 30th, 2022 View/Download
Oct 20, 2022 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 View/Download
Oct 19, 2022 Statement on utilisation of proceeds of Non-Convertible Debenture for the Quarter ended September 30, 2022 View/Download
Oct 17, 2022 NTPC's press release titled 'NTPC, MHI and MPI sign MoU for demonstrating Hydrogen co-firing in Auraiya Gas Power Plant' dated 17.10.2022 View/Download
Oct 14, 2022 The status of investors complaints/grievances for the quarter ending 30.09.2022 View/Download
Oct 12, 2022 NTPC's press release titled 'NTPC and Siemens Limited sign MoU for demonstrating Hydrogen co-firing in Faridabad Gas Power Plant' dated 12.10.2022 View/Download
Oct 07, 2022 NTPC's press release titled 'NTPC and GE Gas Power Sign MoU for demonstrating Hydrogen co-firing in Gas Turbines to further Decarbonize Power Generation' dated 06.10.2022 View/Download
Oct 06, 2022 Press release titled NTPC and GE Gas Power Sign MoU for demonstrating Hydrogen co-firing in Gas Turbines to Further Decarbonize Power Generation View/Download
Oct 01, 2022 Intimation regarding cessation of Ms. Nandini Sarkar as Company Secretary & Compliance Officer of NTPC View/Download
Sep 29, 2022 Intimation regarding closure of Trading Window View/Download
Sep 28, 2022 Declaration of COD of First Part Capacity of 150 MW out of 300 MW Shambu Ki Burj-2 Solar PV Project View/Download
Sep 26, 2022 Brief Profile of Statutory Auditors View/Download
Sep 15, 2022 Declaration of COD of Entire Capacity of 20 MW Auraiya Floating Solar PV Project View/Download
Sep 10, 2022 Appointment of Statutory Auditors for FY 2022-23 View/Download
Sep 07, 2022 Clarification on News Item 'NTPC Plans to divest stake in Subsidiaries, JVs' View/Download
Sep 06, 2022 NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Limited, has incorporated Green Valley Renewable Energy Limited, as a subsidiary of NTPC REL in 51:49 Joint Venture with DVC on 25 August 2022 View/Download
Sep 05, 2022 Implementation of Resolution Plan submitted by NTPC and approved by NCLT for Jhabua Power Limited View/Download
Aug 31, 2022 Scrutiniser Report and Voting Result of the 46th Annual General Meeting of the Company held on 30th August 2022 View/Download
Aug 30, 2022 Proceedings of 46th Annual General Meeting of the Company View/Download
Aug 26, 2022 Effective Date of Scheme of Amalgamation of Nabinagar Power Generation Company Limited and Kanti Bijlee Utpadan Nigam Limited with NTPC Limited View/Download
Aug 26, 2022 Investment Approval for Talcher Thermal Power Project, Stage-III (2X660 MW) View/Download
Aug 23, 2022 NTPC’s decision to issue unsecured non-convertible debentures of Rs.2,000 crore on 25 August 2022, through private placement View/Download
Aug 22, 2022 Declaration of COD of First Part Capacity of 10 MW out of 20 MW Gandhar Solar PV Project View/Download
Aug 16, 2022 Declaration of COD of Third Part Capacity of 21 MW out of 56 MW Kawas Solar PV Project View/Download
Aug 08, 2022 Newspaper publication on 8th August 2022 w.r.t. Notice of 45th Annual General Meeting View/Download
Aug 05, 2022 Declaration of COD of 250 MW Kolyat, Bikaner (Shambu Ki Burj-1) Solar PV Project View/Download
Aug 05, 2022 Notice of 46th Annual General Meeting to be held though Video Conferencing (VC) / Other Audio Visual Means (OAVM) along with the Integrated Annual Report of the Company for the Financial Year 2021-22. View/Download
Aug 05, 2022 Declaration of COD of Fifth Part Capacity of 48.8 MW out of 296 MW Fatehgarh Solar PV Project View/Download
Aug 05, 2022 Reg. 34 (1) Annual Report View/Download
Aug 04, 2022 Transcript of Annual Analysts & Investors Meet on 1st August 2022. View/Download
Aug 03, 2022 Intimation of MCA order in matter of the Scheme of Amalgamation between Nabinagar Power Generating Company Limited, Kanti Bijlee Utpadan Nigam Limited and NTPC Limited and their respective shareholders and creditors View/Download
Aug 01, 2022 Newspaper publication on 31st July, 2022 & 1st August, 2022 regarding Notice of 46th Annual General Meeting of the Company and Record Date View/Download
Aug 01, 2022 Investor Presentation made at the 18th Annual Analysts and Investors Meet of NTPC Limited held on 1st August 2022. View/Download
Aug 01, 2022 Audio Recording of 18th Annual Analysts and Investors Meet held on 1st August 2022. View/Download
Jul 29, 2022 Key performance highlights of NTPC Ltd. for the Quarter ended June 30, 2022 View/Download
Jul 29, 2022 Intimation of appointment of Shri Jaikumar Srinivasan, Director (Finance) as Chief Financial Officer of NTPC Limited View/Download
Jul 29, 2022 Change in Management- Intimation of appointment of Shri Jaikumar Srinivasan, Director (Finance) as Chief Financial Officer of NTPC Limited View/Download
Jul 29, 2022 Outcome of the Board Meeting View/Download
Jul 29, 2022 Board Meeting outcome for Raising of Funds through Issue of Non-Convertible Debentures View/Download
Jul 29, 2022 Intimation of Record Date for the purpose of Final Dividend for the Financial Year 2021-22 View/Download
Jul 25, 2022 Hosting of 18th Annual Analysts and Investors Meet on 1 August 2022 at Mumbai, wherein CMD and Board of Directors of the company will interact with the Analysts and Investors. wherein CMD and Board of Directors of the company will interact with the Analysts and Investors. View/Download
Jul 22, 2022 Board Meeting Intimation for:
· Un-Audited Financial Results for the Quarter ended June 30, 2022.
· Raising of funds through issue of Non-Convertible Debentures.
View/Download
Jul 22, 2022 Clarification on News Item 'NTPC Inks Pact with Moroccan Agency for Sustainable Energy' View/Download
Jul 22, 2022 Closure of Trading Window. View/Download
Jul 21, 2022 Change in Directorate due to appointment of Shri Jaikumar Srinivasan (DIN: 01220828) as Director (Finance) of NTPC Limited View/Download
Jul 19, 2022 Clarification on News Item 'Indian Oil, NTPC Form JV for setting up of Renewable Energy-Based Power Plant for Refineries' View/Download
Jul 15, 2022 The status of investors complaints/grievances for the quarter ending 30.06.2022 View/Download
Jul 11, 2022 Certificate under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018. View/Download
Jul 09, 2022 Transfer of 15 renewable energy assets (“RE Assets”) and 100% equity shareholding held in NTPC Renewable Energy Limited to NTPC Green Energy Limited (“NGEL”) View/Download
Jul 04, 2022 Confirmation on compliance of the payment obligations in relation to the Non-Convertible Debentures for the Quarter ended June 30, 2022 View/Download
Jul 01, 2022 Declaration of COD of Last Part Capacity of 20 MW out of 100 MW Ramagundam Floating Solar PV Project View/Download
Jun 27, 2022 Closure of Trading Window. View/Download
Jun 24, 2022 Declaration of COD of Last Part Capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project View/Download
Jun 20, 2022 Newspaper publication regarding date of Hearing in the matters of Amalgamation of Nabinagar Power Generating Company Limited and Kanti Bijlee Utpadan Nigam Limited (Wholly Owned Subsidiaries of NTPC Limited) with NTPC Limited View/Download
Jun 18, 2022 Declaration of COD of Fourth Part Capacity of 47.52 MW out of 296 MW Fatehgarh Solar PV Project View/Download
Jun 14, 2022 Declaration of Commercial Operation of Second Part Capacity of 15 MW out of 56 MW Kawas Solar PV Project View/Download
Jun 09, 2022 Change in Directorate due to Appointment of Shri Piyush Singh, Joint Secretary, Ministry of Power as Government Nominee Director on the Board of NTPC View/Download
Jun 02, 2022 Disclosure of Related Party Transactions for the half year ended 31.03.2022. View/Download
Jun 01, 2022 Intimation regarding cessation of Shri Anil Kumar Gautam as Director (Finance) and Chief Financial Officer of NTPC View/Download
Jun 01, 2022 Intimation of cessation of Shri Vivek Kumar Dewangan as Government Nominee Director of NTPC View/Download
Jun 01, 2022 Intimation regarding appointment of Ms. Renu Narang as Chief Financial Officer of NTPC View/Download
May 31, 2022 Declaration of COD of Unit-3 of 660 MW capacity of Nabinagar Power Generating Company Limited (Wholly Owned Subsidiary of NTPC Limited) (3 X 660 MW) View/Download
May 30, 2022 Annual Secretarial Compliance Report for the year ended March 31,2022. View/Download
May 25, 2022 Transcript of conference call held with Analysts & Investors on 20 May 2022. View/Download
May 21, 2022 Link for Audio Recording of conference call held with Analysts & Investors on 20 May 2022. View/Download
May 20, 2022 Board recommends Final Dividend for the Financial Year 2021-22. View/Download
May 20, 2022 Declaration of COD of Second Part Capacity of 35 MW out of 92 MW Kayamkulam Floating Solar PV Project View/Download
May 20, 2022 Outcome of Board Meeting: · Submission of Audited Financial Results for the quarter and year ended March 31, 2022. · Final Dividend for the Financial Year 2021-22. View/Download
May 20, 2022 Key performance highlights of NTPC Ltd. for the Quarter and Year ended March 31st, 2022 View/Download
May 20, 2022 Board Meeting Outcome for Final Dividend for the Financial Year 2021-22 View/Download
May 16, 2022 Investor and Analyst Conference Call on May 20th, 2022, wherein Senior Management team of NTPC Ltd. will discuss the Company’s results for Q4 and FY22. View/Download
May 16, 2022 NTPC Ltd. will hold a conference call for analysts and investors at 5:00 PM India time on May 20, 2022, where Senior Management team of NTPC comprising of Mr. A. K. Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 4th quarter and financial year 2021-22 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1222
+91 22 7115 8132
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=2332764&linkSecurityString=a07941c38

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Anupam Goswami
Batlivala & Karani Securities India Pvt. Ltd.
Phone: +91 90511 63951
Email: anupam.goswami@bksec.com

Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
May 14, 2022 Declaration of COD of First Part Capacity of 20 MW out of 56 MW Kawas Solar PV Project View/Download
May 12, 2022 Closure of Trading Window. View/Download
May 12, 2022 Board Meeting intimation to consider:
· Annual Standalone and Consolidated Financial Statements for the Year ended March 31st, 2022.
· Recommendation Of Dividend for the Year ended March 31st, 2022.
View/Download
Apr 27, 2022 Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the year ended 31.3.2022. View/Download
Apr 27, 2022 Corporate Disclosure requirement in regards to issue of unsecured non-convertible debentures of Rs.1,500 crore on 29 April 2022, through private placement at a coupon of 5.78% p.a. View/Download
Apr 27, 2022 Press release titled "NTPC, India's Largest Power Utility, Signs MOU with Energy Vault for Gravity-based Energy Storage Technology" View/Download
Apr 26, 2022 Compliance Certificate under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the year ended 31.3.2022. View/Download
Apr 26, 2022 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018. View/Download
Apr 20, 2022 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 View/Download
Apr 20, 2022 Voting Results for Meetings of Equity Shareholders and Unsecured Creditors held on 18th April 2022 View/Download
Apr 18, 2022 Proceedings of the meeting of equity shareholders of Company held on Monday, 18th April, 2022 through Video Conferencing (VC)/ Other Audio Visual Means (OAVM) pursuant to order dated 28th January, 2022. View/Download
Apr 11, 2022 The status of investors complaints/grievances for the quarter ending 31.03.2022 View/Download
Apr 07, 2022 Intimation of incorporation of a wholly owned subsidiary, in the name of 'NTPC Green Energy Limited' View/Download
Apr 06, 2022 Communication to Shareholders regarding due date of transfer of Unpaid/Unclaimed Dividend to IEPF View/Download
Apr 05, 2022 Initial Disclosure to be made by an entity identified as a Large Corporate View/Download
Apr 05, 2022 The Annual Disclosure to be made by an entity identified as a Large Corporate View/Download
Apr 02, 2022 Declaration of Commercial Operation of Last Part Capacity of 80 MW out of 160 MW Jetsar Solar PV Project View/Download
Apr 01, 2022 Declaration of Commercial Operation of 250 MW Captive Power Unit at NSPCL Rourkela View/Download
Apr 01, 2022 Declaration of Commercial Operation of First Part Capacity of 22 MW Out of 92 MW Kayamkulam Floating Solar PV Project View/Download
Mar 29, 2022 Intimation regarding Closure of Trading Window View/Download
Mar 24, 2022 Declaration of Commercial Operation of Third Part Capacity of 42.50 MW Out Of 100 MW Ramagundam Floating Solar Project View/Download
Mar 21, 2022 Newspaper Notice regarding Remote e-voting, cut-off date etc. in respect of meetings of Equity Shareholders and Unsecured Creditors of the NTPC Limited to be held on 18/04/2022 View/Download
Mar 17, 2022 Intimation of copy of newspaper publication made on 17.03.2022 in respect of meetings of Equity Shareholders and Unsecured Creditors View/Download
Mar 16, 2022 Intimation about meetings of the Equity Shareholders and Unsecured Creditors to be held on Monday, 18th April 2022 View/Download
Mar 09, 2022 Completion of Trial Operation by Unit-3 of 660 MW Capacity of Nabinagar Power Generating Company Limited (A Wholly Owned Subsidiary Company of NTPC Limited) View/Download
Mar 04, 2022 Declaration of Commercial Operation of Third Part Capacity of 74.88 MW out of 296 MW Fatehgarh Solar PV Project View/Download
Feb 05, 2022 Declaration of Commercial Operation of Second Part Capacity of 74.88 MW Out of 296 MW Fatehgarh Solar PV Project View/Download
Jan 31, 2022 Press Release regarding NVVN (a wholly owned subsidiary of NTPC Ltd.) acquires 5% Equity stake in PXIL View/Download
Jan 29, 2022 Intimation of Board approval for Asset Monetization Proposal to hive-off the identified Renewable Energy Assets of NTPC along with NTPC Renewable Energy Limited (NTPC REL) to a wholly owned Company and carrying out monetization of the wholly owned Company through IPO or strategic investment route, subject to requisite approvals/clearances View/Download
Jan 29, 2022 Board Meeting outcome for declaration of Interim Dividend for the Financial Year 2021-22 and Unaudited Financial Results for the quarter and nine-months ended December 31, 2021 View/Download
Jan 29, 2022 Key Performance Highlights for the Quarter and Nine-Months Ended December 31, 2021 View/Download
Jan 29, 2022 Outcome of the Board Meeting for submission of Unaudited Financial Results for the Quarter and Nine-Months ended December 31, 2021 & declaration of Interim Dividend for the Financial Year 2021-22 View/Download
Jan 24, 2022 Intimation of Investor & Analyst Conference Call on January 29, 2022, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q3 FY22 View/Download
Jan 24, 2022 NTPC Ltd. will hold a conference call for analysts and investors at 5:30 PM India time on January 29, 2022, where Senior Management team of NTPC comprising of Mr. A. K. Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 3rd quarter of financial year 2021-22 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1259
+91 22 7115 8160
The numbers listed above are universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=0661189&linkSecurityString=2ad56ba26

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Harsh Dole
Phone: +91 22 4646 4660
Email: harsh.dole@iiflcap.com



Regards
Aditya Dar
Executive Director (Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Jan 22, 2022 Intimation of Newspaper Publication regarding notice of record date View/Download
Jan 20, 2022 Intimation of Board Meeting to be held on 29.01.2022 View/Download
Jan 20, 2022 Intimation regarding fixation of record date for payment of Interim Dividend for the Financial Year 2021-22, If Any View/Download
Jan 20, 2022 Intimation regarding Closure of Trading Window. View/Download
Jan 20, 2022 Intimation regarding holding of meeting of the Board of Directors to consider:- Un-Audited Financial Results for the Quarter and Nine-Months Period ended December 31, 2021 and declaration of Interim Dividend for the Financial Year 2021-22, if Any View/Download
Jan 20, 2022 Corporate Action to consider Interim Dividend on the Equity Share Capital of the Company for the year 2021-22. View/Download
Jan 14, 2022 Status of investors complaints for the quarter ending 31.12.2021 View/Download
Jan 10, 2022 Certificates under Regulation 74(5) of SEBI (Depositories and Participants) Regulations, 2018 for quarter ended December 31, 2021. View/Download
Dec 31, 2021 Declaration of COD of First Part Capacity of 49.92 MW out of 296 MW Fatehgarh Solar PV Project View/Download
Dec 30, 2021 Intimation of Board approval regarding discontinuance of operation of Muzaffarpur Thermal Power Station (MTPS), Stage-I (2X110 MW) of Kanti Bijlee Utpadan Nigam Limited (KBUNL), a wholly owned Subsidiary of NTPC w.e.f. 8th September, 2021 View/Download
Dec 27, 2021 Intimation regarding Closure of Trading Window View/Download
Dec 16, 2021 Intimation of NTPC’s decision to issue unsecured non-convertible debentures of Rs.1,175 crore on 20 December 2021, through private placement at a coupon of 6.74% p.a. with a ddoor-to-door maturity of 10 years 3 months 25 days on 14 April 2032 View/Download
Dec 15, 2021 Press Release titled "NTPC Awards India's first Green Hydrogen Microgrid Project" is attached View/Download
Dec 08, 2021 Intimation regarding appointment of Ms. Sangitha Varier as Independent Director on the Board of the Company View/Download
Dec 01, 2021 Intimation regarding appointment of Shri Jitendra Jayantilal Tanna, Shri Vivek Gupta and Shri Vidyadhar Vaishampayan as Independent Directors on the Board of the Company View/Download
Nov 30, 2021 Declaration of COD of Unit-4 Of 250 MW capacity of Nabinagar Thermal Power Project (4X250 MW) of Bhartiya Rail Bijlee Company Limited (A Subsidiary Company of NTPC Limited) View/Download
Nov 29, 2021 Clarification on News Item 'NTPC Renewable Energy Signs PPA for 325 MW Solar Projects' View/Download
Nov 12, 2021 Completion of Trial Operation by 250 MW Capacity Unit of Nabinagar Thermal Power Plant of Bhartiya Rail Bijlee Company Limited (A Subsidiary Company of NTPC Limited) View/Download
Nov 11, 2021 Declaration of COD of Unit-1 of Barh Super Thermal Power Station Stage-I (3X660 MW) View/Download
Nov 02, 2021 Completion of Trial Operation by 660 MW Capacity Unit of Barh Super Thermal Power Project View/Download
Nov 02, 2021 Declaration of COD of First Part Capacity of 80 MW of 160 MW Jetsar Solar PV Project View/Download
Oct 29, 2021 Declaration of COD of First Part Capacity of 17.5 MW of 100 MW Ramagundam Floating Solar PV Project & Unit-2 (250 MW) Of Barauni Thermal Power Station Stage-II (2X250mw) View/Download
Oct 29, 2021 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018. View/Download
Oct 28, 2021 Outcome of the Board Meeting regarding Unaudited Financial Results for the quarter and half-year ended Septem her 30, 2021 View/Download
Oct 28, 2021 Key Performance Highlights of NTPC Ltd. for the quarter and half-year ended September 30, 2021 View/Download
Oct 27, 2021 NTPC Ltd. will hold a conference call for analysts and investors at 10:00 AM India time on October 29,2021, where Senior Management team of NTPC comprising of Mr. A. K. Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 2nd quarter of financial year 2021-22 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1384
+91 22 7115 8285
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=2922138&linkSecurityString=b3ddc459e

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mohit Kumar/Meet Vora
Phone: +91 22 42022573, +91 9892644535/ +91 22 42022567,+91 9819985759
Email: mohit.k@damcapital.in/meet@damcapital.in

Regards
Aditya Dar
Executive Director(Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Oct 27, 2021 Intimation of rescheduling of Investor & Analyst Conference Call on 29/10/2021, wherein Senior Management team of NTPC Ltd. will discuss the Company’s results Q2 FY22 and interact with the Analysts and Investors. View/Download
Oct 25, 2021 Intimation of Investor & Analyst Conference Call on October 28, 2021, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q2 FY22. View/Download
Oct 25, 2021 NTPC Ltd. will hold a conference call for analysts and investors at 4:00 PM India time on October 28,2021, where Senior Management team of NTPC comprising of Mr. A. K. Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 2nd quarter of financial year 2021-22 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1384
+91 22 7115 8285
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=2922138&linkSecurityString=b3ddc459e

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mohit Kumar/Meet Vora
Phone: +91 22 42022573, +91 9892644535/ +91 22 42022567,+91 9819985759
Email: mohit.k@damcapital.in/meet@damcapital.in

Regards
Aditya Dar
Executive Director(Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Oct 21, 2021 Closure of Trading Window View/Download
Oct 21, 2021 Intimation of Board Meeting for Un-Audited Financial Results for the Quarter and Half Year ended September 30, 2021 View/Download
Oct 18, 2021 Status of investors complaints for the quarter ending 30.09.2021 View/Download
Oct 07, 2021 Press Release on NTPC’s pact with Électricité de France S.A. for cooperation in international power sector View/Download
Oct 04, 2021 Clarification on News Item 'NTPC Planning IPOs of 3 Units to Raise $2 Billion' View/Download
Sep 29, 2021 Intimation regarding closure of Trading Window. View/Download
Sep 29, 2021 Voting Result and Scrutinizer Report of 45th Annual General Meeting View/Download
Sep 28, 2021 Proceedings of 45th Annual General Meeting. View/Download
Sep 27, 2021 Clarification on News Item 'NTPC Wins 1.9 GW Solar Projects Under CPSU Scheme' View/Download
Sep 27, 2021 Intimation of Brief profiles of the Joint Statutory Auditors. View/Download
Sep 16, 2021 Reply to Clarification sought by BSE on Increase in Volume View/Download
Sep 14, 2021 Intimation of appointment of Statutory Auditor/s View/Download
Sep 09, 2021 Intimation of NTPC’s decision to issue unsecured non-convertible bonds in the nature of debentures of Rs.3,000 crore on 13 September 2021, through private placement at a coupon of 6.69% p.a. with a door-to-door maturity of 10 years. View/Download
Sep 06, 2021 Copies of notice published in Indian Express, Financial Express and Jansatta (all India editions) on 5th September, 2021 in respect of 45th Annual General Meeting of the Company scheduled to be held on 28th September 2021 through video conferencing / other audio visual means are enclosed. View/Download
Sep 03, 2021 Intimation of Book Closure for the purpose of 45th Annual General Meeting View/Download
Sep 03, 2021 Notice of 45th Annual General Meeting, Information of E-voting, Integrated Annual Report for FY 2020-21 etc View/Download
Sep 03, 2021 Submission of copy of Annual Report for FY 2020-21 along with Notice of 45th Annual General Meeting View/Download
Aug 31, 2021 Declaration of COD of Unit-2 of 800 MW Capacity of Darlipali Super Thermal Power Station, Stage-I (2 X 800 MW) View/Download
Aug 26, 2021 Newspaper Publication regarding 45th Annual General Meeting and Record Date for Final Dividend View/Download
Aug 24, 2021 Intimation of Record Date for the Purpose of Final Dividend View/Download
Aug 21, 2021 Declaration of COD of 15 MW Capacity of Simhadri Floating Solar PV Project View/Download
Aug 02, 2021 Investor Presentation Made at the 17th Annual Analysts and Investors Meet of NTPC Limited View/Download
Jul 31, 2021 Outcome of the Board Meeting regarding Raising of Funds through issue of Non-Convertible Debentures and approval of Unaudited Financial Results (Standalone & Consolidated) of NTPC Ltd. for the Quarter ended June 30, 2021 View/Download
Jul 31, 2021 Key Performance Highlights of NTPC Ltd. for the quarter ended June 30, 2021 View/Download
Jul 30, 2021 Newspaper Publication regarding change in Registrar and Share Transfer Agent in Hindi Newspaper View/Download
Jul 29, 2021 Newspaper Publication regarding change in Registrar and Share Transfer Agent in English Newspaper View/Download
Jul 28, 2021 Announcement under Regulation 30 (LODR)-Analyst / Investor Meet – Intimation View/Download
Jul 28, 2021 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018. View/Download
Jul 28, 2021 Intimation of change in Registrar and Share Transfer Agent View/Download
Jul 26, 2021 Clarification on news item 'Madhya Pradesh: NTPC Bags 325 MW Solar Projects in Shajapur Solar Park' View/Download
Jul 23, 2021 Completion of Trial Operation by 800 MW Capacity Unit of Darlipali Super Thermal Power Project Of NTPC Limited View/Download
Jul 22, 2021 Board Meeting Intimation for Un-Audited Financial Results for the Quarter ended June 30, 2021 and Raising of Funds through Issue of Non-Convertible Debentures View/Download
Jul 22, 2021 Closure of Trading Window which were closed from July 1, 2021 shall remain closed until August 2, 2021. View/Download
Jul 22, 2021 Declaration of COD of Unit-2 of 660 MW Capacity of Nabinagar Power Generating Company Limited (Wholly Owned Subsidiary of NTPC Limited) (3 X 660 MW) View/Download
Jul 17, 2021 Cessation of Independent Directors on completion of Tenure View/Download
Jul 15, 2021 Status of investors complaints for the quarter ending 30.06.2021 View/Download
Jun 29, 2021 Intimation regarding closure of Trading Window. View/Download
Jun 28, 2021 Intimation of final Resolution Plan dated June 14, 2021 submitted by NTPC Limited for Jhabua Power Limited has been approved by the Committee of Creditors of Jhabua Power Limited as per the provisions of the Insolvency and Bankruptcy Code, 2016 View/Download
Jun 28, 2021 Completion of Trial Operation by 250 MW Capacity Unit of Barauni Thermal Power Station of NTPC Limited View/Download
Jun 28, 2021 Declaration of COD of Unit-2 of 660 MW Capacity of Tanda Super Thermal Power Station, Stage-II (2 X 660 MW) View/Download
Jun 24, 2021 Disclosure of Related Party Transactions under Regulation 23(9) of SEBI (LODR) Regulations, 2015. View/Download
Jun 19, 2021 Key Performance Highlights for the quarter and financial year ended on March 31, 2021 View/Download
Jun 19, 2021 Intimation regarding Outcome of the Board Meeting regarding recommendation of Final Dividend for the Financial Year 2020-21, Annual Audited Financia[ Results (Standalone & Consolidated) of NTPC Ltd. for the Financial Year ended March 31,2021 and Enhancement of Borrowing Limit of the Company from Rs. 2,00,000 Crore to Rs. 235,000 Crore. View/Download
Jun 19, 2021 Outcome of the Board Meeting with respect to Final Dividend FY 2020-21. View/Download
Jun 19, 2021 Intimation of Board approval for enhancement of Borrowing Limit of the Company from Rs. 2,00,000 Crore to Rs. 2,25,000 Crore subject to approval of Shareholders View/Download
Jun 16, 2021 NTPC Ltd. will hold a conference call for analysts and investors at 5:30 PM India time on June 19, 2021, where Senior Management team of NTPC comprising of Mr. A. K.Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 4th quarter and financial year 2020-21 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1149
+91 22 7115 8050
The numbers listed above are universally accessible from all networks and all countries
Toll-free number
USA
1 866 746 2133

UK
0 808 101 1573

Hong Kong
800 964 448

Singapore
800 101 2045

Express Diamond Pass link:
https://protect-eu.mimecast.com/s/EAlaCN0Bpsjz2ArcmbV1t?domain=services.choruscall.in


A transcript of the conference call will be available on Company’s websitepost the conference call.
For any further enquiries regarding the conference call, the followingmaybe contacted:
Mr. Aniket Mittal: Phone: +91 8850871895
Email: Aniket.Mittal@MotilalOswal.com

Regards
Aditya Dar
Chief General Manager(Finance)
Investor Services Department
Tel No. 011 24367072
Email: adityadar@ntpc.co.in
View
Jun 16, 2021 Intimation of Investor & Analyst Conference Call on June 19, 2021, wherein Senior Management team of NTPC Ltd. will discuss the Company’s results for Q4 and FY21. View/Download
Jun 11, 2021 Intimation of Board Meeting for recommendation of final dividend for the Financial Year 2020-21. View/Download
Jun 11, 2021 Intimation of Board Meeting to be held at New Delhi on Saturday, 19th June 2021. View/Download
Jun 11, 2021 Closure of Trading Window. View/Download
Apr 26, 2021 Compliance Certificate Under Regulation 7(3) Of Securities And Exchange Board Of India (Listing Obligations And Disclosure Requirements) Regulations, 2015 For The Half-Year Ended 31.3.2021. View/Download
Apr 26, 2021 Intimation of Initial Disclosure and Annual Disclosure to be made by an entity identified as a Large Corporate View/Download
Apr 26, 2021 Compliance Certificate for the half year ended 31.03.2021. View/Download
Apr 26, 2021 Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Apr 19, 2021 Declaration of COD of Last Part Capacity of 15 MW of 85 MW Bilhaur Solar PV Project View/Download
Apr 16, 2021 Intimation of NTPC’s decision to issue unsecured non-convertible bonds in the nature of debentures of Rs.3,996 crore on 20 April, 2021, through private placement at a coupon of 6.87% p.a. with a door to door maturity of 15 years 1 day on 21 April, 2036 View/Download
Apr 13, 2021 Status of investors complaints for the quarter ending 31.03.2021 View/Download
Apr 05, 2021 Intimation of successful completion of Trial Operation by Unit-2 of 660 MW Capacity of Tanda Super Thermal Power Station, Stage-II (2 X 660 MW View/Download
Apr 01, 2021 Intimation of successful completion Of Trial Operation By Unit-2 Of 660 MW Capacity Of Nabinagar Super Thermal Power Project (3 X 660 MW) Of Nabinagar Power Generating Co. Limited (A Wholly Owned Subsidiary Of NTPC Limited) View/Download
Mar 31, 2021 Declaration of COD of First Part Capacity of 70 MW of 85 MW Bilhaur Solar PV Project View/Download
Mar 30, 2021 Intimation regarding Closure of Trading Window View/Download
Mar 30, 2021 Intimation of discontinuance of operations of Talcher Thermal Power Station, Odisha having total installed capacity of 460 MW w.e.f. 31st March, 2021 View/Download
Feb 26, 2021 Declaration of COD of Unit-2 of 800 MW Capacity of Gadarwara Super Thermal Power Station (2 X 800 MW) View/Download
Feb 23, 2021 Intimation regarding execution of Share Purchase Agreements by NTPC Ltd. with GAIL (India) Limited (GAIL) on 23rd February, 2021, for purchase of GAIL's share (25.51%) in Ratnagiri Gas and Power Pvt. Ltd. (RGPPL) and Sale of NTPC's share (14.82%) (on fully dilutive basis) in Konkan LNG Ltd. (KLL) View/Download
Feb 20, 2021 Declaration of COD of Last Part Capacity of 5 MW For 20 MW Auraiya Solar PV Project View/Download
Feb 18, 2021 Successful Completion of Trial Operation By Unit-2 of 800 MW Capacity of Gadarwara Super Thermal Power Project View/Download
Feb 12, 2021 Declaration of COD of Unit-4 of 150 MW of Kameng Hydro-Electric Project (4X150 MW) of North Eastern Electric Power Corporation Limited View/Download
Feb 08, 2021 Damage to under Construction Power Project at Tapovan Vishnugad (520 MW) due to Natural Calamity View/Download
Feb 04, 2021 Outcome of the Board Meeting for declaration of Interim Dividend and Unaudited Financial Results for the quarter and nine months ended December 31, 2020 View/Download
Feb 04, 2021 Outcome of the Board Meeting for payment of interim dividend at the rate of 30% (Rs.3/- per share) on the face value of paid-up equity shares of Rs. 10/- each for the financial year 2020-21. View/Download
Feb 04, 2021 Key Performance Highlights of NTPC Ltd. for the Quarter and Nine-month ended on December 31, 2020 View/Download
Jan 29, 2021 Newspaper Publication regarding fixation of record date for the purpose of Interim Dividend payment of Interim Dividend for the year 2020-21 View/Download
Jan 29, 2021 Intimation of Investor and Analyst Conference call on February 4, 2021, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q3 FY21 View/Download
Jan 29, 2021 NTPC Ltd. will hold a conference call for analysts and investors at 4:00 PM India time on February 4, 2021, where Senior Management team of NTPC comprising of Mr. A. K. Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 3rd quarter of the financial year 2020-21 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1144
+91 22 7115 8045
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 70 4567 1221
USA Toll-free number
1 866 746 2133
UK 0 808 101 1573
Hong kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

https://services.choruscall.in/DiamondPassRegistration/register?confirmationNumber=8109257&linkSecurityString=1957083595

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Mr. Rahul Modi: Phone: +91 7738096775
Email: rahul.modi@icicisecurities.com



Regards
Aditya Dar
Chief General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Jan 29, 2021 Declaration of COD of Unit-2 of 660 MW Capacity of Meja Thermal Power Station View/Download
Jan 29, 2021 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018. View/Download
Jan 27, 2021 Intimation regarding Fixation of Record Date for payment of Interim Dividend for the year 2020-21, if any View/Download
Jan 27, 2021 Board Meeting Intimation:
· Un-Audited Financial Results for the Quarter and Nine-Months ended December 31, 2020.
· Declaration Of Interim Dividend for the Financial Year 2020-21.
View/Download
Jan 27, 2021 Intimation regarding Closure of Trading Window View/Download
Jan 27, 2021 Declaration of COD of 140 MW Capacity Bilhaur Solar PV Project View/Download
Jan 27, 2021 Intimation regarding holding of Meeting of the Board of Directors to consider interim dividend for the financial year 2020-21 View/Download
Jan 22, 2021 Intimation regarding NTPC’s decision to issue unsecured non-convertible bonds in the nature of debentures of Rs.2,500 crore on 27 January, 2021, through private placement View/Download
Jan 22, 2021 Declaration of COD of Unit-3 of 150 MW of Kameng Hydro-Electric Project (4X150 MW) of North Eastern Electric Power Corporation Limited View/Download
Jan 18, 2021 Status of investors complaints for the quarter ending 31.12.2020 View/Download
Jan 15, 2021 Successful Completion of Trial Operation by Unit-2 of 660 MW Capacity of Meja Thermal Power Project View/Download
Jan 14, 2021 Declaration of COD of 50 MW Capacity by THDC India Limited View/Download
Jan 08, 2021 Announcement under Regulation 30 (LODR)-Scheme of Arrangement for the amalgamation of Nabinagar Power Generating Company Limited (NPGC) and Kanti Bijlee Utpadan Nigam Limited (KBUNL) View/Download
Jan 01, 2021 Completion of extinguishment of total of 19,78,91,146 fully paid up equity shares of Rs. 10 each of NTPC Limited ('company') and reconciliation of the share capital of the company View/Download
Jan 01, 2021 Intimation regarding execution of agreement by NTPC Ltd. for a Composite Resolution Plan with lenders of Ratnagiri Gas & Power Pvt. Ltd. (RGPPL), a Joint Venture Company of NTPC engaged in generation of Power, and RGPPL on 31.12.2020 View/Download
Dec 31, 2020 Post Buyback Public Announcement View/Download
Dec 28, 2020 Intimation regarding closure of Trading Window View/Download
Dec 28, 2020 Declaration of COD of Dulanga Coal Mine View/Download
Dec 22, 2020 Announcement of Settlement in relation to the Cash Tender Offer by NTPC Limited ('Company') in respect of (I) INR Denominated 2000 Crore 7.375 per cent notes issued on August 10, 2016 payable in U.S. Dollars and due on August 10, 2021 ('2021 Notes'), and (II) INR Denominated 2000 Crore 7.25 per cent notes issued on May 3, 2017 payable in U.S. Dollars and Due on May 3, 2022 ('2022 Notes', collectively with the 2021 Notes, The 'Notes') of the Company View/Download
Dec 18, 2020 Announcement of the Reference Rate and USD Equivalent of the Purchase Price and the Additional Interest amount in relation to the Cash Tender Offer by NTPC Limited ('Company') in Respect of (I) INR Denominated 2000 Crore 7.375 per cent Notes issued on August 10, 2016 payable in U.S. Dollars and due on August 10, 2021 ('2021 Notes'), and (II) INR Denominated 2000 Crore 7.25 per cent Notes issued on May

3, 2017 payable in U.S. Dollars and due on May 3, 2022 ('2022 Notes', collectively with the 2021 Notes, The 'Notes') of the Compan
View/Download
Dec 16, 2020 Intimation of Results of Cash Tender Offer by NTPC Limited ('Company') in respect of (I) INR Denominated 2000 Crore 7.375 per cent Notes issued on August 10, 2016 payable in U.S. Dollars and due on August 10, 2021 ('2021 Notes'), and (II) INR Denominated 2000 Crore 7.25 per cent Notes issued on May 3, 2017 payable in U.S. Dollars and due on May 3, 2022 ('2022 Notes', Collectively with the 2021 Notes, The 'Notes') of the Company View/Download
Dec 07, 2020 Intimation of Proposed Cash Tender Offer by NTPC Limited ('Company') in respect of (I) INR Denominated 2000 Crore 7.375 per cent Notes issued on August 10, 2016 Payable in U.S. Dollars and due on August 10, 2021 ('2021 Notes'), and (II) INR Denominated 2000 Crore 7.25 per cent notes issued on May 3, 2017 payable in U.S. Dollars and due on May 3, 2022 ('2022 Notes', Collectively with the 2021 Notes, The 'Notes') of the Company View/Download
Dec 07, 2020 Disclosure of Announcements of Proposed Cash Tender offer by NTPC Limited (The 'Company') in respect of (I) INR Denominated 2000 Crore 7.375 per cent Notes issued in August 10, 2016 payable in U.S. Dollars and due on August 10, 2021 ('2021 Notes'), and (II) INR Denominated 2000 Crore 7.25 per cent Notes issued on May 3, 2017 Payable in U.S. Dollars and due on May 3, 2022 ('2022 Notes', collectively with the 2021 Notes, The 'Notes') of the Company. View/Download
Dec 03, 2020 Newspaper Publication dated December 2, 2020 regarding the completion of the dispatch of the Letter of Offer along with Tender Form electronically to the eligible shareholders. View/Download
Nov 26, 2020 IDBI Capital Markets & Securities Ltd ("Manager to the Buyback Offer") has submitted to BSE a copy of Letter of Offer to the Eligible Shareholder of NTPC Ltd ("Target Company"). View/Download
Nov 26, 2020 Related party transactions of NTPC Limited on standalone and consolidated basis, for the period ending 30.09.2020. View/Download
Nov 10, 2020 Declaration of Commercial Operation of First Part Capacity of 8 MW for 20 MW Auraiya Solar PV Project View/Download
Nov 10, 2020 IDBI Capital Markets & Securities Ltd ("Manager to the Buyback Offer") has submitted to BSE a copy of Draft Letter of Offer to the Eligible Shareholder of NTPC Ltd (the “Company”). View/Download
Nov 06, 2020 Declaration of Commercial Operation of Unit-2 (800 MW) of Lara Super Thermal Power Station Stage-I (2 X 800 MW) View/Download
Nov 04, 2020 Public Announcement for Buyback of Equity Shares View/Download
Nov 03, 2020 Buyback of Equity Shares by NTPC Limited-Board Resolution View/Download
Nov 02, 2020 Key Performance Highlights for the Quarter and Half-Year Ended on September 30, 2020. View/Download
Nov 02, 2020 Extension of Tenure of Chairman & Managing Director of NTPC Limited View/Download
Nov 02, 2020 Intimation of Record Date for Buy Back of shares. View/Download
Nov 02, 2020 Submission of Unaudited Financial Results for the quarter and half-year ended September 30,2020 View/Download
Nov 02, 2020 Outcome of the Board Meeting regarding approval of Buy back of equity shares View/Download
Oct 29, 2020 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Oct 29, 2020 Compliance Certificate Under Regulation 7(3) Of Securities And Exchange Board Of India (Listing Obligations And Disclosure Requirements) Regulations, 2015 For The Half-Year Ended 30.9.2020 View/Download
Oct 29, 2020 Compliance Certificate under Regulation Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the half Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the half-year ended 30.9.2020 View/Download
Oct 27, 2020 NTPC Ltd. will hold a conference call for analysts and investors at 4:00 PM India time on November 2, 2020, where Senior Management team of NTPC comprising of Mr. A. K.Gautam, Director (Finance), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations), Mr. Chandan Kumar Mondol, Director (Commercial) and Mr. Ujjwal Kanti Bhattacharya, Director (Projects) will discuss the Company’s results for the 2nd quarter of the financial year 2020-21 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1366
+91 22 7115 8267
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 70 4567 1221
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong Kong 800 964 448
Singapore 800 101 2045
Express Diamond Pass link:

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Subhadip Mitra
JM Financial
Tel. No.: +91 99203 71882
(subhadip.mitra@jmfl.com)

Regards
Aditya Dar
Chief General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Email: adityadar@ntpc.co.in
View
Oct 27, 2020 Newspaper Publication regarding Intimation of Board Meeting View/Download
Oct 27, 2020 intimation of Investor & Analyst Conference call on November 2, 2020, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for Q2 FY21 View/Download
Oct 26, 2020 Board Meeting intimation for Un-Audited Financial Results for the Quarter and Half Year ended September 30, 2020 and proposal for Buyback of Equity Shares of the Company. View/Download
Oct 26, 2020 Intimation regarding holding of Meeting of the Board of Directors for closure of trading window. View/Download
Oct 23, 2020 Intimation regarding order passed by SEBI on the application filed by NTPC seeking exemption/relaxation of provisions of Regulation 24(ii) of the Securities and Exchange Board of India (Buy-back of Securities) Regulations, 2018. View/Download
Oct 13, 2020 Intimation regarding NTPC’s decision to raise Rs.4,000 crore on 15 October, 2020, through private placement of unsecured non-convertible bonds in the nature of debentures at a coupon of 5.45% p.a. with a door to door maturity of 5 years on 15 October 2025. View/Download
Oct 12, 2020 Status of investors complaints for the quarter ending 31.12.2020 View/Download
Oct 08, 2020 Intimation regarding incorporation of NTPC’s wholly owned subsidiary, in the name of 'NTPC Renewable Energy Limited' with the Registrar of Companies, NCT of Delhi & Haryana on October 7, 2020, to undertake Renewable Energy Business. View/Download
Sep 29, 2020 Intimation regarding closure of Trading Window View/Download
Sep 25, 2020 voting results in respect of items of business transacted at the 44th Annual General Meeting of the Company View/Download
Sep 24, 2020 Proceedings of 44th Annual General Meeting of the Company View/Download
Sep 08, 2020 Intimation of cessation of Independent Directors due to completion of tenure View/Download
Sep 02, 2020 Intimation regarding Notice published in newspapers on 2nd September, 2020 in respect of 44th Annual General Meeting of the Company scheduled to be held on 24th September, 2020. View/Download
Aug 31, 2020 Intimation of notice of 44th Annual General Meeting to be held though Video Conferencing (VC) / Other Audio Visual Means (OAVM) along with the Integrated Annual Report of the Company for the Financial Year 2019-20 View/Download
Aug 31, 2020 Reg. 34 (1) Annual Report View/Download
Aug 31, 2020 Book Closure for the purpose of AGM View/Download
Aug 28, 2020 Intimation of appointment of Shri Ujjwal Kanti Bhattacharya, Executive Director, NTPC to the post of Director (Projects), NTPC Limited View/Download
Aug 21, 2020 Intimation of concurrence obtained from NITI Aayog, Government of India and Department of Investment and Public Asset Management (DIPAM), Ministry of Finance, Government of India, for formation of a wholly owned subsidiary for NTPC Renewable Energy Business. View/Download
Aug 20, 2020 Press Release / Media Release in respect of 44th Annual General Meeting of the Company scheduled to be held on 24th September, 2020 View/Download
Aug 17, 2020 Investor Presentation made at the 16th Annual Analysts and Investors Meet of NTPC Limited View/Download
Aug 14, 2020 Outcome of the Board Meeting regarding Unaudited Financial Results for the Quarter ended June 30, 2020 View/Download
Aug 14, 2020 Key Performance Highlights of NTPC Limited for the Quarter ended June 30, 2020 View/Download
Aug 14, 2020 Appointment of Statutory Auditor/s View/Download
Aug 13, 2020 Intimation of 16th Analysts and Investors Meet on 17th August 2020 through video conferencing, wherein CMD and Board of Directors of the company will interact with the Analysts and Investors View/Download
Aug 08, 2020 Newspaper Publication regarding notice of Board Meeting View/Download
Aug 06, 2020 Newspaper Publication regarding Record Date for Final Dividend View/Download
Aug 03, 2020 Intimation of Record Date for the purpose of final Dividend for the Financial Year 2019- 20 View/Download
Aug 01, 2020 Intimation regarding cessation of Shri A. K. Gupta as Director (Commercial) of NTPC due to attaining age of superannuation View/Download
Aug 01, 2020 Intimation of appointment of Shri Chandan Kumar Mondol, Executive Director, NTPC to the post of Director (Commercial), NTPC Limited View/Download
Jul 29, 2020 Intimation of NTPC’s decision to raise Rs.1,000 crore on 31 July, 2020, through private placement of unsecured non-convertible bonds in the nature of debentures View/Download
Jul 21, 2020 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Jul 20, 2020 800 MW Unit of Lara Super Thermal Power Project added to Installed Capacity of NTPC View/Download
Jul 16, 2020 Press Release / Media Release regarding NTPC enters pact with NIIF to explore business opportunities in India View/Download
Jul 15, 2020 Status of investors complaints for the quarter ending 30.09.2020 View/Download
Jul 01, 2020 Declaration of Commercial Operation of Unit-2 Of 150 MW of Kameng Hydro-Electric Project (4X150 MW) of North Eastern Electric Power Corporation Limited View/Download
Jun 30, 2020 Disclosure Of Related Party Transactions of NTPC Limited on standalone and consolidated basis, for the period ending 31.03.2020 View/Download
Jun 30, 2020 Intimation regarding closure of Trading Window. View/Download
Jun 27, 2020 The Board of Directors have recommended final dividend of Rs. 2.65 per equity share for the financial year 2019-20, subject to approval of the Shareholders in the ensuing Annual General Meeting View/Download
Jun 27, 2020 Submission of Annual Audited Results (Standalone and Consolidated) of NTPC Ltd. for the Financial Year ended March 31, 2020 and Recommendation of Final Dividend for the Financial Year 2019-20. View/Download
Jun 27, 2020 Key Performance Highlights of NTPC Limited for the Quarter and Year ended 31.03.2020 View/Download
Jun 26, 2020 Disclosure Of Impact Of COVID-19 Pandemic View/Download
Jun 25, 2020 Intimation of Investor & Analyst Conference Call on June 27, 2020, wherein Senior Management team of NTPC Ltd. will discuss the Company’s results for Q4 FY20 View/Download
Jun 25, 2020 Intimation of Annual Disclosure to be made by an entity identified as a Large Corporate View/Download
Jun 25, 2020 NTPC Ltd. will hold a conference call for analysts and investors at 3.30 PM India time on June 27, 2020, where Senior Management team of NTPC comprising of Mr. A. K.Gautam, Director (Finance), Mr. A.K. Gupta, Director (Commercial), Mr. Dillip Kumar Patel, Director (Human Resources), Mr. Ramesh Babu V., Director (Operations) and Mr. R.S.V. Muthumani, Executive Director (Finance) will discuss the Company’s results for the 4th quarter and the financial year 2019-20 and answer questions from the participants

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions for asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1342
+91 22 7115 8243
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 70 4567 1221
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong Kong 800 964 448
Singapore 800 101 2045
A transcript of the conference call will be available on Company’s website post the conference call

For any further enquiries regarding the conference call the following may be contacted:

Rohit Natarajan
Antique Stock Broking Limited
Tel. No.: +91 22 4031 3443
(rohit.natarajan@antiquelimited.com)

Regards
Aditya Dar
Chief General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 1018
Email: adityadar@ntpc.co.in
-
Jun 24, 2020 Board Meeting Intimation for Annual Standalone and Consolidated Financial Statements and recommendation Of Dividend for the Year ended on March 31, 2020 & Closure of Trading Window View/Download
Jun 23, 2020 Intimation of Credit Rating View/Download
Jun 17, 2020 Declaration of Commercial Operation of Unit-1 of 150 MW of Kameng Hydro-Electric Project (4X150 MW) of North Eastern Electric Power Corporation Limited View/Download
Jun 15, 2020 Annual Secretarial Compliance Report for the year ended March 31,2020 View/Download
Jun 10, 2020 Update on Deferment of Capacity Charges and Rebate to Discoms View/Download
Jun 03, 2020 Intimation of Credit Rating View/Download
Jun 02, 2020 Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018 View/Download
Jun 01, 2020 NTPC Limited (NTPC) has incorporated a Joint Venture Company with East Delhi Municipal Corporation (EDMC) with equity participation of 74:26 respectively, in the name of 'NTPC EDMC Waste Solutions Private Limited View/Download
May 23, 2020 Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year Ended 31.3.2020 View/Download
May 22, 2020 Press Release / Media Release NTPC has signed a MOU with ONGC to set up Joint Venture Company for Renewable Energy Business View/Download
May 21, 2020 Compliance Certificate under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year Ended 31.3.2020 View/Download
May 17, 2020 Corporate Disclosure regarding NTPC has received advisory/letters dated 15.05.2020 and 16.05.2020 from Ministry of Power View/Download
May 01, 2020 Intimation of Change in Directorate regarding appointment of Shri Ramesh Babu V, Executive Director, NTPC to the post of Director (Operations), NTPC Limited View/Download
May 01, 2020 Intimation of Change in Directorate regarding cessation of Shri Prakash Tiwari as Director (Operations) of NTPC on 30.4.2020 (A/N) on attaining the age of superannuation. View/Download
Apr 17, 2020 Status of investors complaints for the quarter ended 31.03.2020 View/Download
Apr 13, 2020 Intimation regarding NTPC’s decision to raise Rs. 4,374.10 crore on 16 April, 2020 through private placement of unsecured non-convertible bonds in the nature of debentures View/Download
Apr 03, 2020 Declaration of Commercial Operation of Unit-2 (660 MW) of Khargone Super Thermal Power Station (2 X 660 MW) View/Download
Apr 01, 2020 Intimation of Change in Directorate regarding appointment of Shri Dillip Kumar Patel, GM, NTPC to the post of Director (Human Resources), NTPC Limited View/Download
Apr 01, 2020 Intimation of Change in Directorate regarding cessation of Shri Saptarshi Roy as Director (HR) of NTPC on 31.3.2020 (A/N) on attaining the age of superannuation. View/Download
Mar 30, 2020 Closure of Trading Window View/Download
Mar 28, 2020 Updates on Acquisition- NTPC Limited has completed acquisition of entire equity stake of Government of India in NEEPCO and THDC i.e. 100% of paid-up equity share capital of NEEPCO and 74.496% of paid-up equity share capital of THDC. View/Download
Mar 28, 2020 Addition to NTPC's Installed and Commercial Capacity Post-Acquisition of THDC & NEEPCO View/Download
Mar 26, 2020 Updates on Acquisition- The Company has, on March 25, 2020, executed a Share Purchase Agreement with the President of India for acquisition of legal and beneficial ownership of 3,60,98,09,800 equity shares held by the President of India in North Eastern Electric Power Corporation Ltd. (NEEPCO) View/Download
Mar 26, 2020 Updates on Acquisition- The Company has, on March 25, 2020, executed a Share Purchase Agreement with the President of India for acquisition of legal and beneficial ownership of 2,73,09,406 equity shares held by the President of India in THDC India Limited (THDCIL) View/Download
Mar 25, 2020 2nd Unit Of 660 MW of Khargone Super Thermal Power Project added to Installed Capacity of NTPC View/Download
Mar 20, 2020 Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011 for ICICI Prudential Mutual Fund View/Download
Mar 20, 2020 Update on Acquisition- Board of Directors has, in its meeting held on March 19, 2020, accorded approval for acquisition of entire stake of the Government of India in THDC India Limited (THDCIL) and North Eastern Electric Power Corporation Ltd. (NEEPCO) View/Download
Mar 19, 2020 Newspaper Publication in respect of record date for payment of Interim dividend for FY 2019-20 View/Download
Mar 19, 2020 Outcome of the Board Meeting regarding approval of payment of interim dividend for FY 2019-20 View/Download
Mar 18, 2020 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for Nippon Life India Asset Management Ltd View/Download
Mar 12, 2020 Intimation of Record Date for Interim Dividend FY 2019-20 View/Download
Mar 12, 2020 Corporate Action-Board to consider Dividend FY 2019-20 View/Download
Mar 12, 2020 Closure of Trading Window View/Download
Mar 12, 2020 Board Meeting Intimation for Consideration of Interim Dividend FY 2019-20 View/Download
Mar 05, 2020 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for The President of India, acting through Ministry of Power, Government of India View/Download
Feb 29, 2020 Declaration of Commercial Operation of 800 MW Unit#1 of Darlipalli Super Thermal Power Station Stage-I (2 X 800 MW) View/Download
Feb 28, 2020 Declaration of Commercial Operation of 250 MW Unit of Barauni Thermal Power Station Stage-II (2 X 250 MW) View/Download
Feb 10, 2020 In continuation of our letter of even no. dated 28.01.2020 and 07.02.2020, this is to inform you that the Board, in its Meeting held on 07.02.2020, has not considered the payment of interim dividend on the equity share capital of the Company for the year 2019-20.

Further, record date earlier intimated as Monday, February 17, 2020 may be treated as cancelled.
-
Feb 10, 2020 Disclosure under Regulation 7(2)(b) of SEBI (Prohibition of Insider Trading) Regulations, 2015

Pursuant to Regulation 7(2)(b) of Securities and Exchange Board of India (Prohibition of Insider Trading) Regulations, 2015, please find attached the disclosure in Form C under Regulation 7(2)(a) of the aforesaid Regulations furnished by the Ministry of Power acting on behalf of the President of India, Government of India for off-market sale of 30,87,48,936 equity shares of NTPC through CPSE ETF managed by Nippon Life India Asset Management Limited.

The shareholding of President of India, Government of India in NTPC, after above sale, is 5,04,80,97,508 shares (51.02%).
View/Download
Feb 07, 2020 Key Performance Highlights of NTPC Limited for the Quarter and Nine-months ended 31.12.2019 View/Download
Feb 07, 2020 Submission Of Unaudited Financial Results For The Quarter And Nine-Month Ended December 31, 2019 View/Download
Feb 07, 2020 Outcome of Board Meeting Held on 07.02.2020 View/Download
Feb 05, 2020 Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011 for Nippon Life India Asset Management Ltd View/Download
Jan 31, 2020 Declaration of Commercial Operation of Unit-1 (660 MW) of Khargone Super Thermal Power Station (2 X 660 MW) View/Download
Jan 30, 2020 NTPC Ltd. will hold a conference call for analysts and investors at 3.30 PM India time, on February 7, 2020, where Senior Management team of NTPC comprising of Mr. A.K.Gautam, Director (Finance), Mr. S. Roy, Director (Human Resources), Mr. A.K. Gupta, Director (Commercial), Mr. Prakash Tiwari, Director (Operations) and Mr. R.S.V.Muthumani, Executive Director (Finance) will discuss the Company’s results for the 3rd quarter of the financial year 2019-20 and answer questions from the participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number/Secondary + 91 22 6280 1222
+ 91 22 7115 8123
Local Dial In (Available all over India) + 91 70456 71221
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong Kong 800 964 448
Singapore 800 101 2045
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call, the following may be contacted:

Kunal Sheth/Mayank Bhandari
Batlivala & Karani Securities India Pvt. Ltd.
Tel. No.: +91 22 4031 7263
(kunal.sheth@bksec.com/mayank.bhandari@bksec.com)

Regards
Aditya Dar
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 1018
Email: adityadar@ntpc.co.in
-
Jan 30, 2020 Corporate Disclosure - Con Cal Q3 FY20 View/Download
Jan 29, 2020 Intimation of fixing of Record date as February 17, 2020, for the purpose of Payment of Interim Dividend, if declared by the Board. View/Download
Jan 28, 2020 Closure of Trading Window View/Download
Jan 28, 2020 Newspaper publication regarding Notice of Board Meeting View/Download
Jan 28, 2020 Board Meeting Intimation for Un-Audited Financial Results for the Quarter & Nine-Months period ended 31.12.2019
Declaration of Interim Dividend for the Financial Year 2019-20 and Fixation of Record Date for the Year 2019-20, If Any
Closure Of Trading Window
View/Download
Jan 27, 2020 Outcome of Board Meeting held on 27/01/2020 View/Download
Jan 23, 2020 Intimation of appointment of Shri Ashish Upadhyaya, AS & FA, Ministry of Power as Government Nominee Director on the Board of NTPC View/Download
Dec 31, 2019 800 MW Unit of Darlipali Super Thermal Power Project added to Installed Capacity of NTPC View/Download
Dec 23, 2019 Closure of Trading Window View/Download
Dec 02, 2019 Disclosure Of Related Party Transactions of NTPC Limited on standalone and consolidated basis, for the period ending 30 September 2019. View/Download
Dec 02, 2019 Cessation of Shri Susanta Kumar Roy as Director (Projects) of NTPC Limited on attaining the age of superannuation, on 30.11.2019 (A/N). View/Download
Nov 29, 2019 250 MW Unit of Barauni Thermal Power Station added to Installed Capacity of NTPC View/Download
Nov 15, 2019 Announcement under Regulation 30 (LODR)-Cessation one-year tenure of Dr. (Ms.) Gauri Trivedi as Independent Director View/Download
Nov 09, 2019 Key Performance Highlights of NTPC Limited for the Quarter and Half-Year Ended 30.09.2019. View/Download
Nov 09, 2019 Outcome of the Board Meeting regarding Unaudited Financial Results for the Quarter and Half Year ended 30.09.2019 View/Download
Nov 09, 2019 Intimation of Board Approval of NTPC (Transferee Company) for Amalgamation of Nabinagar Power Generating Company Limited ('Transferor Company 1') and Kanti Bijlee Utpadan Nigam Limited (or 'Transferor Company 2') (collectively, 'Transferor Companies' View/Download
Nov 07, 2019 Declaration of Commercial Operation of Unit-1 (660 MW) of Tanda Super Thermal Power Station, Stage-II (2 X 660 MW) View/Download
Oct 31, 2019 NTPC Ltd. will hold a conference call for analysts and investors at 4.30 PM India time, on November 9, 2019, where Senior Management team of NTPC comprising of Mr. A.K.Gautam, Director (Finance), Mr. S. Roy, Director (Human Resources), Mr. A.K. Gupta, Director (Commercial), Mr. S. K. Roy, Director (Projects), Mr. Prakash Tiwari, Director (Operations) and Mr. R.S.V.Muthumani, Executive Director (Finance) will discuss the Company’s results for the 2nd quarter of the financial year 2019-20 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number/Secondary + 91 22 6280 1123
+ 91 22 7115 8024
The numbers listed above is universally accessible from all networks and all countries
Toll-free number
USA 1 866 746 2133
UK 0 808 101 1573
Hong Kong 800 964 448
Singapore 800 101 2045
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following may be contacted:

Swarnim Maheshwari
Edelweiss Securities Ltd.
Tel. No.: +91 22 4040 7418
Fax. No.:+91 22 2286 4310
(swarnim.maheshwari@edelweissfin.com)

Regards
Aditya Dar
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 1018
Email: adityadar@ntpc.co.in
-
Oct 31, 2019 Corporate Disclosure - Con Cal Q2 FY20 View/Download
Oct 31, 2019 Intimation of newspaper publication regarding notice of Board Meeting View/Download
Oct 30, 2019 Closure of Trading Window View/Download
Oct 30, 2019 Board Meeting Intimation for Intimation Regarding Holding Of Meeting Of The Board Of Directors And Closure Of Trading Window For Insiders View/Download
Oct 25, 2019 Announcement under Regulation 30 (LODR)-Joint Venture:- NTPC has entered into a Joint Venture & Shareholders’ Agreement with the Ceylon Electricity Board for incorporation of 50:50 Joint Venture Company View/Download
Oct 18, 2019 Announcement under Regulation 30 (LODR)-Change in Directorate Shri Anil Kumar Gautam has taken over the charge as Director (Finance), NTPC with effect from 18th October 2019 View/Download
Oct 17, 2019 The status of investors complaints/grievances for the quarter ending 30.09.2019. View/Download
Oct 16, 2019 Disclosure under Regulation 7(2)(b) of SEBI (Prohibition of Insider Trading) Regulations, 2015

Pursuant to Regulation 7(2)(b) of Securities and Exchange Board of India (Prohibition of Insider Trading) Regulations, 2015, please find attached the disclosure in Form C under Regulation 7(2)(a) of the aforesaid Regulations furnished by the Ministry of Power acting on behalf of the President of India, Government of India for off-market sale of 3,60,73,713 equity shares of NTPC through Bharat 22 ETF Scheme managed by ICICI Prudential Asset Management Company Limited.

The shareholding of President of India, Government of India in NTPC, after above sale, is 5,35,68,46,444 shares (54.14%).
View/Download
Oct 16, 2019 Compliance Certificate Under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ended 30.09.2019 View/Download
Oct 16, 2019 Compliance Certificate under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ended 30.09.2019 View/Download
Oct 03, 2019 Capacity Addition of the Tanda Unit-1 Stage-II & Khargone Unit-1 of NTPC LTD. View/Download
Sep 29, 2019 Declaration of Commercial Operation of Unit-1 of 800 MW of Lara Super Thermal Power Station (2 X 800 MW) View/Download
Sep 27, 2019 Declaration of Commercial Operation of Unit-1 of 800 MW of Lara Super Thermal Power Station (2 X 800 MW) View/Download
Sep 23, 2019 Closure of Trading Window View/Download
Sep 13, 2019 Minutes of 43rd AGM View/Download
Sep 05, 2019 Declaration of Commercial Operation of Unit-1 (660 MW) of Nabinagar Super Thermal Power Project (3 X 660 MW) of Nabinagar Power Generating Co. Limited View/Download
Aug 30, 2019 Corporate Disclosure regarding NTPC Limited has incorporated a wholly owned subsidiary in the name of 'NTPC Mining Limited' with Registrar of Companies, NCT of Delhi on 29th August 2019 for taking up coal mining business. View/Download
Aug 23, 2019 Ministry of Power, through Order No. 8/20/2018-Th.l dated 22.08.2019 has informed that the competent authority has decided to abolish the post of Director (Technical),NTPC Limited View/Download
Aug 22, 2019 Intimation regarding Appointment of Statutory Auditors View/Download
Aug 22, 2019 Shareholder Meeting / Postal Ballot-Scrutinizer''s Report in respect of items of business transacted at the 43rd Annual General Meeting of the Company held on Wednesday, 21st August, 2019 View/Download
Aug 21, 2019 Proceedings of 43rd Annual General Meeting of the Company held on 21.08.2019 View/Download
Aug 19, 2019 Investor Presentation Made at The 15th Annual Analysts and Investors Meet View/Download
Aug 13, 2019 Cessation of Shri K. Sreekant, Director (Finance), Additional Charge View/Download
Aug 10, 2019 Key Performance Highlights of NTPC Ltd. for the Quarter ended June 30, 2019 View/Download
Aug 10, 2019 Outcome of the Board Meeting regarding Unaudited Financial Results for the Quarter ended June 30, 2019 View/Download
Aug 09, 2019 Announcement under Regulation 30 (LODR)-Analyst / Investor Meet - Intimation View/Download
Aug 05, 2019 Intimation regarding newspaper publication for Notice of Board Meeting View/Download
Aug 02, 2019 Board Meeting Intimation for Approve And Take On Record The Un-Audited Financial Results Of The Company For Quarter Ended On June 30, 2019 View/Download
Aug 02, 2019 Closure of Trading Window View/Download
Aug 01, 2019 Announcement under Regulation 30 (LODR)-Change in Management -Cessation of Shri P.K. Mohapatra as Director (Technical) of NTPC -Appointment of Shri A.K. Gautam as Chief Financial Officer of NTPC View/Download
Jul 31, 2019 Clarification on News Item "Coal Crunch Shuts Down Three Units of NTPC'S Plant in Odisha'S Kaniha" View/Download
Jul 31, 2019 Announcement under Regulation 30 (LODR)-Cessation Consequent upon pre-mature retirement, Shri Sudhir Arya, Chief Financial Officer has been released from the services of the Company w.e.f. 29.07.2019 (A/N). View/Download
Jul 29, 2019 Compliance Under Regulation 47 of SEBI (Listing Obligations & Disclosure Requirements) Regulations, 2015 Copies of notices published in newspapers on 29th July, 2019 in respect of 43rd Annual General Meeting of the Company View/Download
Jul 22, 2019 Corporate Action - Book Closure From August 15, 2019 To August 21, 2019 (Both Days Inclusive) View/Download
Jul 22, 2019 Reg. 34 (1) Annual Report View/Download
Jul 18, 2019 Announcement under Regulation 30 (LODR)-Cessation Shri Anurag Agarwal (DIN: 01360908) Additional Secretary & Financial Adviser, Ministry of Power as Govt. Nominee Director View/Download
Jul 17, 2019 The status of investors complaints/grievances for the quarter ending 30.06.2019. View/Download
Jul 16, 2019 Capacity Addition of 1St Unit of 660 MW of Nabinagar Super Thermal Power Project (3X660 MW) of Nabinagar Power Generating Company Limited View/Download
Jul 15, 2019 Corporate Disclosure regarding NTPC has decided to raise Rs. 4,300 crore through private placement of secured non-convertible bonds in the nature of debentures View/Download
Jul 03, 2019 Compliances-Reg. 39 (3) - Details of Loss of Certificate Duplicate Certificate View/Download
Jul 02, 2019 Intimation regarding appointment of Shri Anurag Agarwal, Additional Secretary & Financial Adviser, Ministry of Power as Government Nominee Director on the Board of the Company View/Download
Jul 02, 2019 Closure of Trading Window View/Download
Jun 25, 2019 Corporate Disclosure: NTPC Wins 40 MW Solar Capacities in UPNEDA'S 500 MW Tender View/Download
Jun 24, 2019 Announcement under Regulation 30 (LODR)-Joint Venture Agreement with Power Grid Corporation of India Limited (POWERGRID) to incorporate a Joint Venture Company (JVC) between NTPC and POWERGRID View/Download
Jun 24, 2019 Cessation of Shri Seethapathy Chander as Independent Director of NTPC due to completion of tenure View/Download
Jun 20, 2019 NTPC Wins 160 MW Solar Capacities in Solar Energy Corporation of India's (SECI) Rajasthan Tranche-II, 750MW Tender View/Download
Jun 20, 2019 Disclosure Of Related Party Transactions of NTPC Limited on standalone and consolidated basis, for the period ending 31 March 2019 View/Download
Jun 12, 2019 Intimation with respect to signing of a Joint Venture Agreement by NTPC with East Delhi Municipal Corporation (EDMC) to incorporate a Joint Venture Company (JVC) between NTPC and EDMC View/Download
Jun 12, 2019 Investment Approval of 100 MW Ramagundam Floating Solar PV Project, Phase-I View/Download
Jun 01, 2019 Declaration of Commercial Operation of Unit-1 (800 MW) of Gadarwara Super Thermal Power Station (2 X 800 MW) View/Download
May 27, 2019 Reg.24(A)-Annual Secretarial Compliance View/Download
May 25, 2019 Submission of Annual Audited Results (Standalone and Consolidated) of NTPC Ltd. for the Financial Year ended March 31,2019 and Recommendation of Final Dividend for the Financial Year 2018-19. View/Download
May 25, 2019 Key Performance Highlights of NTPC Ltd. for the Quarter and Year ended March 31, 2019 View/Download
May 25, 2019 Outcome of the Board meeting regarding recommending Final Dividend for the financial year 2018-19 and approval of Annual Audited Results (Standalone and Consolidated) of NTPC Ltd. for the Financial Year ended March 31, 2019 View/Download
May 21, 2019 Newspaper publication regarding Notice of Board Meeting View/Download
May 21, 2019 NTPC Ltd. Will Hold A Conference Call on May 25, 2019, wherein Senior Management Team of NTPC Ltd. will discuss the Company's Results for Q4 FY19 along with FY19. View/Download
May 21, 2019 NTPC Ltd. will hold a conference call for analysts and investors at 4.00 PM India time on May 25, 2019, where Senior Management team of NTPC comprising of Mr. K.Sreekant, Director (Finance), Mr. S. Roy, Director (Human Resources), Mr. A.K. Gupta, Director (Commercial), Mr. S. K. Roy, Director (Projects), Mr. P.K.Mohapatra, Director (Technical), Mr. Prakash Tiwari, Director (Operations) and Mr. Sudhir Arya, Chief Financial Officer & Executive Director (Finance) will discuss the Company’s results for the 4th quarter and the financial year 2018-19 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number/Secondary +91 22 6280 1259
+91 22 7115 8160
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 70 4567 1221
Toll-free number International Toll
USA 1 866 746 2133 132-3386 8721
UK 0 808 101 1573 44 20 3478 5524
Hong Kong 800 964 448 85 23018 6877
Singapore 800 101 2045 65 3157 5746
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following may be contacted:

Harsh Dole
IIFL– Institutional Equities
Tel. No.: +91 22 4646 4660
(harsh.dole@iiflcap.com)

Regards
Aditya Dar
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 1018
Email: adityadar@ntpc.co.in
-
May 21, 2019 Intimation of Initial Disclosure to be made by an entity identified as a Large Corporate View/Download
May 17, 2019 Board Meeting Intimation for Annual Standalone and Consolidated Financial Statements and Recommendation of Dividend for the year ended on March 31, 2019
Intimation Regarding Holding of Meeting of the Board of Directors
Intimation Regarding Closure of Trading Window
View/Download
May 17, 2019 Closure of Trading Window View/Download
May 14, 2019 NTPC Wins 100 MW Solar Capacities in Solar Energy Corporation of India'S (SECI) 250 MW Tender For Dondaicha Solar Park, Maharashtra View/Download
May 08, 2019 Announcement under Regulation 30 (LODR)-Code of Conduct under SEBI (PIT) Regulations, 2015 View/Download
Apr 30, 2019 NTPC to raise Rs. 3,056.50 Crore on May 3, 2019 through Private Placement of Secured Non-Convertible Bonds in the nature of Debentures at a coupon of 7.93% P.A. View/Download
Apr 29, 2019 Declaration Of Commercial Operation Of Unit-1 (800 MW) of Gadarwara Super Thermal Power Station (2 X 800 MW) View/Download
Apr 29, 2019 Withdrawal of Disclosure on Declaration of Commercial Operation of Unit#1 (800 MW) of Gadarwara Super Thermal Power Station (2 X 800 MW) View/Download
Apr 29, 2019 Declaration of Commercial Operation of Unit#1 (660 MW) of Meja Thermal Power Station Stage-I (2 X 660 MW) of Meja Urja Nigam (P) Ltd. View/Download
Apr 25, 2019 Cessation of Ms. Archana Agrawal (DIN: 02105906), Joint Secretary (Thermal) as Govt. Nominee Director of NTPC w.e.f. 22.04.2019 View/Download
Apr 19, 2019 The status of investors complaints/grievances for the quarter ending 31.03.2019. View/Download
Apr 15, 2019 Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ended 31.03.2019 View/Download
Apr 12, 2019 Compliance Certificate under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ended on 31.03.2019 View/Download
Apr 10, 2019 Initial Disclosure as a Large Corporate Borrower View/Download
Apr 03, 2019 Closure of Trading Window View/Download
Apr 02, 2019 Clarification On News Item "NTPC- Simhadri Setting Up Floating Solar Power Plant" View/Download
Apr 02, 2019 Capacity Addition of 1St Unit Of 800 MW of Gadarwara Super Thermal Power Project (2X800 MW) View/Download
Apr 01, 2019 Declaration of Commercial Operation of Pakri Barwadih Coal Mine View/Download
Mar 28, 2019 Declaration of Commercial Operation of Unit-2 (660 MW) of Solapur Super Thermal Power Station (2 X 660 MW) View/Download
Mar 27, 2019 Issue of U.S.D Denominated 3.75% USD 450,000,000 Notes due 2024 payable in U.S. Dollars ('Notes') issued pursuant to USD 6,000,000,000 Medium term Note Programme by NTPC Limited View/Download
Mar 25, 2019 Declaration of Commercial Operation of Unit-3 (250 MW) of Bongaigaon Thermal Power Project (3 X 250 MW) View/Download
Mar 23, 2019 Outcome of the meeting of Committee of Directors for allotment of 164,90,92,880 Equity Shares of Rs. 10/- each as Bonus shares View/Download
Mar 12, 2019 Voting Result of the Postal Ballot for capitalization of reserves & issue of bonus shares View/Download
Mar 08, 2019 Intimation of Record Date for the purpose of ascertaining the eligibility of shareholders entitled for issuance of Bonus Shares of the Company View/Download
Feb 23, 2019 News Clarification on Media Report- 'Coal Mine 10-Day Stir Shrinks NTPC Kaniha Generation By 40%' View/Download
Feb 22, 2019 News Clarification on News Item "Tribunal Passes Rs.2000Cr Award in Favour of Jindal ITF" View/Download
Feb 22, 2019 Unit#3 of 250 MW of Nabinagar Thermal Power Project (4 X 250 MW) of Bhartiya Rail Bijlee Company Ltd. (BRBCL), a subsidiary of NTPC Limited has been declared on commercial operation w.e.f 14:00 Hrs of 20.02.2019 View/Download
Feb 18, 2019 Change in Directorate Additional charge to the post of Director (Finance), NTPC Limited to Shri K. Sreekant, Director (Finance) Power Grid Corporation India Limited for a period of six months w.e.f. 12.2.2019 or till the appointment of a regular incumbent or until further orders, whichever is the earliest. View/Download
Feb 12, 2019 Newspaper Publication in respect of Postal Ballot for issue of Bonus Shares View/Download
Feb 09, 2019 Notice of Postal Ballot circulated to shareholders for seeking their consent for capitalization of reserve and issue of bonus shares View/Download
Jan 30, 2019 Corporate Action-Board recommends Bonus Issue View/Download
Jan 30, 2019 Outcome of the Board Meeting regarding- Unaudited Financial Results for the Quarter and Nine-months ended December 31, 2018, Declaration of Interim Dividend for the Financial Year 2018-19 and recommendation of issue of Bonus shares. View/Download
Jan 30, 2019 Key Performance Highlights Q3 FY 18-19 View/Download
Jan 30, 2019 Corporate Action- Declaration of Interim Dividend for the Financial Year 2018-19. View/Download
Jan 25, 2019 Intimation of Conference Call Q3 FY 19 View/Download
Jan 25, 2019 NTPC Ltd. will hold a conference call for analysts and investors at 4.00 PM India time on January 30, 2019, where Senior Management team of NTPC comprising of Mr. S. Roy, Director (Human Resources & Finance), Mr. A.K. Gupta, Director (Commercial), Mr. S. K. Roy, Director (Projects) Mr. P.K.Mohapatra, Director (Technical), Mr. Prakash Tiwari, Director (Operations) and Mr. Sudhir Arya, Chief Financial Officer & Executive Director (Finance) will discuss the Company’s results for 3rd quarter of the financial year 2018-19 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number
+91 22 6280 1144

+91 22 7115 8045

The number listed above is universally accessible from all networks and all countries
Local Access Number (India) +91 704 567 1221
Toll-free number International Toll
USA 1 866 746 2133 132-3386 8721
UK 0 808 101 1573 44 20 3478 5524
Hong Kong 800 964 448 85 23018 6877
Singapore 800 101 2045 65 3157 5746
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following person may be contacted:

Rahul Modi
ICICI Securities Ltd.
Tel. No.: +91 22 6637 7373
(Rahul.modi@icicisecurities.com

Regards

Aditya Dar

General Manager(Finance)

Investor Services Department

Tel No. 011 2436 7072

Fax No. 011 2436 0849

Email: adityadar@ntpc.co.in
-
Jan 21, 2019 Status of investors complaints for the quarter ending 31.12.2018 View/Download
Jan 19, 2019 Intimation of fixation of Record Date for Interim Dividend for the Financial Year 2018-19 View/Download
Jan 18, 2019 Closure of Trading Window View/Download
Jan 18, 2019 Board Meeting Intimation for
- Un-Audited Financial Results for the Quarter and Nine Months ended on December 31, 2018
- Declaration of Interim Dividend for The Financial Year 2018-19
- Issuance of Bonus Shares
- Fixation of Record Date For Payment Of Interim Dividend For The Year 2018-19
View/Download
Jan 11, 2019 NTPC to raise Rs.4,000 Crore through Private Placement of Secured Non-Convertible Bonds in the Nature of Debentures at a coupon of 8.30% P.A. View/Download
Jan 07, 2019 Consequent upon the completion of tenure of Shri Kulamani Biswal, Director (Finance), NTPC on 08.12.2018, Shri Saptarshi Roy, Director (HR), NTPC will hold the additional charge of the post of Director (Finance) of NTPC Limited for a period of three (3) months View/Download
Dec 26, 2018 Investment Approval of 140 MW Bilhaur and 20 MW Auraiya Solar PV Project View/Download
Dec 20, 2018 Pursuant to Regulation 7(2)(b) of Securities and Exchange Board of India (Prohibition of Insider Trading) Regulations, 2015, please find attached the disclosure in Form C under Regulation 7(2)(a) of the aforesaid Regulations by Ministry of Power acting on behalf of the President of India, Government of India for off-market sale of 23,40,12,589 shares of NTPC through third Further Fund Offer managed by Reliance Nippon Life Asset Management Limited (AMC).
The shareholding of President of India, Government of India in NTPC, after above sale, is 58.93%.
View/Download
Dec 18, 2018 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for The President of India Ministry of Power, Government of India View/Download
Dec 18, 2018 Restoration of Unit#6 (500 MW) of Feroze Gandhi Unchahar Thermal Power Station View/Download
Dec 16, 2018 Acquisition of Barauni Thermal Power Station View/Download
Dec 10, 2018 Cessation of Shri Kulamani Biswal as Director on the Board of NTPC Limited due to completion of tenure. View/Download
Dec 05, 2018 NTPC Wins 85 MW Solar Capacities in Uttar Pradesh New and Renewable Energy Development Agency'S (UPNEDA) 550 MW Solar Tender View/Download
Dec 03, 2018 Intimation of Re-appointment of Dr. Gauri Trivedi, Ex-IAS Officer, as Independent Director (Non-Official Independent Director) on the Board of NTPC Limited View/Download
Nov 16, 2018 Cessation of Dr. Gauri Trivedi, Ex-IAS Officer, as Independent Director (Non-Official Part-Time Director) due to completion of tenure View/Download
Nov 05, 2018 Hon'ble Delhi High Court had vide its judgement dated 31st October 2018, quashed and set aside the order of Ministry of Power dated 14th December 2017 regarding suspension of Shri Kulamani Biswal, Director (Finance), NTPC. View/Download
Nov 02, 2018 NTPC Key Performance Highlights H1/Q2 FY19 View/Download
Nov 02, 2018 Board Meeting outcome regarding un-audited Financial Results of the Company for Quarter and Half-Year ended September 30, 2018 View/Download
Oct 25, 2018 Intimation of Board Meeting to consider and approve Un-Audited Financial Results for the quarter and half year ended September 30, 2018 View/Download
Oct 25, 2018 NTPC Ltd. will hold a conference call for analysts and investors at 4.00 PM IST on November 2, 2018, where Senior Management team of NTPC comprising of Mr. K.Sreekant, Director (Finance), Mr. S. Roy, Director (Human Resources), Mr. A.K. Gupta, Director (Commercial), Mr. S.K. Roy, Director (Projects), Mr. P.K.Mohapatra, Director (Technical), Mr. Prakash Tiwari, Director (Operations) and Mr. Sudhir Arya, Chief Financial Officer & Executive Director (Finance) will discuss the Company’s results for 2nd quarter of the financial year 2018-19 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number +91 22 6280 1149; +91 22 7115 8050
The number listed above is universally accessible from all networks and all countries
Local Access Number (India) +91 704 567 1221
International Toll free
USA 1-866-746-2133
UK 0808-101-1573
Hong Kong 800-964-448
Singapore 800-101-2045
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following person may be contacted:

Mr.Sanjay Jain
Motilal Oswal Financial Services Ltd.
Tel. No.: +91 22 6129 1523
(sanjayjain@motilaloswal.com)

Regards

Aditya Dar

General Manager(Finance)

Investor Services Department

Tel No. 011 2436 7072

Fax No. 011 2436 0849

Email: adityadar@ntpc.co.in
-
Oct 25, 2018 Intimation of Conference Call Q2 FY19 View/Download
Oct 25, 2018 Closure of Trading Window View/Download
Oct 16, 2018 Status of investors complaints for the quarter ending 30.09.2018 View/Download
Oct 16, 2018 Compliance Certificate Under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year Ended 30.09.2018 View/Download
Oct 15, 2018 Operations of Badarpur Thermal Power Station, New Delhi having total installed capacity of 705 MW shall be discontinued w.e.f. 15th October 2018 View/Download
Oct 12, 2018 Compliance Certificate Under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year Ending on 30.09.2018 View/Download
Oct 12, 2018 Minutes of 42nd Annual General Meeting of NTPC Limited held on 20.09.2018 View/Download
Oct 11, 2018 NTPC Wins 160 MW Solar Capacities In Uttar Pradesh New And Renewable Energy Development Agency'S (UPNEDA) 500 MW Solar Tender View/Download
Oct 10, 2018 BF-NTPC Energy Systems Limited (BF-NTPC), a 49:51 Joint Venture Company between NTPC Limited and Bharat Forge Limited, has initiated a voluntary liquidation process under Insolvency and Bankruptcy Code, 2016 in its Extra-ordinary General Meeting held on 9th October, 2018. View/Download
Sep 21, 2018 Scrutinizer’s Report of 42nd Annual General Meeting held on 20th September 2018 View/Download
Sep 20, 2018 Proceedings of 42nd Annual General Meeting held on 20th September 2018 View/Download
Sep 17, 2018 The Board of Directors of the Company had, in its Meeting held on 8th September 2018, accorded investment approval for Talcher Thermal Power Project, Stage-III (2x660 MW) at an appraised current estimated cost of Rs. 9785.79 crore View/Download
Sep 17, 2018 Intimation of assigning of additional charge to the post of Director (Finance), NTPC Limited to Shri K. Sreekant, Director (Finance), PGCIL View/Download
Sep 14, 2018 Declaration of Commercial Operation of Unit#3 (800 MW) of Kudgi Super Thermal Power Project Stage-I (3 X 800 MW View/Download
Sep 11, 2018 News Clarification regarding "NTPC to invest Rs.9,785 crore for expansion of Talcher plant in Odisha". View/Download
Aug 27, 2018 Intimation of Newspaper Publication regarding 42nd Annual General Meeting of the Company View/Download
Aug 22, 2018 Intimation of fixation of Book Closure for Final Dividend & AGM (Cut-off date for e-voting) View/Download
Aug 21, 2018 Intimation of 42nd Annual General Meeting of the Members of the Company to be held on Thursday, September 20, 2018 at 10.30 A.M. at Manekshaw Centre, Parade Road, New Delhi – 110010 and submission of Annual Report View/Download
Aug 08, 2018 Intimation of appointment of Ms. Archana Agrawal (DIN: 02105906), Joint Secretary, (Thermal), Ministry of Power as Government Nominee Director on the Board of the Company in place of Shri Aniruddha Kumar till superannuation or till further orders, whichever is earlier. View/Download
Aug 01, 2018 Announcement under Regulation 30 (LODR)-Investor Presentation made at the 14th Annual Analysts and Investors Meet of NTPC Limited. View/Download
Aug 01, 2018 Change in Management- the Board of Directors has appointed Ms. Nandini Sarkar (FCS No. 4977) as Company Secretary & Compliance Officer w.e.f. 1st August, 2018 consequent upon superannuation of Shri K.P. Gupta w.e.f. 31st July, 2018. View/Download
Jul 30, 2018 Intimation of appointment of the following incumbents as Non-Official Independent Directors on the Board of NTPC Limited for a period of three years with effect from the date of notification of their appointment or until further orders, whichever is earlier: (i) Dr. K.P. Kylasanatha Pillay (ii) Dr. Bhim Singh View/Download
Jul 28, 2018 Outcome of Board Meeting regarding approval of the issue of secured/ unsecured, redeemable, taxable/ tax-free, cumulative/ non-cumulative, non-convertible debentures ('Bonds/NCDs') View/Download
Jul 28, 2018 Results Financial Results For Quarter Ended 30 June 2018 View/Download
Jul 28, 2018 Key Performance Highlights Q1 FY 2018-19 View/Download
Jul 28, 2018 Appointment of Statutory Auditor/s View/Download
Jul 25, 2018 Board Meeting Intimation for consider and approve issue of Secured/ Unsecured, Redeemable, Taxable/Tax-Free, Cumulative/ Non-Cumulative, Non-Convertible Debentures ('Bonds/NCDs) Upto Rs. 12,000 Crore during the period commencing from the date of passing of Special Resolution in the ensuing Annual General Meeting till completion of One Year thereof or the date of next Annual General Meeting in the Financial Year 2019-20 whichever is earlier, Redeemable, Taxable/Tax-Free, Cumulative/ Non-Cumulative, Non-Convertible Debentures ('Bonds/NCDs) Upto Rs. 12,000 Crore during the period commencing from the date of passing of Special Resolution in the ensuing Annual General Meeting till completion of One Year thereof or the date of next Annual General Meeting in the Financial Year 2019-20 whichever is earlier View/Download
Jul 20, 2018 Intimation of 14th Annual Analysts and Investors Meet to be organized on 1st August 2018 at Mumbai, wherein CMD and Board of Directors of the company will interact with the Analysts and Investors View/Download
Jul 19, 2018 Closure of Trading Window View/Download
Jul 19, 2018 Intimation of Board Meeting of NTPC to be held on Saturday, 28th July 2018 at New Delhi View/Download
Jul 17, 2018 Status of investors complaints for the quarter ending 30.06.2018 View/Download
Jul 04, 2018 Disclosures under Reg. 29(1) of SEBI (SAST) Regulations, 2011for ICICI Prudential Asset Management Company Ltd View/Download
Jun 29, 2018 Acquisition of Stake of Bihar State Power Generation Co. Ltd. (BSPGCL) in Kanti Bijlee Utpadan Nigam Limited (KBUN) & Nabinagar Power Generating Company Pvt. Limited View/Download
May 28, 2018 Outcome of the Board Meeting regarding Annual Audited Results (Standalone and Consolidated) of NTPC Ltd. for the Financial Year ended March 31,2018 and recommendation of Final Dividend for the Financial Year 2017-18 View/Download
May 28, 2018 Board recommends Final Dividend of Rs. 2.39 per equity share for the financial year 2017-18, subject to approval of the Shareholders in the ensuing Annual General Meeting View/Download
May 28, 2018 Key Performance Highlights for FY 2017-18 View/Download
May 21, 2018 Intimation of Conference Call Q4 FY18 And FY18 View/Download
May 21, 2018 NTPC Ltd. will hold a conference call for analysts and investors at 4.00 PM India time on May 28, 2018, where Senior Management team of NTPC comprising of Mr. K.Sreekant, Director (Finance), Mr. S.K. Roy, Director (Projects), Mr. P.K.Mohapatra, Director (Technical), Mr. Prakash Tiwari, Director (Operations) and Mr. Sudhir Arya, Chief Financial Officer & Executive Director will discuss the Company’s results for 4th quarter and financial year 2017-18 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number +91 22 6608 5354
The number listed above is universally accessible from all networks and all countries
Local Access Number (India) +91 22 3946 2424
International Toll
USA 1-855-924-9589
UK 0800-031-5725
Hong Kong 800-905-107
Singapore 800-852-6178
A transcript of the conference call will be available on Company’s website post the conference call.



For any further enquiries regarding the conference call the following person may be contacted:

Mr.Charanjit Singh / Mr.Ashwani Sharma

Batlivala & Karani Securities India Pvt. Ltd.

Tel. No.: +91 22 4031 7263/ 4031 7270

(charanjit.singh@bksec.com / ashwani.sharma@bksec.com)


Regards

Aditya Dar

General Manager(Finance)

Investor Services Department

Tel No. 011 2436 7072

Fax No. 011 2436 0849

Email: adityadar@ntpc.co.in
-
May 17, 2018 Intimation of Board Meeting of NTPC to be held on Monday, 28th May 2018 View/Download
May 17, 2018 Board to consider Final Dividend View/Download
May 17, 2018 Intimation regarding Closure of Trading Window View/Download
May 17, 2018 Board Meeting to consider recommendation of final dividend for FY 2017-18, if any, subject to approval of shareholders in the ensuing Annual General Meeting. View/Download
May 15, 2018 MOU With Government of Bihar (GoB) And Bihar Power Utilities View/Download
Apr 28, 2018 Intimation of appointment of Shri Vivek Kumar Dewangan, JS & FA, Ministry of Power as Government Nominee Director on the Board of NTPC till the date of superannuation or till further orders, whichever is earlier. View/Download
Apr 20, 2018 Status of investors complaints for the quarter ending 31.03.2018 View/Download
Apr 17, 2018 Compliance Certificate Under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ended on 31.03.2018 View/Download
Apr 16, 2018 Compliance Certificate Under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations And Disclosure Requirements) Regulations, 2015 for the Half-Year ended on 31.03.2018 View/Download
Apr 02, 2018 Commissioning of 1St Unit Of 660 MW of Meja Thermal Power Project (2X660 MW) of Meja Urja Nigam Pvt. Ltd. (A JV Company Of NTPC Limited) of Meja Urja Nigam Pvt. Ltd. (A JV Company Of NTPC Limited) View/Download
Mar 29, 2018 Announcement under Regulation 30 (LODR)-Change in Directorate Additional charge to the post of Director (Finance), NTPC Limited to Shri Kandikuppa Sreekant, Director (Finance), PGCIL India Limited View/Download
Mar 23, 2018 Commissioning of 1St Unit Of 800 MW of Lara Super Thermal Power Project (Stage-I: 2X800 MW View/Download
Mar 23, 2018 NTPC Strikes Coal at Dulanga Coal Mine View/Download
Mar 13, 2018 Announcement under Regulation 30 (LODR)-Updates Issue of U.S.$ 400,000,000 4.50 per cent Notes due 2028 issued pursuant to U.S.$6,000,000,000 medium term note programme by NTPC Limited (the 'Issuer') View/Download
Mar 13, 2018 Announcement under Regulation 30 (LODR)-Updates 3rd unit of 800 MW of Kudgi Super Thermal Power Station (3 x 800 MW) has been commissioned on 12.03.2018. View/Download
Mar 05, 2018 Announcement under Regulation 30 (LODR)-Updates Declaration of Commercial Operation of Unit#1 & 2 (2 x 4 MW) of Singrauli Small Hydro Electric Power Project View/Download
Jan 31, 2018 Key Performance Highlights of NTPC Ltd. for the quarter and nine-months ended December 31, 2017. View/Download
Jan 31, 2018 Appointment of Director The Board has appointed Shri Prasant Kumar Mohapatra as Director (Technical) of NTPC w.e.f. 31.01.2018 and Shri Prakash Tiwari as Director (Operations) of NTPC w.e.f. 31.01.2018. View/Download
Jan 31, 2018 Financial Results Dec 31, 2017 View/Download
Jan 31, 2018 In terms of the Regulation 7 of SEBI (LODR) Regulations 2015, tripartite agreement between NTPC Limited (the Company), M/s Karvy Computershare Pvt. Limited (the previous RTA) and M/s Alankit Assignments Limited (the New RTA) has been executed on 23.01.2018 and the same has been placed before the meeting of the Board of Directors held today i.e.31.01.2018. View/Download
Jan 31, 2018 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for Life Insurance Corporation of India View/Download
Jan 31, 2018 Board declares Interim Dividend for the financial year 2017-18 View/Download
Jan 25, 2018 This has reference to NSE mail dated 24.01.2018 seeking clarification on recent news item appearing in Indian Express dated January 24, 2018, titled 'CBI registers FIR against PSU staff, others in coal import case'. View/Download
Jan 25, 2018 This has reference to BSE mail dated 24.01.2018 seeking clarification on recent news item appearing in the Hindu dated January 24,2018 titled 'CBI to investigate NTPC,MMTC,others over coal imports'. View/Download
Jan 25, 2018 In terms of Regulation 30 of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, we wish to inform that NTPC Ltd. will hold a conference call on January 31, 2018, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for 3rd quarter of financial year 2017-18 and interact with the Analysts and Investors. For further details, please refer to NTPC website View/Download
Jan 25, 2018 NTPC Ltd. will hold a conference call for analysts and investors at 4.30 PM India time on January 31, 2018, where Senior Management team of NTPC comprising of Mr. S. Roy, Director (Human Resources & Finance), Mr. A.K. Gupta, Director (Commercial & Operations), Mr. S. K. Roy, Director (Projects) and Mr. Sudhir Arya, Chief Financial Officer & Executive Director will discuss the Company’s results for 3rd quarter of financial year 2017-18 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number +91 22 3938 1074
The number listed above is universally accessible from all networks and all countries
Local Access Number (India) +91 70 4567 1221
Toll-free number International Toll
USA 1 866 746 2133 132-3386 8721 (Los Angeles)
UK 0 808 101 1573 44 20 3478 5524 (London)
Hong Kong 800 964 448 85 23018 6877
Singapore 800 101 2045 65 3157 5746

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following person may be contacted:

Rahul Modi
ICICI Securities Ltd.
Tel. No.: +91 22 6637 7373
(Rahul.modi@icicisecurities.com)


Regards
Aditya Dar
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 0849
Email: adityadar@ntpc.co.in
-
Jan 21, 2018 Appointment of Director Shri Susanta Kumar Roy, Executive Director, NTPC has been appointed as Director (Projects) of NTPC w.e.f. 19.01.2018 instead of 19.01.2017 as intimated day before yesterday. View/Download
Jan 19, 2018 NTPC Fixes Record Date As Thursday, February 8, 2018 For Declaration Of Interim Dividend, If Approved By The Board In Its Meeting To Be Held On Wednesday, January 31, 2018 View/Download
Jan 19, 2018 Closure of Trading Window View/Download
Jan 19, 2018 Appointment of Director Appointment of Shri Susanta Kumar Roy, Executive Director, NTPC as Director (Projects) of NTPC Limited View/Download
Jan 19, 2018 Intimation of Board Meeting of the Company is scheduled to be held at New Delhi on Wednesday, January 31, 2018 View/Download
Jan 19, 2018 Statement Of Investors Complaints For The Quarter Ended December 31, 2017 View/Download
Jan 19, 2018 Board to consider Q3 results & Interim Dividend on Jan 31, 2018 View/Download
Dec 29, 2017 Designation of Shri Sudhir Arya, Executive Director (Finance) as Chief Financial Officer of NTPC Limited, View/Download
Dec 29, 2017 Unit#2 of 800 MW of Kudgi Super Thermal Project, Stage-I (3 X 800 MW) will be declared on commercial operation w.e.f 00:00 Hrs of 31.12.2017. View/Download
Dec 18, 2017 Corporate Disclosure : Revision in Installed Capacity of NTPC Group- Patratu Vidyut Utpadan Nigam Limited (PVUNL) (a subsidiary of NTPC Limited) View/Download
Dec 15, 2017 In continuation with our clarification dated 11th December, 2017, this to intimate that NTPC has been informed by the Ministry of Power, Government of India vide order dated 14th December, 2017 that the competent authority, in exercise of the powers conferred under NTPC Conduct Discipline and Appeal Rule 1977, has placed Shri Kulamani Biswal, Director (Finance), NTPC under suspension with immediate effect View/Download
Dec 11, 2017 This has reference to NSE mail dated 11.12.2017 seeking clarification on recent news item appearing in Economic Times dated December 09, 2017, titled 'CBI registers corruption case against NTPC finance director'. View/Download
Dec 11, 2017 This has reference to BSE mail dated 11.12.2017 seeking clarification on recent news item appearing in Financial Express dated December 09, 2017, titled 'CBI books NTPC director-finance for corruption'. View/Download
Dec 01, 2017 Change in RTA This is to inform that NTPC Limited has appointed M/s Alankit Assignments Limited, Alankit Heights,1E/13,Jhandewalan Extension, New-Delhi-110055 as Registrar & Share Transfer Agent of the company with effect from 1st December 2017 in place of M/s Karvy Computershare Pvt. Limited, Hyderabad. View/Download
Nov 13, 2017 Submission of Unaudited Financial Results for the Quarter and Half-Year ended September 30, 2017 View/Download
Nov 13, 2017 Key Performance Highlights of NTPC Ltd. for the quarter and half-year ended on September 30, 2017 View/Download
Nov 09, 2017 In terms of Regulation 30 of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, we wish to inform that NTPC Ltd. will hold a conference call on November 13, 2017, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for 2nd quarter and of financial year 2017-18 and interact with the Analysts and Investors View/Download
Nov 09, 2017 NTPC Ltd. will hold a conference call for analysts and investors at 3.30 PM India time on November 13, 2017, where Senior Management team of NTPC comprising of Mr. K. Biswal, Director (Finance), Mr. S. Roy, Director (HR) & Mr. A.K. Gupta, Director (Commercial) will discuss the Company’s results for 2nd quarter of financial year 2017-18 and answer questions from participants.

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.

India Access:
Primary Number/Secondary +91 22 3960 0663
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 22 3940 3977
Toll-free number International Toll
USA 1 866 746 2133 132-3386 8721 (Los Angeles)
UK 0 808 101 1573 44 20 3478 5524 (London)
Hong Kong 800 964 448 85 23018 6877
Singapore 800 101 2045 65 3157 5746

A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following person may be contacted:

Harsh Dole
IIFL– Institutional Equities
Tel. No.: +91 22 4646 4660
(harsh.dole@iiflcap.com)

Regards
Aditya Dar
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 0849
Email: adityadar@ntpc.co.in
-
Nov 09, 2017 Consequent upon successful commissioning, 50 MW (25 X 2 MW) Rojmal Wind Project at Rojmal, Gujarat is declared on commercial operation w.e.f 00:00 Hrs. of 10.11.2017 View/Download
Nov 03, 2017 Updates Reply to Clarification sought by NSE on disclosure made by the company on 02.11.2017 regarding shutdown of Unit#6 (500 MW) of Feroze Gandhi Unchahar Thermal Power Station View/Download
Nov 03, 2017 Intimation of meeting of the Board of Directors of the Company is scheduled to be held at New Delhi on Monday, 13th November 2017 View/Download
Nov 02, 2017 This is to inform that Unit#6 (500 MW) of Feroze Gandhi Unchahar Thermal Power Station, Raebareli,U.P.,is under shutdown after an accident in the evening of 01.11.2017. The other five units of the station are operating normally View/Download
Nov 01, 2017 Cessation Shri Kaushal Kishore Sharma has ceased to be Director (Operations) of NTPC Limited on attaining superannuation on 31.10.2017 View/Download
Oct 31, 2017 Unit#2 of 250 MW of Bongaigaon Thermal Power Project (3 X 250 MW) will be declared on commercial operation w.e.f 00:00 Hrs of 01.11.2017. View/Download
Oct 26, 2017 Confirmation Certificate NTPC Ltd has informed BSE regarding 'In compliance of para 2.4 of SEBI circular CIR/IMD/DF-1/ 67 /2017 dated 30.06.2017, it is certified that an enabling provision has been in inserted in Articles of Association of NTPC Limited to carry out consolidation and re-issuance of debt securities through passing of Special resolution in company's Annual General Meeting held on 20.09.2017.Further,it is also certified that as per clause (a) of Regulation 20A of SEBI(ILDS) Regulations 2008 the articles of association of NTPC Limited does not have any provision, whether express or implied, contrary to such consolidation and re-issuance. View/Download
Oct 25, 2017 Change in Directorate Cessation and Appointment of Independent Directors View/Download
Oct 18, 2017 Status of Investors Complaints for the Quarter ending on 30.09.2017 View/Download
Oct 16, 2017 Minutes of 41St Annual General Meeting of NTPC held on 20.09.2017 View/Download
Oct 13, 2017 Compliance Certificate under Regulation 40(9) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half Year ended on 30.09.2017 View/Download
Oct 13, 2017 Compliance Certificate under Regulation 7(3) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 for the Half-Year ending on 30.09.2017 View/Download
Oct 06, 2017 In terms of regulation 57(1) of the SEBI (LODR) Regulations, 2015, we confirm that the Interest Payment for the following ISINs of NTPC Ltd. Bonds has been made on 05.10.2017:- View/Download
Sep 28, 2017 We wish to inform that 500 MW Unit#1 of Feroze Gandhi Unchahar Thermal Power Station, Stage-IV (1 X 500 MW) will be declared on commercial operation w.e.f 00:00 Hrs of 30.09.2017 View/Download
Sep 27, 2017 We wish to inform that Central Electricity Regulatory Commission vide its order uploaded on its website on 25.09.2017, in petition no. 130/MP/2015 filed by M/s GRIDCO of Odisha, has inter-alia decided the Commercial Operation Date of Unit-1 (660 MW) of Barh Super Thermal Power Station, Stage-II (2x660 MW) as 08.03.2016 instead of 15.11.2014. View/Download
Sep 27, 2017 In continuation of our disclosure dated 11.09.2017, we wish to inform that 50 MW capacity, Rojmal Wind Energy Project of NTPC Limited in Gujarat has been fully commissioned. View/Download
Sep 21, 2017 Scrutinizer's Report 41st Annual General Meeting of the Company View/Download
Sep 20, 2017 In continuation of our disclosure dated 06.09.2017 on the above subject, we wish to inform that the offer to the eligible employees of NTPC Limited ('Eligible Employees') was opened on September 11,2017 (10.00 AM).The offer remained open from September 11, 2017 (10.00 AM) to September 13, 2017 (05.00 PM) ('Offer Period'). Applications from the Eligible Employees were received by NTPC Limited during the Offer Period and allotment of 94,69,848 equity shares to 4,585 successful Eligible Employees was made on September 19, 2017. View/Download
Sep 20, 2017 Outcome of AGM Summary of proceedings of 41st Annual General Meeting of NTPC Limited held on 20.09.2017. View/Download
Sep 13, 2017 We wish to inform that Unit#2 of 660 MW of Mouda Super Thermal Station, Stage-II (2 X 660 MW) will be declared on commercial operation w.e.f 00:00 Hrs of 18.09.2017. View/Download
Sep 11, 2017 We wish to inform that 40 MW out of 50 MW of Rojmal Wind Energy Project of NTPC Limited in Gujarat has been commissioned View/Download
Sep 06, 2017 Updates on Offer for Sale of Shares by Promoter View/Download
Sep 06, 2017 In accordance with the approval accorded by Alternative Mechanism (AM), Government of India (GOI) has offered 2,74,02,498 Equity Shares of Rs. 10/- each to the eligible employees of NTPC Ltd. at discounted price of Rs. 159.60 per share (5% discount to the cut off price of Rs.168/- ,the cut off price for the OFS discovered through the Offer For Sale of equity shares of NTPC carried out by GOI on 29.08.2017 and 30.08.2017 View/Download
Sep 01, 2017 In line with the Corporate Disclosure requirements, we wish to inform that consequent upon successful commissioning of 250 MW capacity (5 x 50 MW), Mandsaur Solar PV Project at Mandsaur,MP, is declared on commercial operation w.e.f 00:00 Hrs of 01.09.2017. View/Download
Sep 01, 2017 Change in Directorate In line with the Corporate Disclosure requirements, we wish to inform that Shri Subhash Chandra Pandey has ceased to be Director (Projects) of NTPC Limited on attaining superannuation on 31.08.2017 View/Download
Sep 01, 2017 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for President of India represented by the Ministry of Power, Government of India View/Download
Aug 31, 2017 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for Life Insurance Coporation of India View/Download
Aug 30, 2017 Disclosures under Reg. 29(2) of SEBI (SAST) Regulations, 2011 for President of India represented by the Ministry of Power, Government of India View/Download
Aug 28, 2017 Notice Published in Newspaper in respect of 41St AGM, Book Closure and Remote E-Voting View/Download
Aug 28, 2017 Notice of Offer for Sale of Shares by Promoter & Floor Price View/Download
Aug 25, 2017 Cessation In line with the requirements of Regulations 30 of the SEBI (Listing Obligations & Disclosure Requirements) Regulations 2015, we wish to keep you informed that Dr. Pradeep Kumar, Director, NTPC Limited on being relieved from Ministry of Power on 31st July 2017 (A/N) has ceased to be Director on the Board of NTPC Limited . View/Download
Aug 22, 2017 Fixes Book Closure for Final Dividend & AGM (Cut-off date for e-voting) View/Download
Aug 22, 2017 NTPC Ltd has informed BSE that the 41st Annual General Meeting (AGM) of the Company will be held on September 20, 2017 View/Download
Aug 21, 2017 The Register Of Members And Share Transfer Books Of The Company Will Remain Closed From September 9, 2017 To September 20, 2017 (Both Days Inclusive). View/Download
Aug 21, 2017 41St Annual General Meeting Of The Members Of The Company Will Be Held On Wednesday, September 20, 2017 At 10.30 A.M. At Manekshaw Centre, Parade Road, New Delhi - 110010. View/Download
Aug 01, 2017 Updates In terms of Regulation 30 of SEBI (LODR) Regulations, 2015, we hereby submit the Investor Presentation made at the 13th Annual Analysts and Investors Meet of NTPC Limited. View/Download
Aug 01, 2017 Change in Directorate In line with the Corporate Disclosure requirements, we wish to keep you informed that Shri Anil Kumar Jha has ceased to be the Director (Technical) of NTPC Limited on attaining superannuation on 31.07.2017 View/Download
Jul 31, 2017 Updates In line with the Corporate Disclosure requirements, we wish to inform that Unit#1 of 800 MW of Kudgi Super Thermal Project, Stage-I (3 X 800 MW) is declared on commercial operation w.e.f 00:00 Hrs of 31.07.2017. View/Download
Jul 29, 2017 Updates Key Performance Highlights Q1 FY 2017-18 View/Download
Jul 29, 2017 Unaudited Financial Results For The Quarter Ended June 2017 View/Download
Jul 29, 2017 Outcome of Board Meeting View/Download
Jul 29, 2017 The Office of the Comptroller & Auditor General of India (C&AG) has appointed the following firms of Chartered Accountants as the Joint Statutory Auditors of the Company for the financial year 2017-18 vide their letter No./CA. V/COY/ CENTRAL GOVERNMENT, NTPC(7)/2 dated 11 July 2017:
1. M/s. T.R. Chadha & Co LLP, Chartered Accountants, New Delhi
2. M/s. P S D & Associates, Chartered Accountants, New Delhi
3. M/s. Sagar & Associates, Chartered Accountants, Hyderabad
4. M/s. Kalani & Co., Chartered Accountants, Jaipur
5. M/s. P A & Associates, Chartered Accountants, Bhubaneshwar
6. M/s. S K Kapoor & Co., Chartered Accountants, Kanpur
7. M/s. B.M. Chatrath & Co LLP , Chartered Accountants, Kolkata
View/Download
Jul 26, 2017 In continuation of our Notice of even no. dated 19.07.2017, it is hereby further intimated that in the meeting of the Board of Directors of the Company scheduled to be held at New Delhi on Saturday, 29th July 2017 View/Download
Jul 20, 2017 Un-Audited Financial Results For The Quarter Ended On June 30, 2017 - Intimation Regarding Holding Of Meeting Of The Board Of Directors View/Download
Jul 20, 2017 In line with the Corporate Disclosure requirements, we wish to inform that NTPC Limited is hosting its 13th Annual Analysts and Investors Meet on 1st August 2017 at Mumbai, wherein CMD and Board of Directors of the company will interact with the Analysts and Investors View/Download
Jul 20, 2017 Closure of Trading Window View/Download
Jul 11, 2017 The Status Of Investors Complaints For The Quarter Ending On 30.06.2017 View/Download
Jul 03, 2017 Updates We wish to inform that 2nd Unit of 195 MW of Muzaffarpur Thermal Power Station Stage-II (2 X 195 MW) of Kanti Bijlee Utpadan Nigam Limited (a subsidiary of NTPC Limited) is declared on commercial operation w.e.f 00:00 Hrs. of 01.07.2017. View/Download
Jun 16, 2017 Updates In continuation of our disclosure dated 02.06.2017, we wish to inform that 225 MW out of 250 MW of Mandsaur Solar Power Project of NTPC Limited has been commissioned. View/Download
Jun 02, 2017 Updates We wish to inform that 117 MW out of 250 MW of Mandsaur Solar Power Project of NTPC Limited has been commissioned. View/Download
May 29, 2017 Key Performance Highlights Q4 & FY 2016-17 View/Download
May 29, 2017 Outcome of Board Meeting Submission of Annual Audited Results for NTPC Ltd. for FY 2016-17 and recommendation of Final Dividend for FY 2016-17. View/Download
May 29, 2017 Board recommends Final Dividend View/Download
May 29, 2017 Annual Audited Results of NTPC Ltd. for the Financial Year ended March 31, 2017 View/Download
May 24, 2017 NTPC Ltd. will hold a conference call for analysts and investors at 3.30 PM India time on May 29, 2017, where Senior Management team of NTPC comprising of Mr. K. Biswal, Director (Finance), Mr. A.K.Jha, Director (Technical), Mr. S.C.Pandey, Director (Projects), Mr. K.K.Sharma, Director (Operations) & Mr. A.K. Gupta, Director (Commercial) will discuss the Company’s results for 4th quarter and of financial year 2016-17 and answer questions from participants

To participate in the conference call, please dial the numbers provided below five to ten minutes ahead of the scheduled start time. The operator will provide instructions on asking questions before the call.


India Access:
Primary Number/Secondary +91 22 3960 0663
The numbers listed above is universally accessible from all networks and all countries
Local Access Number +91 22 6000 1221
+91 22 3940 3977
Toll-free number International Toll
USA 1 866 746 2133 132-3386 8721 (LosAngeles)
UK 0 808 101 1573 44 20 3478 5524 (London)
Hong Kong 800 964 448 85 23018 6877
Singapore 800 101 2045 65 3157 5746
A transcript of the conference call will be available on Company’s website post the conference call.

For any further enquiries regarding the conference call the following person may be contacted:

Harsh Dole
IIFL– Institutional Equities
Tel. No.: +91 22 4646 4660
(harsh.dole@iiflcap.com)

Regards
Sangeeta Bhatia
General Manager(Finance)
Investor Services Department
Tel No. 011 2436 7072
Fax No. 011 2436 0849
Email: sbhatia@ntpc.co.in
-
May 24, 2017 Updates In terms of Regulation 30 of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, we wish to inform that NTPC Ltd. will hold a conference call on May 29, 2017, wherein Senior Management team of NTPC Ltd. will discuss the Company's results for 4th quarter and of financial year 2016-17 and interact with the Analysts and Investors. For further details refer NTPC website View/Download
May 18, 2017 Board to consider Final Dividend View/Download
May 18, 2017 Closure of Trading Window View/Download
May 18, 2017 Board to consider FY17 results & Final Dividend on May 29, 2017 View/Download
Apr 26, 2017 Updates In accordance with corporate disclosures required under SEBI(LODR)Regulations,2015, we wish to inform you that the Issuer has launched an issue of INR 20000000000 notes due 2022 priced on April 25,2017 View/Download
Apr 26, 2017 Reply to Clarification on News 'Fitch assigns 'BBB(EXP)emr' rating to NTPC's masala bonds'. View/Download
Apr 25, 2017 Updates Notice to Proceed (NTP) to BHEL by Bangladesh India Friendship Power Company (Pvt.) Limited (BIFPCL) View/Download
Apr 19, 2017 Compliance Certificate Under Regulation 40 (9) Of The SEBI LODR Regulations, 2015 For The Half Year Ended On 31.03.2017 View/Download
Apr 19, 2017 Compliance Certificate Under Regulation 7(3) Of Securities And Exchange Board Of India (Listing Obligations And Disclosure Requirements) Regulations, 2015 For The Half Year Ending On 31.03.2017 View/Download
Apr 19, 2017 Updates Sub.: Corporate Disclosure
Updation and upsize of USD 4 billion MTN programme upto USD 6 billion and issuance of notes amounting upto INR 50 Billion (Rupee denominated bonds) and/or upto USD 750 million equivalent (Foreign Currency Bonds other than INR Denominated) thereunder in International Markets
View/Download
Apr 18, 2017 NTPC Ltd has informed BSE regarding Payment of Interest & Redemption. View/Download
Apr 11, 2017 Achievement of Financial Closure by Bangladesh India Friendship Power Company (Pvt.) Limited View/Download
Apr 11, 2017 Statement Of Investors Complaints For The Quarter Ended 31.03.2017. View/Download
Apr 07, 2017 Updates In line with the Corporate Disclosure requirements, we wish to inform that Unit#1 of 660 MW of Solapur Super Thermal Power Project has been commissioned. View/Download
Apr 04, 2017 Updates In line with the Corporate Disclosure requirements, we wish to inform that Unit#2 of 250 MW of Bhartiya Rail Bijlee Company Limited (BRBCL-a subsidiary of NTPC Limited) has been commissioned on 03.04.2017. View/Download
Apr 01, 2017 Updates NTPC is now a 50 GW+ Power Generating Company In line with the Corporate Disclosure requirements, we wish to inform that Unit#6 of 500 MW of Feroze Gandhi Unchahar Thermal Power Station has been commissioned on 31.03.2017. View/Download
Back to Top